Event List of Leg94
Download as tab-delimited text
Event label | Optional label | Method/Device | Abbreviation | O2A Registry URI | Date/Time | Latitude | Longitude | Elevation | Date/Time end | Latitude end | Longitude end | Elevation end | Comment |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
94-606A | Drilling/drill rig | DRILL | 1983-07-02T00:00:00 | 37.33820 | -35.50030 | -3007 | 19 cores; 178.4 m cored; 0 m drilled; 87.6 % recovery | ||||||
94-606 | Drilling/drill rig | DRILL | 1983-07-02T00:00:00 | 37.33870 | -35.49980 | -3007 | 18 cores; 165.7 m cored; 0 m drilled; 93 % recovery | ||||||
94-606_Site | Composite Core | COMPCORE | 1983-07-02T00:00:00 | 37.33845 | -35.50005 | 37 cores; 344.1 m cored; 0 m drilled; 90.2% recovery | |||||||
94-607A | Drilling/drill rig | DRILL | 1983-07-06T00:00:00 | 41.00120 | -32.95730 | -3427 | 26 cores; 226.6 m cored; 0 m drilled; 90.5 % recovery | ||||||
94-607 | Drilling/drill rig | DRILL | 1983-07-06T00:00:00 | 41.00120 | -32.95730 | -3427 | 30 cores; 284.4 m cored; 0 m drilled; 87.4 % recovery | ||||||
94-607_Site | Composite Core | COMPCORE | 1983-07-06T00:00:00 | 41.00120 | -32.95730 | -3427 | 56 cores; 511 m cored; 0 m drilled; 88.8% recovery | ||||||
94-608 | Drilling/drill rig | DRILL | 1983-07-13T00:00:00 | 42.83670 | -23.08750 | -3526 | 59 cores; 529.3 m cored; 0 m drilled; 80.9 % recovery | ||||||
94-608A | Drilling/drill rig | DRILL | 1983-07-13T00:00:00 | 42.83670 | -23.08750 | -3526 | 16 cores; 146.4 m cored; 0 m drilled; 98.5 % recovery | ||||||
94-608_Site | Composite Core | COMPCORE | 1983-07-13T00:00:00 | 42.83670 | -23.08750 | 75 cores; 675.7 m cored; 0 m drilled; 84.7% recovery | |||||||
94-609C | Drilling/drill rig | DRILL | 1983-07-22T00:00:00 | 49.87780 | -24.23820 | -3883 | 6 cores; 57.6 m cored; 9.6 m drilled; 60.9 % recovery | ||||||
94-609B | Drilling/drill rig | DRILL | 1983-07-22T00:00:00 | 49.87780 | -24.23820 | -3883 | 37 cores; 345.1 m cored; 9.6 m drilled; 89.3 % recovery | ||||||
94-609A | Drilling/drill rig | DRILL | 1983-07-22T00:00:00 | 49.87780 | -24.23820 | -3884 | 2 cores; 19.2 m cored; 0 m drilled; 93.2 % recovery | ||||||
94-609 | Drilling/drill rig | DRILL | 1983-07-22T00:00:00 | 49.87780 | -24.23820 | -3884 | 40 cores; 380.2 m cored; 19.2 m drilled; 79.3 % recovery | ||||||
94-609_Site | Composite Core | COMPCORE | 1983-07-22T00:00:00 | 49.87780 | -24.23820 | -3883 | 85 cores; 802.1 m cored; 38.4 m drilled; 82.6% recovery | ||||||
94-610D | Drilling/drill rig | DRILL | 1983-07-28T00:00:00 | 53.22450 | -18.89480 | -2445 | 7 cores; 66 m cored; 0 m drilled; 82.1 % recovery | ||||||
94-610 | Drilling/drill rig | DRILL | 1983-07-28T00:00:00 | 53.22150 | -18.88680 | -2417 | 27 cores; 259.2 m cored; 0 m drilled; 68.9 % recovery | ||||||
94-610A | Drilling/drill rig | DRILL | 1983-07-28T00:00:00 | 53.22150 | -18.88680 | -2417 | 21 cores; 201 m cored; 0 m drilled; 95.2 % recovery | ||||||
94-610B | Drilling/drill rig | DRILL | 1983-07-28T00:00:00 | 53.22150 | -18.88680 | -2417 | 16 cores; 146.8 m cored; 0 m drilled; 92.9 % recovery | ||||||
94-610C | Drilling/drill rig | DRILL | 1983-07-28T00:00:00 | 53.22150 | -18.88680 | -2417 | 6 cores; 48.4 m cored; 0 m drilled; 90.7 % recovery | ||||||
94-610E | Drilling/drill rig | DRILL | 1983-07-28T00:00:00 | 53.22450 | -18.89480 | -2445 | 7 cores; 67.2 m cored; 0 m drilled; 79.3 % recovery | ||||||
94-610_Site | Composite Core | COMPCORE | 1983-07-28T00:00:00 | 53.22250 | -18.88947 | 84 cores; 788.6 m cored; 0 m drilled; 83.4% recovery | |||||||
94-611E | Drilling/drill rig | DRILL | 1983-08-06T00:00:00 | 52.84120 | -30.30970 | -3195 | 2 cores; 19.2 m cored; 0 m drilled; 100.1 % recovery | ||||||
94-611C | Drilling/drill rig | DRILL | 1983-08-06T00:00:00 | 52.83580 | -30.31830 | -3230 | 44 cores; 404 m cored; 28.8 m drilled; 85.2 % recovery | ||||||
94-611B | Drilling/drill rig | DRILL | 1983-08-06T00:00:00 | 52.83580 | -30.31830 | -3228 | 1 cores; 8.9 m cored; 0 m drilled; 100 % recovery | ||||||
94-611A | Drilling/drill rig | DRILL | 1983-08-06T00:00:00 | 52.84120 | -30.30970 | -3201 | 13 cores; 122.4 m cored; 9.6 m drilled; 82.3 % recovery | ||||||
94-611 | Drilling/drill rig | DRILL | 1983-08-06T00:00:00 | 52.84120 | -30.30970 | -3203 | 14 cores; 125.8 m cored; 0 m drilled; 89.2 % recovery | ||||||
94-611_Site | Composite Core | COMPCORE | 1983-08-06T00:00:00 | 52.83940 | -30.31257 | 88 cores; 805.1 m cored; 38.4 m drilled; 87.9% recovery | |||||||
94-611D | Drilling/drill rig | DRILL | 1983-08-06T00:00:00 | 52.84120 | -30.30970 | -3195 | 14 cores; 124.8 m cored; 0 m drilled; 98 % recovery |