Event List of Leg21
Download as tab-delimited text
Event label | Optional label | Method/Device | Abbreviation | O2A Registry URI | Date/Time | Latitude | Longitude | Elevation | Date/Time end | Latitude end | Longitude end | Elevation end | Comment |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
21-203_Site | Composite Core | COMPCORE | 1971-11-17T00:00:00 | -22.15370 | -177.54620 | -2720 | 5 cores; 33.1 m cored; 0 m drilled; 54.4% recovery | ||||||
21-203 | Drilling/drill rig | DRILL | 1971-11-17T00:00:00 | -22.15370 | -177.54620 | -2720 | 5 cores; 33.1 m cored; 0 m drilled; 54.4 % recovery | ||||||
21-204 | Drilling/drill rig | DRILL | 1971-11-20T00:00:00 | -24.95450 | -174.11150 | -5354 | 9 cores; 79 m cored; 0 m drilled; 62.5 % recovery | ||||||
21-204_Site | Composite Core | COMPCORE | 1971-11-20T00:00:00 | -24.95450 | -174.11150 | -5354 | 10 cores; 88 m cored; 0 m drilled; 61% recovery | ||||||
21-204A | Drilling/drill rig | DRILL | 1971-11-20T00:00:00 | -24.95450 | -174.11150 | -5354 | 1 cores; 9 m cored; 0 m drilled; 47.8 % recovery | ||||||
21-205 | Drilling/drill rig | DRILL | 1971-11-24T00:00:00 | -25.51650 | 177.89920 | -4320 | 24 cores; 216 m cored; 72 m drilled; 62 % recovery | ||||||
21-205_Site | Composite Core | COMPCORE | 1971-11-24T00:00:00 | -25.51650 | 177.89920 | -4320 | 24 cores; 216 m cored; 72 m drilled; 62% recovery | ||||||
21-206_Site | Composite Core | COMPCORE | 1971-11-30T00:00:00 | -32.01250 | 165.45250 | -3196 | 63 cores; 562 m cored; 18 m drilled; 57.8% recovery | ||||||
21-206 | Drilling/drill rig | DRILL | 1971-11-30T00:00:00 | -32.01250 | 165.45250 | -3196 | 45 cores; 400 m cored; 0 m drilled; 60.9 % recovery | ||||||
21-206A | Drilling/drill rig | DRILL | 1971-11-30T00:00:00 | -32.01250 | 165.45250 | -3196 | MECHANICAL OR EQUIP FAILURE | ||||||
21-206B | Drilling/drill rig | DRILL | 1971-11-30T00:00:00 | -32.01250 | 165.45250 | -3196 | MECHANICAL OR EQUIP FAILURE | ||||||
21-206C | Drilling/drill rig | DRILL | 1971-11-30T00:00:00 | -32.01250 | 165.45250 | -3196 | 18 cores; 162 m cored; 18 m drilled; 50.1 % recovery | ||||||
21-207A | Drilling/drill rig | DRILL | 1971-12-12T00:00:00 | -36.96250 | 165.43430 | -1389 | 45 cores; 405 m cored; 45 m drilled; 52.4 % recovery | ||||||
21-207 | Drilling/drill rig | DRILL | 1971-12-12T00:00:00 | -36.96250 | 165.43430 | -1389 | 5 cores; 42 m cored; 0 m drilled; 90.5 % recovery | ||||||
21-207_Site | Composite Core | COMPCORE | 1971-12-12T00:00:00 | -36.96250 | 165.43430 | -1389 | 50 cores; 447 m cored; 45 m drilled; 56% recovery | ||||||
21-208 | Drilling/drill rig | DRILL | 1971-12-23T00:00:00 | -26.11020 | 161.22120 | -1545 | 33 cores; 297 m cored; 9 m drilled; 85.9 % recovery | ||||||
21-208_Site | Composite Core | COMPCORE | 1971-12-23T00:00:00 | -26.11020 | 161.22120 | -1545 | 33 cores; 297 m cored; 9 m drilled; 85.9% recovery | ||||||
21-209 | Drilling/drill rig | DRILL | 1971-12-28T00:00:00 | -15.93650 | 152.18780 | -1428 | 23 cores; 207 m cored; 85 m drilled; 37.2 % recovery | ||||||
21-209A | Drilling/drill rig | DRILL | 1971-12-28T00:00:00 | -15.93650 | 152.18780 | -1428 | 1 cores; 9 m cored; 0 m drilled; 24.4 % recovery | ||||||
21-209_Site | Composite Core | COMPCORE | 1971-12-28T00:00:00 | -15.93650 | 152.18780 | -1428 | 24 cores; 216 m cored; 85 m drilled; 36.7% recovery | ||||||
21-210_Site | Composite Core | COMPCORE | 1971-12-30T00:00:00 | -13.76650 | 152.89630 | -4643 | 48 cores; 432 m cored; 18 m drilled; 60.6% recovery | ||||||
21-210 | Drilling/drill rig | DRILL | 1971-12-30T00:00:00 | -13.76650 | 152.89630 | -4643 | 48 cores; 432 m cored; 18 m drilled; 60.6 % recovery |