Event List of Leg44
Download as tab-delimited text
Event label | Optional label | Method/Device | Abbreviation | O2A Registry URI | Date/Time | Latitude | Longitude | Elevation | Date/Time end | Latitude end | Longitude end | Elevation end | Comment |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
44-388 | Drilling/drill rig | DRILL | 1975-08-17T00:00:00 | 35.52220 | -69.39600 | -4919 | MECHANICAL OR EQUIP FAILURE | ||||||
44-388A | Drilling/drill rig | DRILL | 1975-08-17T00:00:00 | 35.52220 | -69.39600 | -4919 | 11 cores; 98.5 m cored; 0 m drilled; 43.1 % recovery | ||||||
44-388_Site | Composite Core | COMPCORE | 1975-08-17T00:00:00 | 35.52220 | -69.39600 | -4919 | 11 cores; 98.5 m cored; 0 m drilled; 43.1% recovery | ||||||
44-389 | Drilling/drill rig | DRILL | 1975-08-28T00:00:00 | 30.14230 | -76.09280 | -2714 | 1 cores; 9.5 m cored; 0 m drilled; 36.8 % recovery | ||||||
44-389_Site | Composite Core | COMPCORE | 1975-08-28T00:00:00 | 30.14230 | -76.09280 | -2714 | 1 cores; 9.5 m cored; 0 m drilled; 36.8% recovery | ||||||
44-390 | Drilling/drill rig | DRILL | 1975-08-29T00:00:00 | 30.14230 | -76.11230 | -2665 | 9 cores; 82.5 m cored; 9.5 m drilled; 32.9 % recovery | ||||||
44-390A | Drilling/drill rig | DRILL | 1975-08-29T00:00:00 | 30.14230 | -76.11230 | -2665 | 14 cores; 133 m cored; 0 m drilled; 64.9 % recovery | ||||||
44-390_Site | Composite Core | COMPCORE | 1975-08-29T00:00:00 | 30.14230 | -76.11230 | -2665 | 23 cores; 215.5 m cored; 9.5 m drilled; 52.7% recovery | ||||||
44-391_Site | Composite Core | COMPCORE | 1975-09-02T00:00:00 | 28.22730 | -75.61570 | -4974 | 73 cores; 678 m cored; 22 m drilled; 50.7% recovery | ||||||
44-391C | Drilling/drill rig | DRILL | 1975-09-02T00:00:00 | 28.22680 | -75.61670 | -4974 | 50 cores; 469.5 m cored; 22 m drilled; 45.5 % recovery | ||||||
44-391B | Drilling/drill rig | DRILL | 1975-09-02T00:00:00 | 28.22680 | -75.61670 | -4974 | 1 cores; 9.5 m cored; 0 m drilled; 96.3 % recovery | ||||||
44-391A | Drilling/drill rig | DRILL | 1975-09-02T00:00:00 | 28.22680 | -75.61670 | -4974 | 21 cores; 194.5 m cored; 0 m drilled; 60.9 % recovery | ||||||
44-391 | Drilling/drill rig | DRILL | 1975-09-02T00:00:00 | 28.22880 | -75.61270 | -4974 | 1 cores; 4.5 m cored; 0 m drilled; 51.1 % recovery | ||||||
44-392A | Drilling/drill rig | DRILL | 1975-09-23T00:00:00 | 29.91050 | -76.17800 | -2601 | 31 cores; 269.3 m cored; 13.5 m drilled; 9.6 % recovery | ||||||
44-392 | Drilling/drill rig | DRILL | 1975-09-23T00:00:00 | 29.91050 | -76.17800 | -2601 | 2 cores; 11.5 m cored; 0 m drilled; 27.8 % recovery | ||||||
44-392_Site | Composite Core | COMPCORE | 1975-09-23T00:00:00 | 29.91050 | -76.17800 | -2601 | 33 cores; 280.8 m cored; 13.5 m drilled; 10.3% recovery | ||||||
44-393 | Drilling/drill rig | DRILL | 1975-11-11T00:00:00 | 28.19670 | -75.59900 | -4951 | 1 cores; 8 m cored; 0 m drilled; 55 % recovery | ||||||
44-393_Site | Composite Core | COMPCORE | 1975-11-11T00:00:00 | 28.19670 | -75.59900 | -4951 | 2 cores; 66.5 m cored; 0 m drilled; 20.9% recovery | ||||||
44-393A | Drilling/drill rig | DRILL | 1975-11-11T00:00:00 | 28.19670 | -75.59900 | -4951 | 1 cores; 58.5 m cored; 0 m drilled; 16.2 % recovery | ||||||
44-394A | Drilling/drill rig | DRILL | 1975-11-21T00:00:00 | 28.19500 | -75.59600 | -4957 | 5 cores; 47.5 m cored; 0 m drilled; 30.4 % recovery | ||||||
44-394 | Drilling/drill rig | DRILL | 1975-11-21T00:00:00 | 28.19500 | -75.59600 | -4957 | OBJECTIVE REACHED | ||||||
44-394_Site | Composite Core | COMPCORE | 1975-11-21T00:00:00 | 28.19500 | -75.59600 | -4957 | 5 cores; 47.5 m cored; 0 m drilled; 30.4% recovery |