Event List of Leg204
Download as tab-delimited text
Event label | Optional label | Method/Device | Abbreviation | Sensor URI | Date/Time | Latitude | Longitude | Elevation | Date/Time end | Latitude end | Longitude end | Elevation end | Comment |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
204-1244 | Composite Core | COMPCORE | 2002-07-12T00:00:00 | 44.58623 | -125.11975 | -895.4 | 2002-08-22T00:00:00 | 69 cores; 555.5 m cored; 495.7 m drilled; 98.1 % recovery | |||||
204-1244A | Drilling/drill rig | DRILL | 2002-07-12T14:15:00 | 44.58616 | -125.11985 | -896.7 | 2002-07-13T01:00:00 | 1 core; 9.5 m cored; 0 m drilled; 105.2 % recovery | |||||
204-1244B | Drilling/drill rig | DRILL | 2002-07-13T01:00:00 | 44.58616 | -125.11986 | -896 | 2002-07-13T12:45:00 | 6 cores; 54.1 m cored; 0 m drilled; 105.1 % recovery | |||||
204-1244C | Drilling/drill rig | DRILL | 2002-07-13T12:45:00 | 44.58630 | -125.11983 | -895.1 | 2002-07-16T05:30:00 | 39 cores; 332 m cored; 1.5 m drilled; 95 % recovery | |||||
204-1244D | Drilling/drill rig | DRILL | 2002-07-16T05:30:00 | 44.58643 | -125.11983 | -895.1 | 2002-07-17T19:00:00 | 0 cores; 0 m cored; 380 m drilled | |||||
204-1245 | Composite Core | COMPCORE | 2002-07-17T00:00:00 | 44.58613 | -125.14905 | -870.7 | 2002-08-16T00:00:00 | 93 cores; 761 m cored; 858.7 m drilled; 85 % recovery | |||||
204-1245A | Drilling/drill rig | DRILL | 2002-07-17T19:00:00 | 44.58616 | -125.14910 | -875.6 | 2002-07-18T23:45:00 | 0 cores; 0 m cored; 380 m drilled | |||||
204-1246 | Composite Core | COMPCORE | 2002-07-18T00:00:00 | 44.58607 | -125.13553 | -850 | 2002-08-11T00:00:00 | 16 cores; 136.7 m cored; 180 m drilled; 99 % recovery | |||||
204-1246A | Drilling/drill rig | DRILL | 2002-07-18T23:45:00 | 44.58606 | -125.13566 | -850.6 | 2002-07-19T18:00:00 | 0 cores; 0 m cored; 180 m drilled | |||||
204-1247 | Composite Core | COMPCORE | 2002-07-19T00:00:00 | 44.57765 | -125.15072 | -834.2 | 2002-08-24T00:00:00 | 27 cores; 217 m cored; 273 m drilled; 97.7 % recovery | |||||
204-1247A | Drilling/drill rig | DRILL | 2002-07-19T18:00:00 | 44.57765 | -125.15016 | -834.1 | 2002-07-20T15:15:00 | 0 cores; 0 m cored; 270 m drilled | |||||
204-1248 | Composite Core | COMPCORE | 2002-07-20T00:00:00 | 44.57423 | -125.15252 | -830.4 | 2002-08-02T00:00:00 | 20 cores; 166 m cored; 194 m drilled; 65.6 % recovery | |||||
204-1248A | Drilling/drill rig | DRILL | 2002-07-20T15:15:00 | 44.57420 | -125.15258 | -832 | 2002-07-21T07:00:00 | 0 cores; 0 m cored; 194 m drilled | |||||
204-1250 | Composite Core | COMPCORE | 2002-07-21T00:00:00 | 44.56860 | -125.15018 | -795.8 | 2002-08-27T00:00:00 | 53 cores; 378 m cored; 498 m drilled; 87.8 % recovery | |||||
204-1249 | Composite Core | COMPCORE | 2002-07-21T00:00:00 | 44.57032 | -125.14733 | -777.2 | 2002-08-29T00:00:00 | 72 cores; 484.8 m cored; 104 m drilled; 46.3 % recovery | |||||
204-1249A | Drilling/drill rig | DRILL | 2002-07-21T07:00:00 | 44.57041 | -125.14736 | -777.5 | 2002-07-21T16:30:00 | 0 cores; 0 m cored; 90 m drilled | |||||
204-1250A | Drilling/drill rig | DRILL | 2002-07-21T16:30:00 | 44.56863 | -125.15030 | -796 | 2002-07-22T12:45:00 | 0 cores; 0 m cored; 210 m drilled | |||||
204-1251 | Composite Core | COMPCORE | 2002-07-22T00:00:00 | 44.57022 | -125.07400 | -1210.7 | 2002-08-18T00:00:00 | 89 cores; 715.7 m cored; 842.5 m drilled; 84.9 % recovery | |||||
204-1251A | Drilling/drill rig | DRILL | 2002-07-22T12:45:00 | 44.57033 | -125.07420 | -1216.9 | 2002-07-23T14:00:00 | 0 cores; 0 m cored; 380 m drilled | |||||
204-1250B | Drilling/drill rig | DRILL | 2002-07-23T14:00:00 | 44.56861 | -125.14986 | -795.9 | 2002-07-24T09:30:00 | 0 cores; 0 m cored; 180 m drilled | |||||
204-1249B | Drilling/drill rig | DRILL | 2002-07-24T09:30:00 | 44.57018 | -125.14735 | -778.4 | 2002-07-25T13:30:00 | 8 cores; 45 m cored; 0 m drilled; 31.1 % recovery | |||||
204-1249C | Drilling/drill rig | DRILL | 2002-07-25T13:30:00 | 44.57061 | -125.14735 | -778.4 | 2002-07-26T11:45:00 | 14 cores; 88.5 m cored; 1.5 m drilled; 66.6 % recovery | |||||
204-1251B | Drilling/drill rig | DRILL | 2002-07-26T11:45:00 | 44.57031 | -125.07396 | -1213.3 | 2002-07-30T02:00:00 | 53 cores; 442.1 m cored; 3 m drilled; 83.4 % recovery | |||||
204-1251C | Drilling/drill rig | DRILL | 2002-07-30T02:00:00 | 44.57010 | -125.07395 | -1210.2 | 2002-07-30T06:30:00 | 2 cores; 17.6 m cored; 0 m drilled; 77.4 % recovery | |||||
204-1251D | Drilling/drill rig | DRILL | 2002-07-30T06:30:00 | 44.57010 | -125.07395 | -1210.2 | 2002-07-31T20:45:00 | 30 cores; 226.5 m cored; 4 m drilled; 85.8 % recovery | |||||
204-1251E | Drilling/drill rig | DRILL | 2002-07-31T20:45:00 | 44.57021 | -125.07393 | -1208.8 | 2002-07-31T22:30:00 | 1 core; 9.5 m cored; 0 m drilled; 104.1 % recovery | |||||
204-1251F | Drilling/drill rig | DRILL | 2002-07-31T22:30:00 | 44.57026 | -125.07395 | -1208.8 | 2002-07-31T22:45:00 | 1 core; 9.5 m cored; 0 m drilled; 104.4 % recovery | |||||
204-1251G | Drilling/drill rig | DRILL | 2002-07-31T22:45:00 | 44.57023 | -125.07393 | -1208.8 | 2002-08-01T03:00:00 | 2 cores; 10.5 m cored; 10.5 m drilled; 105.8 % recovery | |||||
204-1248B | Drilling/drill rig | DRILL | 2002-08-01T03:00:00 | 44.57428 | -125.15246 | -829.6 | 2002-08-01T13:45:00 | 3 cores; 17 m cored; 0 m drilled; 43.8 % recovery | |||||
204-1248C | Drilling/drill rig | DRILL | 2002-08-01T13:45:00 | 44.57423 | -125.15250 | -829.6 | 2002-08-02T12:30:00 | 17 cores; 149 m cored; 0 m drilled; 68.1 % recovery | |||||
204-1250C | Drilling/drill rig | DRILL | 2002-08-02T12:30:00 | 44.56878 | -125.15030 | -795.8 | 2002-08-03T17:00:00 | 19 cores; 143 m cored; 2 m drilled; 82 % recovery | |||||
204-1250D | Drilling/drill rig | DRILL | 2002-08-03T17:00:00 | 44.56843 | -125.15030 | -795.7 | 2002-08-04T19:00:00 | 19 cores; 142 m cored; 3 m drilled; 94.1 % recovery | |||||
204-1250E | Drilling/drill rig | DRILL | 2002-08-04T19:00:00 | 44.56853 | -125.15028 | -795.7 | 2002-08-04T22:30:00 | 2 cores; 16 m cored; 0 m drilled; 74.6 % recovery | |||||
204-1249D | Drilling/drill rig | DRILL | 2002-08-04T22:30:00 | 44.57036 | -125.14728 | -777.2 | 2002-08-05T03:45:00 | 3 cores; 16.5 m cored; 2 m drilled; 29 % recovery | |||||
204-1249E | Drilling/drill rig | DRILL | 2002-08-05T03:45:00 | 44.57045 | -125.14728 | -777.2 | 2002-08-05T08:30:00 | 3 cores; 9 m cored; 2 m drilled; 37.6 % recovery | |||||
204-1249F | Drilling/drill rig | DRILL | 2002-08-05T08:30:00 | 44.57053 | -125.14730 | -777.2 | 2002-08-06T07:15:00 | 16 cores; 82.5 m cored; 7.5 m drilled; 69.5 % recovery | |||||
204-1245B | Drilling/drill rig | DRILL | 2002-08-06T07:15:00 | 44.58598 | -125.14910 | -869.7 | 2002-08-09T15:45:00 | 53 cores; 471.7 m cored; 2 m drilled; 88.6 % recovery | |||||
204-1245C | Drilling/drill rig | DRILL | 2002-08-09T15:45:00 | 44.58616 | -125.14885 | -868.6 | 2002-08-11T00:30:00 | 29 cores; 198.7 m cored; 3 m drilled; 93.3 % recovery | |||||
204-1245D | Drilling/drill rig | DRILL | 2002-08-11T00:30:00 | 44.58615 | -125.14885 | -870.1 | 2002-08-11T04:00:00 | 3 cores; 24 m cored; 0 m drilled; 103.4 % recovery | |||||
204-1245E | Drilling/drill rig | DRILL | 2002-08-11T04:00:00 | 44.58616 | -125.14935 | -869.5 | 2002-08-16T07:15:00 | 8 cores; 66.6 m cored; 473.7 m drilled; 27.7 % recovery | |||||
204-1246B | Drilling/drill rig | DRILL | 2002-08-11T04:00:00 | 44.58606 | -125.13538 | -849.4 | 2002-08-11T22:45:00 | 16 cores; 136.7 m cored; 0 m drilled; 99 % recovery | |||||
204-1251H | Drilling/drill rig | DRILL | 2002-08-16T07:15:00 | 44.57015 | -125.07418 | -1208.5 | 2002-08-18T23:00:00 | 0 cores; 0 m cored; 445 m drilled | |||||
204-1244E | Drilling/drill rig | DRILL | 2002-08-18T23:00:00 | 44.58618 | -125.11953 | -893.3 | 2002-08-22T01:45:00 | 19 cores; 135.8 m cored; 114.2 m drilled; 101.4 % recovery | |||||
204-1244F | Drilling/drill rig | DRILL | 2002-08-22T01:45:00 | 44.58615 | -125.11950 | -896.3 | 2002-08-22T06:45:00 | 4 cores; 24.1 m cored; 0 m drilled; 103.3 % recovery | |||||
204-1247B | Drilling/drill rig | DRILL | 2002-08-22T06:45:00 | 44.57765 | -125.15128 | -834.3 | 2002-08-24T19:15:00 | 27 cores; 217 m cored; 3 m drilled; 97.7 % recovery | |||||
204-1250F | Drilling/drill rig | DRILL | 2002-08-24T19:15:00 | 44.56861 | -125.15003 | -795.4 | 2002-08-27T21:30:00 | 13 cores; 77 m cored; 103 m drilled; 89.7 % recovery | |||||
204-1249G | Drilling/drill rig | DRILL | 2002-08-27T21:30:00 | 44.57011 | -125.14736 | -776.8 | 2002-08-28T06:30:00 | 5 cores; 43 m cored; 0 m drilled; 26.1 % recovery | |||||
204-1249H | Drilling/drill rig | DRILL | 2002-08-28T06:30:00 | 44.57018 | -125.14728 | -776.8 | 2002-08-28T15:00:00 | 6 cores; 52.5 m cored; 0 m drilled; 52.4 % recovery | |||||
204-1249I | Drilling/drill rig | DRILL | 2002-08-28T15:00:00 | 44.57018 | -125.14740 | -776.8 | 2002-08-28T21:00:00 | 4 cores; 33.6 m cored; 0 m drilled; 25.9 % recovery | |||||
204-1249J | Drilling/drill rig | DRILL | 2002-08-28T21:00:00 | 44.57018 | -125.14736 | -776.8 | 2002-08-29T02:30:00 | 3 cores; 32.5 m cored; 0 m drilled; 23.7 % recovery | |||||
204-1252 | Composite Core | COMPCORE | 2002-08-29T00:00:00 | 44.58612 | -125.09282 | -1039.2 | 2002-09-01T00:00:00 | 28 cores; 259.8 m cored; 0 m drilled; 97.6 % recovery | |||||
204-1249K | Drilling/drill rig | DRILL | 2002-08-29T02:30:00 | 44.57023 | -125.14731 | -776.8 | 2002-08-29T10:45:00 | 5 cores; 43.2 m cored; 1 m drilled; 39.1 % recovery | |||||
204-1249L | Drilling/drill rig | DRILL | 2002-08-29T10:45:00 | 44.57020 | -125.14740 | -776.8 | 2002-08-29T21:05:00 | 5 cores; 38.5 m cored; 0 m drilled; 36.8 % recovery | |||||
204-1252A | Drilling/drill rig | DRILL | 2002-08-29T21:00:00 | 44.58611 | -125.09281 | -1039.2 | 2002-09-01T00:00:00 | 28 cores; 259.8 m cored; 0 m drilled; 97.6 % recovery |