Event List of Leg181
Download as tab-delimited text
Event label | Optional label | Method/Device | Abbreviation | Sensor URI | Date/Time | Latitude | Longitude | Elevation | Date/Time end | Latitude end | Longitude end | Elevation end | Comment |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
181-1119 | Composite Core | COMPCORE | 1998-08-05T00:00:00 | -44.75553 | 172.39338 | -396.2 | 1998-08-26T00:00:00 | 70 cores; 656.6 m cored; 0 m drilled; 93.3% recovery | |||||
181-1119A | Drilling/drill rig | DRILL | 1998-08-05T04:30:00 | -44.75553 | 172.39330 | -395.5 | 1998-08-23T10:20:00 | 1 core; 6 m cored; 0 m drilled; 100.2 % recovery | |||||
181-1119B | Drilling/drill rig | DRILL | 1998-08-23T10:20:00 | -44.75553 | 172.39330 | -396.8 | 1998-08-24T00:20:00 | 17 cores; 155.8 m cored; 0 m drilled; 105.6 % recovery | |||||
181-1119C | Drilling/drill rig | DRILL | 1998-08-24T00:20:00 | -44.75551 | 172.39356 | -396.2 | 1998-08-26T19:15:00 | 52 cores; 494.8 m cored; 0 m drilled; 89.4 % recovery | |||||
181-1120 | Composite Core | COMPCORE | 1998-08-26T00:00:00 | -50.06352 | 173.37165 | -544.7 | 1998-09-01T00:00:00 | 36 cores; 300.5 m cored; 157.4 m drilled; 87.3% recovery | |||||
181-1120A | Drilling/drill rig | DRILL | 1998-08-26T19:15:00 | -50.06338 | 173.37166 | -542.9 | 1998-08-28T06:00:00 | 1 core; 4.6 m cored; 0 m drilled; 100 % recovery | |||||
181-1120B | Drilling/drill rig | DRILL | 1998-08-28T06:00:00 | -50.06338 | 173.37166 | -544.2 | 1998-08-28T20:20:00 | 21 core; 188 m cored; 0 m drilled; 77.9 % recovery | |||||
181-1120C | Drilling/drill rig | DRILL | 1998-08-28T20:20:00 | -50.06358 | 173.37165 | -545.9 | 1998-08-30T06:13:00 | 5 cores; 44.6 m cored; 0 m drilled; 100.8 % recovery | |||||
181-1120D | Drilling/drill rig | DRILL | 1998-08-30T06:13:00 | -50.06370 | 173.37165 | -545.9 | 1998-09-01T06:00:00 | 9 cores; 63.3 m cored; 157.4 m drilled; 104.5 % recovery | |||||
181-1121 | Composite Core | COMPCORE | 1998-09-01T00:00:00 | -50.89793 | 176.99770 | -4490 | 1998-09-04T00:00:00 | 18 cores; 148.1 m cored; 0 m drilled; 65% recovery | |||||
181-1121A | Drilling/drill rig | DRILL | 1998-09-01T06:00:00 | -50.89793 | 176.99770 | -4492 | 1998-09-02T15:55:00 | 1 core; 8.4 m cored; 0 m drilled; 99.6 % recovery | |||||
181-1121B | Drilling/drill rig | DRILL | 1998-09-02T15:55:00 | -50.89793 | 176.99770 | -4487.9 | 1998-09-04T10:45:00 | 17 cores; 139.7 m cored; 0 m drilled; 62.9 % recovery | |||||
181-1122 | Composite Core | COMPCORE | 1998-09-04T00:00:00 | -46.57967 | -177.39363 | -4432.2 | 1998-09-12T00:00:00 | 82 cores; 760.8 m cored; 0 m drilled; 59% recovery | |||||
181-1122A | Drilling/drill rig | DRILL | 1998-09-04T10:45:00 | -46.57968 | -177.39351 | -4435 | 1998-09-07T04:15:00 | 13 cores; 123.9 m cored; 0 m drilled; 70.6 % recovery | |||||
181-1122B | Drilling/drill rig | DRILL | 1998-09-07T04:15:00 | -46.57966 | -177.39370 | -4429.8 | 1998-09-07T06:25:00 | 1 core; 9.5 m cored; 0 m drilled; 103.3 % recovery | |||||
181-1122C | Drilling/drill rig | DRILL | 1998-09-07T06:25:00 | -46.57966 | -177.39370 | -4431.8 | 1998-09-12T08:00:00 | 68 cores; 627.4 m cored; 0 m drilled; 56 % recovery | |||||
181-1123 | Composite Core | COMPCORE | 1998-09-12T00:00:00 | -41.78600 | -171.49900 | -3290 | 1998-09-24T00:00:00 | 102 cores; 957 m cored; 322.9 m drilled; 94% recovery | |||||
181-1123A | Drilling/drill rig | DRILL | 1998-09-12T08:00:00 | -41.78623 | -171.49900 | -3290.1 | 1998-09-14T23:55:00 | 17 cores; 158.1 m cored; 0 m drilled; 100.3 % recovery | |||||
181-1123B | Drilling/drill rig | DRILL | 1998-09-14T23:55:00 | -41.78600 | -171.49898 | -3289.8 | 1998-09-19T09:55:00 | 52 cores; 489 m cored; 0 m drilled; 92.3 % recovery | |||||
181-1123C | Drilling/drill rig | DRILL | 1998-09-19T09:55:00 | -41.78578 | -171.49900 | -3290.1 | 1998-09-24T10:00:00 | 33 cores; 309.9 m cored; 322.9 m drilled; 93.4 % recovery | |||||
181-1124 | Composite Core | COMPCORE | 1998-09-24T00:00:00 | -39.49828 | -176.53155 | -3966.8 | 1998-10-01T00:00:00 | 66 cores; 617.5 m cored; 30.6 m drilled; 94.7% recovery | |||||
181-1124A | Drilling/drill rig | DRILL | 1998-09-24T10:00:00 | -39.49835 | -176.53156 | -3967.5 | 1998-09-26T03:05:00 | 1 core; 9.5 m cored; 0 m drilled; 100.1 % recovery | |||||
181-1124B | Drilling/drill rig | DRILL | 1998-09-26T03:05:00 | -39.49835 | -176.53156 | -3966.6 | 1998-09-26T17:45:00 | 2 cores; 9.9 m cored; 0 m drilled; 99.9 % recovery | |||||
181-1124C | Drilling/drill rig | DRILL | 1998-09-26T17:45:00 | -39.49835 | -176.53156 | -3966.5 | 1998-09-30T16:30:00 | 49 cores; 465.1 m cored; 8 m drilled; 93.3 % recovery | |||||
181-1124D | Drilling/drill rig | DRILL | 1998-09-30T16:30:00 | -39.49806 | -176.53151 | -3966.5 | 1998-10-01T23:30:00 | 14 cores; 133 m cored; 22.6 m drilled; 99.1 % recovery | |||||
181-1125 | Composite Core | COMPCORE | 1998-10-01T00:00:00 | -42.54980 | -178.16647 | -1365.1 | 1998-10-06T00:00:00 | 80 cores; 755.6 m cored; 0 m drilled; 95.4% recovery | |||||
181-1125A | Drilling/drill rig | DRILL | 1998-10-01T23:30:00 | -42.54993 | -178.16648 | -1364.6 | 1998-10-03T20:00:00 | 22 cores; 203.5 m cored; 0 m drilled; 102.7 % recovery | |||||
181-1125B | Drilling/drill rig | DRILL | 1998-10-03T20:00:00 | -42.54965 | -178.16645 | -1365.6 | 1998-10-06T17:30:00 | 58 cores; 552.1 m cored; 0 m drilled; 92.7 % recovery |