Event List of Leg20
Download as tab-delimited text
Event label | Optional label | Method/Device | Abbreviation | O2A Registry URI | Date/Time | Latitude | Longitude | Elevation | Date/Time end | Latitude end | Longitude end | Elevation end | Comment |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
20-194 | Drilling/drill rig | DRILL | 1971-09-19T00:00:00 | 33.97800 | 148.81070 | -5754 | 2 cores; 19 m cored; 20.5 m drilled; 78.9 % recovery | ||||||
20-194_Site | Composite Core | COMPCORE | 1971-09-19T00:00:00 | 33.97800 | 148.81070 | -5754 | 2 cores; 19 m cored; 20.5 m drilled; 78.9% recovery | ||||||
20-195 | Drilling/drill rig | DRILL | 1971-09-22T00:00:00 | 32.77330 | 146.97880 | -5968 | 4 cores; 31.5 m cored; 0 m drilled; 44.4 % recovery | ||||||
20-195A | Drilling/drill rig | DRILL | 1971-09-22T00:00:00 | 32.77330 | 146.97880 | -5968 | OPERATIONAL LIMIT REACHED | ||||||
20-195B | Drilling/drill rig | DRILL | 1971-09-22T00:00:00 | 32.77330 | 146.97880 | -5968 | 1 cores; 3 m cored; 13.5 m drilled; 50 % recovery | ||||||
20-195_Site | Composite Core | COMPCORE | 1971-09-22T00:00:00 | 32.77330 | 146.97880 | -5968 | 5 cores; 34.5 m cored; 13.5 m drilled; 44.9% recovery | ||||||
20-196_Site | Composite Core | COMPCORE | 1971-09-29T00:00:00 | 30.11620 | 148.57480 | -6194 | 5 cores; 32 m cored; 8 m drilled; 31.2% recovery | ||||||
20-196 | Drilling/drill rig | DRILL | 1971-09-29T00:00:00 | 30.11620 | 148.57480 | -6194 | 5 cores; 32 m cored; 8 m drilled; 31.2 % recovery | ||||||
20-197 | Drilling/drill rig | DRILL | 1971-10-03T00:00:00 | 30.29070 | 147.67430 | -6153 | 1 cores; 8 m cored; 0 m drilled; 12.5 % recovery | ||||||
20-197_Site | Composite Core | COMPCORE | 1971-10-03T00:00:00 | 30.29070 | 147.67430 | -6153 | 1 cores; 8 m cored; 0 m drilled; 12.5% recovery | ||||||
20-198 | Drilling/drill rig | DRILL | 1971-10-10T00:00:00 | 25.82570 | 154.58420 | -5848 | MECHANICAL OR EQUIP FAILURE | ||||||
20-198A | Drilling/drill rig | DRILL | 1971-10-10T00:00:00 | 25.82570 | 154.58420 | -5958 | 4 cores; 34.5 m cored; 16.5 m drilled; 74.5 % recovery | ||||||
20-198_Site | Composite Core | COMPCORE | 1971-10-10T00:00:00 | 25.82570 | 154.58420 | -5958 | 4 cores; 34.5 m cored; 16.5 m drilled; 74.5% recovery | ||||||
20-199_Site | Composite Core | COMPCORE | 1971-10-23T00:00:00 | 13.51300 | 156.17230 | -6100 | 13 cores; 123.5 m cored; 0 m drilled; 47% recovery | ||||||
20-199 | Drilling/drill rig | DRILL | 1971-10-23T00:00:00 | 13.51300 | 156.17230 | -6100 | 13 cores; 123.5 m cored; 0 m drilled; 47 % recovery | ||||||
20-200A | Drilling/drill rig | DRILL | 1971-10-26T00:00:00 | 12.83670 | 156.78270 | -1479 | 0 cores; 0 m cored; 19 m drilled; % recovery | ||||||
20-200 | Drilling/drill rig | DRILL | 1971-10-26T00:00:00 | 12.83670 | 156.78270 | -1479 | 9 cores; 85.5 m cored; 9.5 m drilled; 41.4 % recovery | ||||||
20-200_Site | Composite Core | COMPCORE | 1971-10-26T00:00:00 | 12.83670 | 156.78270 | -1479 | 9 cores; 85.5 m cored; 28.5 m drilled; 41.4% recovery | ||||||
20-201 | Drilling/drill rig | DRILL | 1971-10-27T00:00:00 | 12.83150 | 156.74320 | -1564 | OPERATIONAL LIMIT REACHED | ||||||
20-202_Site | Composite Core | COMPCORE | 1971-10-28T00:00:00 | 12.81500 | 156.95250 | -1515 | 3 cores; 28.5 m cored; 28 m drilled; 8.8% recovery | ||||||
20-202 | Drilling/drill rig | DRILL | 1971-10-28T00:00:00 | 12.81500 | 156.95250 | -1515 | 3 cores; 28.5 m cored; 28 m drilled; 8.8 % recovery |