Event List of Leg95
Download as tab-delimited text
Event label | Optional label | Method/Device | Abbreviation | O2A Registry URI | Date/Time | Latitude | Longitude | Elevation | Date/Time end | Latitude end | Longitude end | Elevation end | Comment |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
95-612_Site | Composite Core | COMPCORE | 1983-08-26T00:00:00 | 38.82020 | -72.77380 | 72 cores; 674.7 m cored; 0 m drilled; 85.9% recovery | |||||||
95-612 | Drilling/drill rig | DRILL | 1983-08-26T00:00:00 | 38.82020 | -72.77380 | -1386 | 72 cores; 674.7 m cored; 0 m drilled; 85.9 % recovery | ||||||
95-603B | Drilling/drill rig | DRILL | 1983-09-01T00:00:00 | 35.49520 | -70.02850 | -4633 | MECHANICAL OR EQUIP FAILURE | ||||||
95-603C | Drilling/drill rig | DRILL | 1983-09-01T00:00:00 | 35.49630 | -70.03100 | -4633 | TIME CONSTRAINTS | ||||||
95-603D | Drilling/drill rig | DRILL | 1983-09-01T00:00:00 | 38.49980 | -70.02350 | -4641 | 1 cores; 9.6 m cored; 0 m drilled; 98.6 % recovery | ||||||
95-603E | Drilling/drill rig | DRILL | 1983-09-01T00:00:00 | 35.49970 | -70.02280 | -4641 | 1 cores; 9.6 m cored; 0 m drilled; 6 % recovery | ||||||
95-603F | Drilling/drill rig | DRILL | 1983-09-01T00:00:00 | 35.49780 | -70.02270 | -4640 | 3 cores; 24.1 m cored; 0 m drilled; 73.9 % recovery | ||||||
95-603_Site | Composite Core | COMPCORE | 1983-09-01T00:00:00 | 36.49910 | -70.02300 | 5 cores; 43.3 m cored; 0 m drilled; 64.3% recovery | |||||||
95-603 | Drilling/drill rig | DRILL | 1983-09-01T00:00:00 | 35.49430 | -70.02830 | -4633 | OBJECTIVE REACHED | ||||||
95-603A | Drilling/drill rig | DRILL | 1983-09-01T00:00:00 | 35.49480 | -70.02820 | -4633 | MECHANICAL OR EQUIP FAILURE | ||||||
95-613 | Drilling/drill rig | DRILL | 1983-09-17T00:00:00 | 38.77100 | -72.52380 | -2309 | 48 cores; 455.3 m cored; 28.8 m drilled; 78.6 % recovery | ||||||
95-613_Site | Composite Core | COMPCORE | 1983-09-17T00:00:00 | 38.77100 | -72.52380 | 48 cores; 455.3 m cored; 28.8 m drilled; 78.6% recovery |