Event List of Leg60
Download as tab-delimited text
Event label | Optional label | Method/Device | Abbreviation | Sensor URI | Date/Time | Latitude | Longitude | Elevation | Date/Time end | Latitude end | Longitude end | Elevation end | Comment |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
60-452_Site | Composite Core | COMPCORE | 1978-03-23T00:00:00 | 17.66965 | 148.62900 | -5859 | 9 cores; 86.5 m cored; 0 m drilled; 68.4% recovery | ||||||
60-452A | Drilling/drill rig | DRILL | 1978-03-23T00:00:00 | 17.66950 | 148.62920 | -5860 | 5 cores; 46.5 m cored; 0 m drilled; 46.8 % recovery | ||||||
60-452 | Drilling/drill rig | DRILL | 1978-03-23T00:00:00 | 17.66980 | 148.62880 | -5858 | 4 cores; 40 m cored; 0 m drilled; 93.6 % recovery | ||||||
60-453_Site | Composite Core | COMPCORE | 1978-03-28T00:00:00 | 17.90700 | 143.68250 | -4693 | 63 cores; 595.5 m cored; 9.5 m drilled; 39.5% recovery | ||||||
60-453 | Drilling/drill rig | DRILL | 1978-03-28T00:00:00 | 17.90700 | 143.68250 | -4693 | 63 cores; 595.5 m cored; 9.5 m drilled; 39.5 % recovery | ||||||
60-454 | Drilling/drill rig | DRILL | 1978-04-05T00:00:00 | 18.01300 | 144.53200 | -3816 | 4 cores; 29 m cored; 9.5 m drilled; 77.6 % recovery | ||||||
60-454_Site | Composite Core | COMPCORE | 1978-04-05T00:00:00 | 18.01300 | 144.53200 | -3816 | 20 cores; 171.5 m cored; 19 m drilled; 37% recovery | ||||||
60-454A | Drilling/drill rig | DRILL | 1978-04-05T00:00:00 | 18.01300 | 144.53200 | -3816 | 16 cores; 142.5 m cored; 9.5 m drilled; 28.8 % recovery | ||||||
60-455 | Drilling/drill rig | DRILL | 1978-04-10T00:00:00 | 17.85430 | 145.35800 | -3465 | 11 cores; 104 m cored; 0 m drilled; 30.1 % recovery | ||||||
60-455_Site | Composite Core | COMPCORE | 1978-04-10T00:00:00 | 17.85430 | 145.35800 | -3465 | 11 cores; 104 m cored; 0 m drilled; 30.1% recovery | ||||||
60-456_Site | Composite Core | COMPCORE | 1978-04-12T00:00:00 | 17.91155 | 145.18040 | -3586 | 33 cores; 299 m cored; 9.5 m drilled; 23.4% recovery | ||||||
60-456 | Drilling/drill rig | DRILL | 1978-04-12T00:00:00 | 17.91130 | 145.17950 | -3586 | 18 cores; 159.5 m cored; 9.5 m drilled; 20.3 % recovery | ||||||
60-456A | Drilling/drill rig | DRILL | 1978-04-12T00:00:00 | 17.91180 | 145.18130 | -3586 | 15 cores; 139.5 m cored; 0 m drilled; 26.9 % recovery | ||||||
60-457 | Drilling/drill rig | DRILL | 1978-04-16T00:00:00 | 17.83320 | 145.81700 | -2630 | 4 cores; 37.2 m cored; 4 m drilled; 49.3 % recovery | ||||||
60-457_Site | Composite Core | COMPCORE | 1978-04-16T00:00:00 | 17.83320 | 145.81700 | -2630 | 4 cores; 37.2 m cored; 4 m drilled; 49.3% recovery | ||||||
60-458_Site | Composite Core | COMPCORE | 1978-04-18T00:00:00 | 17.86420 | 146.93430 | -3447 | 46 cores; 437 m cored; 28.5 m drilled; 22.3% recovery | ||||||
60-458 | Drilling/drill rig | DRILL | 1978-04-18T00:00:00 | 17.86420 | 146.93430 | -3447 | 46 cores; 437 m cored; 28.5 m drilled; 22.3 % recovery | ||||||
60-459 | Drilling/drill rig | DRILL | 1978-04-25T00:00:00 | 17.86250 | 147.30150 | -4121 | 2 cores; 15.5 m cored; 0 m drilled; 52.8 % recovery | ||||||
60-459A | Drilling/drill rig | DRILL | 1978-04-25T00:00:00 | 17.86250 | 147.30150 | -4121 | MECHANICAL OR EQUIP FAILURE | ||||||
60-459_Site | Composite Core | COMPCORE | 1978-04-25T00:00:00 | 17.86250 | 147.30150 | -4121 | 70 cores; 659.5 m cored; 28.5 m drilled; 28% recovery | ||||||
60-459B | Drilling/drill rig | DRILL | 1978-04-25T00:00:00 | 17.86250 | 147.30150 | -4121 | 68 cores; 644 m cored; 28.5 m drilled; 27.4 % recovery | ||||||
60-460 | Drilling/drill rig | DRILL | 1978-05-04T00:00:00 | 17.66900 | 147.59870 | -6452 | 10 cores; 84.5 m cored; 9.5 m drilled; 50.7 % recovery | ||||||
60-460A | Drilling/drill rig | DRILL | 1978-05-04T00:00:00 | 17.66700 | 147.58600 | -6445 | 12 cores; 99.6 m cored; 0 m drilled; 37.3 % recovery | ||||||
60-460_Site | Composite Core | COMPCORE | 1978-05-04T00:00:00 | 17.66800 | 147.59235 | -6448.5 | 22 cores; 184.1 m cored; 9.5 m drilled; 43.5% recovery | ||||||
60-461 | Drilling/drill rig | DRILL | 1978-05-09T00:00:00 | 17.76750 | 147.68630 | -7034 | 3 cores; 20.5 m cored; 0 m drilled; 41.8 % recovery | ||||||
60-461_Site | Composite Core | COMPCORE | 1978-05-09T00:00:00 | 17.76725 | 147.68700 | -7034 | 5 cores; 36 m cored; 0 m drilled; 44% recovery | ||||||
60-461A | Drilling/drill rig | DRILL | 1978-05-09T00:00:00 | 17.76700 | 147.68770 | -7034 | 2 cores; 15.5 m cored; 0 m drilled; 46.8 % recovery |