Event List of Leg182
Download as tab-delimited text
Event label | Optional label | Method/Device | Abbreviation | O2A Registry URI | Date/Time | Latitude | Longitude | Elevation | Date/Time end | Latitude end | Longitude end | Elevation end | Comment |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
182-1126 | Composite Core | COMPCORE | 1998-10-26T00:00:00 | -33.50937 | 128.06658 | -784 | 1998-10-30T00:00:00 | 81 cores; 730.3 m cored; 150 m drilled; 48.1% recovery | |||||
182-1126A | Drilling/drill rig | DRILL | 1998-10-26T00:00:00 | -33.50935 | 128.06658 | -784.8 | 1998-10-26T06:45:00 | 1 core; 9.5 m cored; 0 m drilled; 102 % recovery | |||||
182-1126B | Drilling/drill rig | DRILL | 1998-10-26T06:45:00 | -33.50935 | 128.06655 | -783.8 | 1998-10-27T14:15:00 | 30 cores; 253.5 m cored; 0 m drilled; 64 % recovery | |||||
182-1126C | Drilling/drill rig | DRILL | 1998-10-27T14:15:00 | -33.50940 | 128.06683 | -783.8 | 1998-10-28T04:30:00 | 17 cores; 154 m cored; 0 m drilled; 89.9 % recovery | |||||
182-1126D | Drilling/drill rig | DRILL | 1998-10-28T04:30:00 | -33.50935 | 128.06640 | -783.8 | 1998-10-30T15:30:00 | 33 cores; 313.3 m cored; 150 m drilled; 12.9 % recovery | |||||
182-1127 | Composite Core | COMPCORE | 1998-10-30T00:00:00 | -33.35747 | 128.48130 | -479 | 1998-11-03T00:00:00 | 56 cores; 520.2 m cored; 0 m drilled; 86.6% recovery | |||||
182-1127A | Drilling/drill rig | DRILL | 1998-10-30T18:00:00 | -33.35743 | 128.48130 | -478.7 | 1998-10-30T21:30:00 | 1 core; 9.5 m cored; 0 m drilled; 101.9 % recovery | |||||
182-1127B | Drilling/drill rig | DRILL | 1998-10-30T21:30:00 | -33.35750 | 128.48128 | -479.3 | 1998-11-03T01:45:00 | 55 cores; 510.7 m cored; 0 m drilled; 86.3 % recovery | |||||
182-1128 | Composite Core | COMPCORE | 1998-11-03T00:00:00 | -34.39108 | 127.59085 | -3874.8 | 1998-11-11T00:00:00 | 80 cores; 751.7 m cored; 231.2 m drilled; 73.5% recovery | |||||
182-1128A | Drilling/drill rig | DRILL | 1998-11-03T11:00:00 | -34.39115 | 127.59070 | -3876 | 1998-11-03T19:35:00 | 1 core; 9.5 m cored; 0 m drilled; 98 % recovery | |||||
182-1128B | Drilling/drill rig | DRILL | 1998-11-03T19:35:00 | -34.39118 | 127.59076 | -3874.6 | 1998-11-05T15:15:00 | 30 cores; 280.7 m cored; 0 m drilled; 82.5 % recovery | |||||
182-1128C | Drilling/drill rig | DRILL | 1998-11-05T15:15:00 | -34.39105 | 127.59103 | -3874.3 | 1998-11-07T03:30:00 | 26 cores; 240.1 m cored; 0 m drilled; 97 % recovery | |||||
182-1128D | Drilling/drill rig | DRILL | 1998-11-07T03:30:00 | -34.39093 | 127.59091 | -3874.2 | 1998-11-11T01:30:00 | 23 cores; 221.4 m cored; 231.2 m drilled; 35.7 % recovery | |||||
182-1130 | Composite Core | COMPCORE | 1998-11-11T00:00:00 | -33.42010 | 127.60217 | -487.6 | 84 cores; 786.8 m cored; 299.2 m drilled; 80.9% recovery | ||||||
182-1129 | Composite Core | COMPCORE | 1998-11-11T00:00:00 | -33.29312 | 128.48117 | -202.4 | 78 cores; 735 m cored; 385.1 m drilled; 57.6% recovery | ||||||
182-1129A | Drilling/drill rig | DRILL | 1998-11-11T10:30:00 | -33.28976 | 128.48120 | -202.9 | 1998-11-11T17:00:00 | 2 cores; 13.8 m cored; 9.5 m drilled; 96.2 % recovery | |||||
182-1129B | Drilling/drill rig | DRILL | 1998-11-11T17:00:00 | -33.28963 | 128.48100 | -202.3 | 1998-11-20T02:30:00 | 2 cores; 19 m cored; 22 m drilled; 53.9 % recovery | |||||
182-1130A | Drilling/drill rig | DRILL | 1998-11-11T22:07:00 | -33.42018 | 127.60233 | -486.7 | 1998-11-13T18:15:00 | 41 core; 380.4 m cored; 0 m drilled; 82.1 % recovery | |||||
182-1130B | Drilling/drill rig | DRILL | 1998-11-13T18:15:00 | -33.42015 | 127.60208 | -488.1 | 1998-11-14T15:30:00 | 33 cores; 310.4 m cored; 0 m drilled; 96.9 % recovery | |||||
182-1130C | Drilling/drill rig | DRILL | 1998-11-14T15:30:00 | -33.41998 | 127.60208 | -488 | 1998-11-16T08:45:00 | 10 cores; 96 m cored; 299.2 m drilled; 24.3 % recovery | |||||
182-1131 | Composite Core | COMPCORE | 1998-11-16T00:00:00 | -33.32600 | 128.48105 | -332.4 | 78 cores; 722.7 m cored; 0 m drilled; 64.6% recovery | ||||||
182-1131A | Drilling/drill rig | DRILL | 1998-11-16T13:38:00 | -33.32610 | 128.48120 | -333.4 | 1998-11-19T18:00:00 | 66 cores; 616.9 m cored; 0 m drilled; 60.3 % recovery | |||||
182-1132 | Composite Core | COMPCORE | 1998-11-20T00:00:00 | -33.31607 | 127.60215 | -218.3 | 72 cores; 660.1 m cored; 237 m drilled; 37.7% recovery | ||||||
182-1131B | Drilling/drill rig | DRILL | 1998-11-20T03:35:00 | -33.32590 | 128.48088 | -331.4 | 1998-11-20T17:30:00 | 12 cores; 105.8 m cored; 0 m drilled; 90.1 % recovery | |||||
182-1132A | Drilling/drill rig | DRILL | 1998-11-20T22:21:00 | 33.31595 | 127.60216 | -218 | 1998-11-21T01:15:00 | 1 core; 9.3 m cored; 0 m drilled; 99.2 % recovery | |||||
182-1132B | Drilling/drill rig | DRILL | 1998-11-21T01:15:00 | -33.31618 | 127.60220 | -218.5 | 1998-11-22T04:25:00 | 32 cores; 284.6 m cored; 0 m drilled; 76.4 % recovery | |||||
182-1132C | Drilling/drill rig | DRILL | 1998-11-22T04:25:00 | -33.31603 | 127.60206 | -218.5 | 1998-11-24T18:15:00 | 39 cores; 366.2 m cored; 237 m drilled; 6.1 % recovery | |||||
182-1129C | Drilling/drill rig | DRILL | 1998-11-24T23:24:00 | -33.29656 | 128.48130 | -202.4 | 1998-11-26T18:30:00 | 48 cores; 451.6 m cored; 0 m drilled; 71.5 % recovery | |||||
182-1133 | Composite Core | COMPCORE | 1998-11-26T00:00:00 | -33.53965 | 128.90525 | -1037.1 | 26 cores; 214.9 m cored; 0 m drilled; 44.5% recovery | ||||||
182-1133A | Drilling/drill rig | DRILL | 1998-11-26T22:00:00 | -33.53948 | 128.90510 | -1037.2 | 1998-11-27T02:20:00 | 1 core; 9.5 m cored; 0 m drilled; 102.9 % recovery | |||||
182-1133B | Drilling/drill rig | DRILL | 1998-11-27T02:20:00 | -33.53963 | 128.90528 | -1037.2 | 1998-11-27T22:00:00 | 19 cores; 152.1 m cored; 0 m drilled; 31.9 % recovery | |||||
182-1133C | Drilling/drill rig | DRILL | 1998-11-27T22:00:00 | -33.53981 | 128.90535 | -1036.8 | 1998-11-28T13:30:00 | 6 cores; 53.3 m cored; 0 m drilled; 69.9 % recovery | |||||
182-1129D | Drilling/drill rig | DRILL | 1998-11-28T16:42:00 | -33.29646 | 128.48111 | -202.1 | 26 cores; 250.6 m cored; 353.6 m drilled; 30.6 % recovery | ||||||
182-1134 | Composite Core | COMPCORE | 1998-12-01T00:00:00 | -33.52887 | 127.26398 | -700.5 | 68 cores; 631.9 m cored; 0 m drilled; 56.1% recovery | ||||||
182-1134A | Drilling/drill rig | DRILL | 1998-12-01T04:30:00 | -33.52873 | 127.26400 | -701 | 1998-12-03T13:35:00 | 43 cores; 397.1 m cored; 0 m drilled; 49.2 % recovery | |||||
182-1134B | Drilling/drill rig | DRILL | 1998-12-03T13:35:00 | -33.52898 | 127.26396 | -699.9 | 1998-12-04T11:30:00 | 25 cores; 234.8 m cored; 0 m drilled; 67.6 % recovery |