Event List of Leg180
Download as tab-delimited text
Event label | Optional label | Method/Device | Abbreviation | Sensor URI | Date/Time | Latitude | Longitude | Elevation | Date/Time end | Latitude end | Longitude end | Elevation end | Comment |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
180-1108 | Composite Core | COMPCORE | 1998-06-17T00:00:00 | -9.74527 | 151.62547 | -3169.9 | 1998-06-24T00:00:00 | 51 cores; 485.2 m cored; 16.3 m drilled; 30.6% recovery | |||||
180-1108A | Drilling/drill rig | DRILL | 1998-06-17T01:15:00 | -9.74513 | 151.62523 | -3162.7 | 1998-06-17T15:30:00 | 0 cores; 0 m cored; 16.3 m drilled | |||||
180-1108B | Drilling/drill rig | DRILL | 1998-06-17T15:30:00 | -9.74540 | 151.62571 | -3177.2 | 1998-06-24T09:00:00 | 51 core; 485.2 m cored; 0 m drilled; 30.6 % recovery | |||||
180-1109 | Composite Core | COMPCORE | 1998-06-24T00:00:00 | -9.50648 | 151.57302 | -2211 | 1998-07-04T00:00:00 | 95 cores; 849.2 m cored; 352.8 m drilled; 76.3% recovery | |||||
180-1109A | Drilling/drill rig | DRILL | 1998-06-24T10:30:00 | -9.50650 | 151.57310 | -2210.9 | 1998-06-24T16:30:00 | 1 core; 9.5 m cored; 0 m drilled; 104.8 % recovery | |||||
180-1109B | Drilling/drill rig | DRILL | 1998-06-24T16:30:00 | -9.50660 | 151.57320 | -2211.1 | 1998-06-24T18:30:00 | 2 cores; 14.8 m cored; 0 m drilled; 102.3 % recovery | |||||
180-1109C | Drilling/drill rig | DRILL | 1998-06-24T18:30:00 | -9.50650 | 151.57320 | -2211 | 1998-06-27T08:00:00 | 41 core; 375.7 m cored; 0 m drilled; 86 % recovery | |||||
180-1109D | Drilling/drill rig | DRILL | 1998-06-27T08:00:00 | -9.50633 | 151.57258 | -2211 | 1998-07-04T00:15:00 | 51 core; 449.2 m cored; 352.8 m drilled; 66.8 % recovery | |||||
180-1110 | Composite Core | COMPCORE | 1998-07-04T00:00:00 | -9.72665 | 151.57518 | -3246.1 | 1998-07-05T00:00:00 | 6 cores; 37.8 m cored; 15 m drilled; 39.6% recovery | |||||
180-1110A | Drilling/drill rig | DRILL | 1998-07-04T06:00:00 | -9.72666 | 151.57520 | -3246.4 | 1998-07-04T11:00:00 | 2 cores; 9.5 m cored; 0 m drilled; 100 % recovery | |||||
180-1110B | Drilling/drill rig | DRILL | 1998-07-04T11:00:00 | -9.72681 | 151.57515 | -3246.3 | 1998-07-04T23:30:00 | 3 cores; 22.3 m cored; 0 m drilled; 24.1 % recovery | |||||
180-1110C | Drilling/drill rig | DRILL | 1998-07-04T23:30:00 | -9.72665 | 151.57496 | -3245.8 | 1998-07-05T13:00:00 | 0 cores; 0 m cored; 15 m drilled | |||||
180-1111 | Composite Core | COMPCORE | 1998-07-05T00:00:00 | -9.71765 | 151.57557 | -3200.7 | 1998-07-07T00:00:00 | 18 cores; 173.7 m cored; 0 m drilled; 8.7% recovery | |||||
180-1110D | Drilling/drill rig | DRILL | 1998-07-05T13:00:00 | -9.72646 | 151.57541 | -3245.8 | 1998-07-05T18:45:00 | 1 core; 6 m cored; 0 m drilled; 1.7 % recovery | |||||
180-1111A | Drilling/drill rig | DRILL | 1998-07-05T18:45:00 | -9.71765 | 151.57556 | -3200.7 | 1998-07-07T04:30:00 | 18 cores; 173.7 m cored; 0 m drilled; 8.7 % recovery | |||||
180-1112 | Composite Core | COMPCORE | 1998-07-07T00:00:00 | -9.74578 | 151.61195 | -3046.6 | 1998-07-11T00:00:00 | 18 cores; 160.9 m cored; 0 m drilled; 4.4% recovery | |||||
180-1112A | Drilling/drill rig | DRILL | 1998-07-07T04:30:00 | -9.74581 | 151.61201 | -3046.7 | 1998-07-08T04:30:00 | 14 cores; 122.4 m cored; 0 m drilled; 4.8 % recovery | |||||
180-1112B | Drilling/drill rig | DRILL | 1998-07-08T04:30:00 | -9.74576 | 151.61190 | -3046.6 | 1998-07-11T14:00:00 | 4 cores; 38.5 m cored; 0 m drilled; 3.1 % recovery | |||||
180-1113 | Composite Core | COMPCORE | 1998-07-11T00:00:00 | -9.75748 | 151.61227 | -2915.6 | 1998-07-12T00:00:00 | 3 cores; 25.2 m cored; 0 m drilled; 1.7% recovery | |||||
180-1113A | Drilling/drill rig | DRILL | 1998-07-11T14:00:00 | -9.75748 | 151.61226 | -2915.6 | 1998-07-12T20:00:00 | 3 cores; 25.2 m cored; 0 m drilled; 1.7 % recovery | |||||
180-1114 | Composite Core | COMPCORE | 1998-07-12T00:00:00 | -9.79355 | 151.57507 | -406.5 | 1998-07-16T00:00:00 | 37 cores; 352.8 m cored; 0 m drilled; 12.4% recovery | |||||
180-1114A | Drilling/drill rig | DRILL | 1998-07-12T20:00:00 | -9.79355 | 151.57506 | -406.5 | 1998-07-16T08:00:00 | 37 cores; 352.8 m cored; 0 m drilled; 12.4 % recovery | |||||
180-1115 | Composite Core | COMPCORE | 1998-07-16T00:00:00 | -9.18975 | 151.57395 | -1149 | 1998-07-22T00:00:00 | 86 cores; 816.8 m cored; 283.2 m drilled; 71.4% recovery | |||||
180-1115A | Drilling/drill rig | DRILL | 1998-07-16T11:45:00 | -9.18981 | 151.57415 | -1149.6 | 1998-07-16T15:15:00 | 1 core; 4.4 m cored; 0 m drilled; 100.7 % recovery | |||||
180-1115B | Drilling/drill rig | DRILL | 1998-07-16T15:15:00 | -9.18970 | 151.57396 | -1148.8 | 1998-07-17T16:15:00 | 31 core; 293.1 m cored; 0 m drilled; 97.9 % recovery | |||||
180-1115C | Drilling/drill rig | DRILL | 1998-07-17T15:15:00 | -9.18971 | 151.57370 | -1148.7 | 1998-07-22T22:30:00 | 54 cores; 519.3 m cored; 283.2 m drilled; 56.2 % recovery | |||||
180-1116 | Composite Core | COMPCORE | 1998-07-23T00:00:00 | -9.86557 | 151.57513 | -1851.3 | 1998-07-26T00:00:00 | 18 cores; 158.9 m cored; 0 m drilled; 20.5% recovery | |||||
180-1116A | Drilling/drill rig | DRILL | 1998-07-23T03:30:00 | -9.86556 | 151.57513 | -1851.3 | 1998-07-26T11:00:00 | 18 cores; 158.9 m cored; 0 m drilled; 20.5 % recovery | |||||
180-1117 | Composite Core | COMPCORE | 1998-07-26T00:00:00 | -9.77540 | 151.54912 | -1163.2 | 1998-07-28T00:00:00 | 16 cores; 130.1 m cored; 0 m drilled; 5% recovery | |||||
180-1117A | Drilling/drill rig | DRILL | 1998-07-26T11:00:00 | -9.77543 | 151.54908 | -1163.2 | 1998-07-28T04:00:00 | 14 cores; 111.1 m cored; 0 m drilled; 5.8 % recovery | |||||
180-1118 | Composite Core | COMPCORE | 1998-07-28T00:00:00 | -9.58517 | 151.57368 | -2303.6 | 1998-08-05T00:00:00 | 76 cores; 721.6 m cored; 205 m drilled; 64.6% recovery | |||||
180-1117B | Drilling/drill rig | DRILL | 1998-07-28T04:00:00 | -9.77545 | 151.54918 | -1163.2 | 1998-07-28T08:30:00 | 1 core; 9.5 m cored; 0 m drilled; 0.5 % recovery | |||||
180-1117C | Drilling/drill rig | DRILL | 1998-07-28T08:30:00 | -9.77533 | 151.54905 | -1163.2 | 1998-07-28T14:45:00 | 1 core; 9.5 m cored; 0 m drilled; 1.1 % recovery | |||||
180-1118A | Drilling/drill rig | DRILL | 1998-07-28T14:45:00 | -9.58516 | 151.57368 | -2303.6 | 1998-08-05T04:30:00 | 76 cores; 721.6 m cored; 205 m drilled; 64.6 % recovery |