Event List of Leg6
Download as tab-delimited text
Event label | Optional label | Method/Device | Abbreviation | O2A Registry URI | Date/Time | Latitude | Longitude | Elevation | Date/Time end | Latitude end | Longitude end | Elevation end | Comment |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
6-44_Site | Composite Core | COMPCORE | 1969-06-13T00:00:00 | 19.30830 | -169.01500 | -1478 | 5 cores; 32.4 m cored; 0 m drilled; 89.5% recovery | ||||||
6-44 | Drilling/drill rig | DRILL | 1969-06-13T00:00:00 | 19.30830 | -169.01500 | -1478 | 5 cores; 32.4 m cored; 0 m drilled; 89.5 % recovery | ||||||
6-45A | Drilling/drill rig | DRILL | 1969-06-17T00:00:00 | 24.26500 | -178.50830 | -5508 | 3 cores; 26.5 m cored; 9.1 m drilled; 21.9 % recovery | ||||||
6-45_Site | Composite Core | COMPCORE | 1969-06-17T00:00:00 | 24.26500 | -178.50830 | -5508 | 3 cores; 26.5 m cored; 9.1 m drilled; 21.9% recovery | ||||||
6-45 | Drilling/drill rig | DRILL | 1969-06-17T00:00:00 | 24.26500 | -178.50830 | -5508 | MECHANICAL OR EQUIP FAILURE | ||||||
6-46 | Drilling/drill rig | DRILL | 1969-06-24T00:00:00 | 27.88330 | 171.43830 | -5769 | 1 cores; 9.1 m cored; 0 m drilled; 98.9 % recovery | ||||||
6-46_Site | Composite Core | COMPCORE | 1969-06-24T00:00:00 | 27.88330 | 171.43830 | -5769 | 1 cores; 9.1 m cored; 0 m drilled; 98.9% recovery | ||||||
6-47A | Drilling/drill rig | DRILL | 1969-06-28T00:00:00 | 32.44830 | 157.71170 | -2689 | 1 cores; 9.2 m cored; 1.2 m drilled; 26.1 % recovery | ||||||
6-47B | Drilling/drill rig | DRILL | 1969-06-28T00:00:00 | 32.44830 | 157.71170 | -2689 | 14 cores; 120.1 m cored; 0 m drilled; 84.2 % recovery | ||||||
6-47 | Drilling/drill rig | DRILL | 1969-06-28T00:00:00 | 32.44830 | 157.71170 | -2689 | 1 cores; 9.1 m cored; 0 m drilled; 100 % recovery | ||||||
6-47_Site | Composite Core | COMPCORE | 1969-06-28T00:00:00 | 32.44830 | 157.71170 | -2689 | 16 cores; 138.4 m cored; 1.2 m drilled; 81.3% recovery | ||||||
6-48A | Drilling/drill rig | DRILL | 1969-06-30T00:00:00 | 32.40830 | 158.02170 | -2619 | 1 cores; 0.6 m cored; 0 m drilled; 100 % recovery | ||||||
6-48B | Drilling/drill rig | DRILL | 1969-06-30T00:00:00 | 32.40830 | 158.02170 | -2619 | 3 cores; 21 m cored; 0 m drilled; 98.6 % recovery | ||||||
6-48 | Drilling/drill rig | DRILL | 1969-06-30T00:00:00 | 32.40830 | 158.02170 | -2619 | OPERATIONAL LIMIT REACHED | ||||||
6-48_Site | Composite Core | COMPCORE | 1969-06-30T00:00:00 | 32.40830 | 158.02170 | -2619 | 4 cores; 21.6 m cored; 0 m drilled; 98.6% recovery | ||||||
6-49 | Drilling/drill rig | DRILL | 1969-07-02T00:00:00 | 32.40170 | 156.60000 | -4282 | 2 cores; 9.7 m cored; 0 m drilled; 100 % recovery | ||||||
6-49_Site | Composite Core | COMPCORE | 1969-07-02T00:00:00 | 32.40170 | 156.60000 | -4282 | 4 cores; 24.3 m cored; 0 m drilled; 81.1% recovery | ||||||
6-49A | Drilling/drill rig | DRILL | 1969-07-02T00:00:00 | 32.40170 | 156.60000 | -4282 | 2 cores; 14.6 m cored; 0 m drilled; 68.5 % recovery | ||||||
6-50A | Drilling/drill rig | DRILL | 1969-07-03T00:00:00 | 32.40330 | 156.57170 | -4487 | 4 cores; 30.8 m cored; 0 m drilled; 83.4 % recovery | ||||||
6-50_Site | Composite Core | COMPCORE | 1969-07-03T00:00:00 | 32.40330 | 156.57170 | -4487 | 6 cores; 37.5 m cored; 0 m drilled; 103.2% recovery | ||||||
6-50 | Drilling/drill rig | DRILL | 1969-07-03T00:00:00 | 32.40330 | 156.57170 | -4487 | 2 cores; 6.7 m cored; 0 m drilled; 194 % recovery | ||||||
6-51 | Drilling/drill rig | DRILL | 1969-07-04T00:00:00 | 33.47500 | 153.40500 | -5981 | 2 cores; 17.4 m cored; 0 m drilled; 53.4 % recovery | ||||||
6-51A | Drilling/drill rig | DRILL | 1969-07-04T00:00:00 | 33.47500 | 153.40500 | -5981 | 2 cores; 15.2 m cored; 0 m drilled; 71.1 % recovery | ||||||
6-51_Site | Composite Core | COMPCORE | 1969-07-04T00:00:00 | 33.47500 | 153.40500 | -5981 | 4 cores; 32.6 m cored; 0 m drilled; 61.7% recovery | ||||||
6-52_Site | Composite Core | COMPCORE | 1969-07-09T00:00:00 | 27.77170 | 147.13000 | -5744 | 10 cores; 68.9 m cored; 0 m drilled; 65.2% recovery | ||||||
6-52 | Drilling/drill rig | DRILL | 1969-07-09T00:00:00 | 27.77170 | 147.13000 | -5744 | 10 cores; 68.9 m cored; 0 m drilled; 65.2 % recovery | ||||||
6-53 | Drilling/drill rig | DRILL | 1969-07-13T00:00:00 | 18.03330 | 141.19170 | -4629 | 9 cores; 53.9 m cored; 0 m drilled; 22.6 % recovery | ||||||
6-53B | Drilling/drill rig | DRILL | 1969-07-13T00:00:00 | 18.03330 | 141.19170 | -4629 | 1 cores; 9.1 m cored; 0 m drilled; 98.9 % recovery | ||||||
6-53_Site | Composite Core | COMPCORE | 1969-07-13T00:00:00 | 18.03330 | 141.19170 | -4629 | 13 cores; 90.5 m cored; 0 m drilled; 51.4% recovery | ||||||
6-53A | Drilling/drill rig | DRILL | 1969-07-13T00:00:00 | 18.03330 | 141.19170 | -4629 | 3 cores; 27.5 m cored; 0 m drilled; 92.1 % recovery | ||||||
6-54 | Drilling/drill rig | DRILL | 1969-07-17T00:00:00 | 15.61000 | 140.30170 | -4990 | 9 cores; 65.5 m cored; 0 m drilled; 41.4 % recovery | ||||||
6-54_Site | Composite Core | COMPCORE | 1969-07-17T00:00:00 | 15.61000 | 140.30170 | -4990 | 9 cores; 65.5 m cored; 0 m drilled; 41.4% recovery | ||||||
6-55 | Drilling/drill rig | DRILL | 1969-07-21T00:00:00 | 9.30170 | 142.53500 | -2850 | 14 cores; 128.1 m cored; 0 m drilled; 93 % recovery | ||||||
6-55_Site | Composite Core | COMPCORE | 1969-07-21T00:00:00 | 9.30170 | 142.53500 | -2850 | 14 cores; 128.1 m cored; 0 m drilled; 93% recovery | ||||||
6-56B | Drilling/drill rig | DRILL | 1969-07-23T00:00:00 | 8.37330 | 143.56000 | -2508 | 10 cores; 119.7 m cored; 0 m drilled; 68.1 % recovery | ||||||
6-56A | Drilling/drill rig | DRILL | 1969-07-23T00:00:00 | 8.37330 | 143.56000 | -2508 | MECHANICAL OR EQUIP FAILURE | ||||||
6-56 | Drilling/drill rig | DRILL | 1969-07-23T00:00:00 | 8.37330 | 143.56000 | -2508 | MECHANICAL OR EQUIP FAILURE | ||||||
6-56_Site | Composite Core | COMPCORE | 1969-07-23T00:00:00 | 8.37330 | 143.56000 | -2508 | 10 cores; 119.7 m cored; 0 m drilled; 68.1% recovery | ||||||
6-57_Site | Composite Core | COMPCORE | 1969-07-25T00:00:00 | 8.68170 | 143.53330 | -3300 | 10 cores; 376 m cored; 0 m drilled; 10.1% recovery | ||||||
6-57B | Drilling/drill rig | DRILL | 1969-07-25T00:00:00 | 8.68170 | 143.53330 | -3300 | 1 cores; 9.2 m cored; 0 m drilled; 97.8 % recovery | ||||||
6-57A | Drilling/drill rig | DRILL | 1969-07-25T00:00:00 | 8.68170 | 143.53330 | -3300 | 4 cores; 31.4 m cored; 0 m drilled; 72 % recovery | ||||||
6-57 | Drilling/drill rig | DRILL | 1969-07-25T00:00:00 | 8.68170 | 143.53330 | -3300 | 5 cores; 335.4 m cored; 0 m drilled; 1.9 % recovery | ||||||
6-58B | Drilling/drill rig | DRILL | 1969-07-28T00:00:00 | 9.23500 | 144.41830 | -4486 | 1 cores; 6.7 m cored; 0 m drilled; 134.3 % recovery | ||||||
6-58 | Drilling/drill rig | DRILL | 1969-07-28T00:00:00 | 9.23500 | 144.41830 | -4503 | 1 cores; 0.1 m cored; 0 m drilled; 210 % recovery | ||||||
6-58A | Drilling/drill rig | DRILL | 1969-07-28T00:00:00 | 9.23500 | 144.41830 | -4503 | 1 cores; 9.1 m cored; 1.2 m drilled; 49.5 % recovery | ||||||
6-58_Site | Composite Core | COMPCORE | 1969-07-28T00:00:00 | 9.23500 | 144.41830 | -4497.3 | 3 cores; 15.9 m cored; 1.2 m drilled; 86.2% recovery | ||||||
6-59 | Drilling/drill rig | DRILL | 1969-07-31T00:00:00 | 11.78000 | 147.58170 | -5554 | 0 cores; 0 m cored; 0.6 m drilled; % recovery | ||||||
6-59B | Drilling/drill rig | DRILL | 1969-07-31T00:00:00 | 11.78000 | 147.58170 | -5547 | 6 cores; 46 m cored; 0 m drilled; 39.6 % recovery | ||||||
6-59A | Drilling/drill rig | DRILL | 1969-07-31T00:00:00 | 11.78000 | 147.58170 | -5554 | 1 cores; 9.2 m cored; 18.3 m drilled; 32.6 % recovery | ||||||
6-59_Site | Composite Core | COMPCORE | 1969-07-31T00:00:00 | 11.78000 | 147.58170 | -5551.7 | 7 cores; 55.2 m cored; 18.9 m drilled; 38.4% recovery | ||||||
6-60_Site | Composite Core | COMPCORE | 1969-08-03T00:00:00 | 13.66670 | 145.69830 | -3717 | 9 cores; 63 m cored; 0 m drilled; 53.2% recovery | ||||||
6-60 | Drilling/drill rig | DRILL | 1969-08-03T00:00:00 | 13.66670 | 145.69830 | -3717 | 9 cores; 63 m cored; 0 m drilled; 53.2 % recovery |