Event List of Leg90
Download as tab-delimited text
Event label | Optional label | Method/Device | Abbreviation | O2A Registry URI | Date/Time | Latitude | Longitude | Elevation | Date/Time end | Latitude end | Longitude end | Elevation end | Comment |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
90-587_Site | Composite Core | COMPCORE | 1982-12-03T00:00:00 | -21.18470 | 161.33320 | -1101 | 13 cores; 108.6 m cored; 38.4 m drilled; 82% recovery | ||||||
90-587 | Drilling/drill rig | DRILL | 1982-12-03T00:00:00 | -21.18470 | 161.33320 | -1101 | 13 cores; 108.6 m cored; 38.4 m drilled; 82 % recovery | ||||||
90-588B | Drilling/drill rig | DRILL | 1982-12-06T00:00:00 | -26.11170 | 161.22670 | -1533 | 31 cores; 277.2 m cored; 0 m drilled; 92.1 % recovery | ||||||
90-588C | Drilling/drill rig | DRILL | 1982-12-06T00:00:00 | -26.11170 | 161.22670 | -1533 | 19 cores; 182.4 m cored; 0 m drilled; 73.8 % recovery | ||||||
90-588_Site | Composite Core | COMPCORE | 1982-12-06T00:00:00 | -26.11170 | 161.22670 | -1533 | 92 cores; 789.8 m cored; 19.2 m drilled; 88% recovery | ||||||
90-588A | Drilling/drill rig | DRILL | 1982-12-06T00:00:00 | -26.11170 | 161.22670 | -1533 | 18 cores; 103.8 m cored; 0 m drilled; 81.2 % recovery | ||||||
90-588 | Drilling/drill rig | DRILL | 1982-12-06T00:00:00 | -26.11170 | 161.22670 | -1533 | 24 cores; 226.4 m cored; 19.2 m drilled; 97.5 % recovery | ||||||
90-589_Site | Composite Core | COMPCORE | 1982-12-12T00:00:00 | -30.71200 | 163.63980 | 4 cores; 36.1 m cored; 0 m drilled; 97.1% recovery | |||||||
90-589 | Drilling/drill rig | DRILL | 1982-12-12T00:00:00 | -30.71200 | 163.63980 | -1391 | 4 cores; 36.1 m cored; 0 m drilled; 97.1 % recovery | ||||||
90-590 | Drilling/drill rig | DRILL | 1982-12-15T00:00:00 | -31.16700 | 163.35850 | -1299 | 3 cores; 26.2 m cored; 0 m drilled; 100.6 % recovery | ||||||
90-590B | Drilling/drill rig | DRILL | 1982-12-15T00:00:00 | -31.16700 | 163.35850 | -1299 | 53 cores; 499.1 m cored; 0 m drilled; 93.1 % recovery | ||||||
90-590_Site | Composite Core | COMPCORE | 1982-12-15T00:00:00 | -31.16700 | 163.35850 | -1299 | 82 cores; 770.3 m cored; 9.6 m drilled; 93% recovery | ||||||
90-590A | Drilling/drill rig | DRILL | 1982-12-15T00:00:00 | -31.16700 | 163.35850 | -1299 | 26 cores; 245 m cored; 9.6 m drilled; 91.9 % recovery | ||||||
90-591A | Drilling/drill rig | DRILL | 1982-12-19T00:00:00 | -31.58430 | 164.44870 | -2131 | 28 cores; 265.6 m cored; 19 m drilled; 89 % recovery | ||||||
90-591 | Drilling/drill rig | DRILL | 1982-12-19T00:00:00 | -31.58430 | 164.44870 | -2131 | 31 cores; 283.1 m cored; 0 m drilled; 97.7 % recovery | ||||||
90-591_Site | Composite Core | COMPCORE | 1982-12-19T00:00:00 | -31.58430 | 164.44870 | -2131 | 83 cores; 778.5 m cored; 19 m drilled; 82.7% recovery | ||||||
90-591B | Drilling/drill rig | DRILL | 1982-12-19T00:00:00 | -31.58430 | 164.44870 | -2131 | 24 cores; 229.8 m cored; 0 m drilled; 56.9 % recovery | ||||||
90-592_Site | Composite Core | COMPCORE | 1982-12-25T00:00:00 | -36.47330 | 165.44220 | -1088 | 40 cores; 378.9 m cored; 9.6 m drilled; 90.5% recovery | ||||||
90-592 | Drilling/drill rig | DRILL | 1982-12-25T00:00:00 | -36.47330 | 165.44220 | -1088 | 40 cores; 378.9 m cored; 9.6 m drilled; 90.5 % recovery | ||||||
90-593 | Drilling/drill rig | DRILL | 1982-12-28T00:00:00 | -40.50780 | 167.67450 | -1068 | 58 cores; 550.5 m cored; 19.2 m drilled; 85.3 % recovery | ||||||
90-593A | Drilling/drill rig | DRILL | 1982-12-28T00:00:00 | -40.50780 | 167.67450 | -1068 | 27 cores; 257.3 m cored; 0 m drilled; 88.5 % recovery | ||||||
90-593_Site | Composite Core | COMPCORE | 1982-12-28T00:00:00 | -40.50780 | 167.67450 | -1068 | 85 cores; 807.8 m cored; 19.2 m drilled; 86.3% recovery | ||||||
90-594A | Drilling/drill rig | DRILL | 1983-01-03T00:00:00 | -45.52350 | 174.94800 | -1204 | 26 cores; 262.2 m cored; 0 m drilled; 61.6 % recovery | ||||||
90-594 | Drilling/drill rig | DRILL | 1983-01-03T00:00:00 | -45.52350 | 174.94800 | -1204 | 50 cores; 475.3 m cored; 28.8 m drilled; 63.3 % recovery | ||||||
90-594_Site | Composite Core | COMPCORE | 1983-01-03T00:00:00 | -45.52350 | 174.94800 | -1204 | 81 cores; 780.4 m cored; 28.8 m drilled; 63.6% recovery | ||||||
90-594B | Drilling/drill rig | DRILL | 1983-01-03T00:00:00 | -45.52350 | 174.94800 | -1204 | 5 cores; 42.9 m cored; 0 m drilled; 79.7 % recovery |