Event List of Leg70
Download as tab-delimited text
Event label | Optional label | Method/Device | Abbreviation | O2A Registry URI | Date/Time | Latitude | Longitude | Elevation | Date/Time end | Latitude end | Longitude end | Elevation end | Comment |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
70-506G | Drilling/drill rig | DRILL | 1979-11-15T00:00:00 | 0.60980 | -86.09150 | -2703 | 2 cores; 5 m cored; 0 m drilled; 21 % recovery | ||||||
70-506H | Drilling/drill rig | DRILL | 1979-11-15T00:00:00 | 0.60700 | -86.09130 | -2706 | 1 cores; 8 m cored; 0 m drilled; 2.1 % recovery | ||||||
70-506I | Drilling/drill rig | DRILL | 1979-11-15T00:00:00 | 0.60770 | -86.09130 | -2707 | 1 cores; 3.5 m cored; 0 m drilled; 5.7 % recovery | ||||||
70-506_Site | Composite Core | COMPCORE | 1979-11-15T00:00:00 | 0.60845 | -86.09255 | -2707.7 | 34 cores; 128.3 m cored; 8.8 m drilled; 80.5% recovery | ||||||
70-506 | Drilling/drill rig | DRILL | 1979-11-15T00:00:00 | 0.60980 | -86.09980 | -2710 | 7 cores; 27.9 m cored; 8.8 m drilled; 81.5 % recovery | ||||||
70-506A | Drilling/drill rig | DRILL | 1979-11-15T00:00:00 | 0.60980 | -86.09130 | -2710 | OBJECTIVE REACHED | ||||||
70-506B | Drilling/drill rig | DRILL | 1979-11-15T00:00:00 | 0.61020 | -86.09130 | -2711 | 6 cores; 20.7 m cored; 0 m drilled; 97.6 % recovery | ||||||
70-506C | Drilling/drill rig | DRILL | 1979-11-15T00:00:00 | 0.60770 | -86.09130 | -2710 | 8 cores; 31.3 m cored; 0 m drilled; 95 % recovery | ||||||
70-506D | Drilling/drill rig | DRILL | 1979-11-15T00:00:00 | 0.60700 | -86.09130 | -2707 | 9 cores; 31.9 m cored; 0 m drilled; 91.6 % recovery | ||||||
70-506E | Drilling/drill rig | DRILL | 1979-11-15T00:00:00 | 0.60980 | -86.09130 | -2703 | OBJECTIVE REACHED | ||||||
70-506F | Drilling/drill rig | DRILL | 1979-11-15T00:00:00 | 0.61050 | -86.09130 | -2712 | OBJECTIVE REACHED | ||||||
70-507G | Drilling/drill rig | DRILL | 1979-11-20T00:00:00 | 0.56670 | -86.09000 | -2695 | |||||||
70-507_Site | Composite Core | COMPCORE | 1979-11-20T00:00:00 | 0.56670 | -86.09000 | -2696.3 | 33 cores; 155.9 m cored; 0 m drilled; 72.6% recovery | ||||||
70-507I | Drilling/drill rig | DRILL | 1979-11-20T00:00:00 | 0.56670 | -86.09000 | -2692 | OBJECTIVE REACHED | ||||||
70-507 | Drilling/drill rig | DRILL | 1979-11-20T00:00:00 | 0.56670 | -86.09000 | -2701 | 1 cores; 3 m cored; 0 m drilled; 98.3 % recovery | ||||||
70-507A | Drilling/drill rig | DRILL | 1979-11-20T00:00:00 | 0.56670 | -86.09000 | -2691 | OBJECTIVE REACHED | ||||||
70-507B | Drilling/drill rig | DRILL | 1979-11-20T00:00:00 | 0.56670 | -86.09000 | -2691 | 1 cores; 7 m cored; 0 m drilled; 9 % recovery | ||||||
70-507C | Drilling/drill rig | DRILL | 1979-11-20T00:00:00 | 0.56670 | -86.09000 | -2710 | 4 cores; 43 m cored; 0 m drilled; 21.3 % recovery | ||||||
70-507D | Drilling/drill rig | DRILL | 1979-11-20T00:00:00 | 0.56670 | -86.09000 | -2689 | 10 cores; 38.7 m cored; 0 m drilled; 94.3 % recovery | ||||||
70-507E | Drilling/drill rig | DRILL | 1979-11-20T00:00:00 | 0.56670 | -86.09000 | -2689 | |||||||
70-507F | Drilling/drill rig | DRILL | 1979-11-20T00:00:00 | 0.56670 | -86.09000 | -2695 | 9 cores; 31.3 m cored; 0 m drilled; 98.9 % recovery | ||||||
70-507H | Drilling/drill rig | DRILL | 1979-11-20T00:00:00 | 0.56670 | -86.09000 | -2692 | 8 cores; 32.9 m cored; 0 m drilled; 100.2 % recovery | ||||||
70-508 | Drilling/drill rig | DRILL | 1979-11-24T00:00:00 | 0.53330 | -86.10000 | -2783 | 9 cores; 35.3 m cored; 0 m drilled; 98.4 % recovery | ||||||
70-508_Site | Composite Core | COMPCORE | 1979-11-24T00:00:00 | 0.53330 | -86.10000 | -2779 | 14 cores; 65.3 m cored; 0 m drilled; 65.3% recovery | ||||||
70-508E | Drilling/drill rig | DRILL | 1979-11-24T00:00:00 | 0.53330 | -86.10000 | -2777 | OBJECTIVE REACHED | ||||||
70-508D | Drilling/drill rig | DRILL | 1979-11-24T00:00:00 | 0.53330 | -86.10000 | -2777 | MECHANICAL OR EQUIP FAILURE | ||||||
70-508C | Drilling/drill rig | DRILL | 1979-11-24T00:00:00 | 0.53330 | -86.10000 | -2777 | 1 cores; 9.5 m cored; 0 m drilled; 21.9 % recovery | ||||||
70-508B | Drilling/drill rig | DRILL | 1979-11-24T00:00:00 | 0.53330 | -86.10000 | -2777 | 4 cores; 20.5 m cored; 0 m drilled; 28.6 % recovery | ||||||
70-508A | Drilling/drill rig | DRILL | 1979-11-24T00:00:00 | 0.53330 | -86.10000 | -2783 | OBJECTIVE REACHED | ||||||
70-509D | Drilling/drill rig | DRILL | 1979-11-27T00:00:00 | 0.58880 | -86.13150 | -2687 | OBJECTIVE REACHED | ||||||
70-509 | Drilling/drill rig | DRILL | 1979-11-27T00:00:00 | 0.58900 | -86.13150 | -2677 | 9 cores; 32.3 m cored; 0 m drilled; 100.5 % recovery | ||||||
70-509A | Drilling/drill rig | DRILL | 1979-11-27T00:00:00 | 0.58900 | -86.13150 | -2677 | OPERATIONAL LIMIT REACHED | ||||||
70-509B | Drilling/drill rig | DRILL | 1979-11-27T00:00:00 | 0.58880 | -86.13220 | -2687 | 8 cores; 33.8 m cored; 0 m drilled; 96.2 % recovery | ||||||
70-509C | Drilling/drill rig | DRILL | 1979-11-27T00:00:00 | 0.58880 | -86.13150 | -2687 | OBJECTIVE REACHED | ||||||
70-509_Site | Composite Core | COMPCORE | 1979-11-27T00:00:00 | 0.58890 | -86.13185 | -2682 | 17 cores; 66.1 m cored; 0 m drilled; 98.3% recovery | ||||||
70-510_Site | Composite Core | COMPCORE | 1979-11-29T00:00:00 | 1.61320 | -86.41000 | -2781 | 11 cores; 75.5 m cored; 0 m drilled; 83.4% recovery | ||||||
70-510 | Drilling/drill rig | DRILL | 1979-11-29T00:00:00 | 1.61320 | -86.41000 | -2781 | 11 cores; 75.5 m cored; 0 m drilled; 83.4 % recovery | ||||||
70-504B | Drilling/drill rig | DRILL | 1979-12-04T00:00:00 | 1.22700 | -83.73000 | -3460 | 40 cores; 328.6 m cored; 18.5 m drilled; 27.9 % recovery | ||||||
70-504_Site | Composite Core | COMPCORE | 1979-12-04T00:00:00 | 1.22720 | -83.73020 | -3460 | 40 cores; 328.6 m cored; 18.5 m drilled; 27.9% recovery |