Event List of Leg164
Download as tab-delimited text
Event label | Optional label | Method/Device | Abbreviation | Sensor URI | Date/Time | Latitude | Longitude | Elevation | Date/Time end | Latitude end | Longitude end | Elevation end | Comment |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
164-996B | Drilling/drill rig | DRILL | 1995-04-12T17:15:00 | 32.49390 | -76.19090 | -2172.7 | 1995-12-04T18:00:00 | 1 core; 3.4 m cored; 0 m drilled; 100 % recovery | |||||
164-992 | Composite Core | COMPCORE | 1995-11-05T00:00:00 | 32.97570 | -75.91600 | -2586.9 | 1995-11-06T00:00:00 | 6 cores; 50.3 m cored; 0 m drilled; 104.6% recovery | |||||
164-991 | Composite Core | COMPCORE | 1995-11-05T00:00:00 | 32.98360 | -75.92995 | -2567.5 | 1995-11-05T00:00:00 | 8 cores; 58.6 m cored; 0 m drilled; 101.7% recovery | |||||
164-991A | Drilling/drill rig | DRILL | 1995-11-05T12:22:00 | 32.98360 | -75.93000 | -2567.5 | 1995-11-05T14:18:00 | 6 cores; 56.6 m cored; 0 m drilled; 103.5 % recovery | |||||
164-991B | Drilling/drill rig | DRILL | 1995-11-05T14:18:00 | 32.98360 | -75.92990 | -2567.5 | 1995-11-05T19:53:00 | 2 cores; 2 m cored; 0 m drilled; 52 % recovery | |||||
164-992A | Drilling/drill rig | DRILL | 1995-11-05T23:30:00 | 32.97570 | -75.91600 | -2586.9 | 1995-11-06T06:40:00 | 6 cores; 50.3 m cored; 0 m drilled; 104.6 % recovery | |||||
164-993 | Composite Core | COMPCORE | 1995-11-06T00:00:00 | 32.96290 | -75.89480 | -2641.8 | 1995-11-07T00:00:00 | 6 cores; 51.9 m cored; 0 m drilled; 88.1% recovery | |||||
164-993A | Drilling/drill rig | DRILL | 1995-11-06T08:49:00 | 32.96290 | -75.89480 | -2641.8 | 1995-11-07T06:15:00 | 6 cores; 51.9 m cored; 0 m drilled; 88.1 % recovery | |||||
164-994 | Composite Core | COMPCORE | 1995-11-07T00:00:00 | 31.78570 | -75.54582 | -2798.4 | 1995-11-20T00:00:00 | 98 cores; 833 m cored; 0 m drilled; 73.8% recovery | |||||
164-994A | Drilling/drill rig | DRILL | 1995-11-07T14:08:00 | 31.78570 | -75.54590 | -2797.6 | 1995-11-07T23:50:00 | 4 cores; 36.4 m cored; 0 m drilled; 102.4 % recovery | |||||
164-994C | Drilling/drill rig | DRILL | 1995-11-08T12:45:00 | 31.78570 | -75.54590 | -2799.1 | 1995-11-15T01:10:00 | 84 cores; 703.5 m cored; 0 m drilled; 71.3 % recovery | |||||
164-994B | Drilling/drill rig | DRILL | 1995-11-08T23:50:00 | 31.78570 | -75.54570 | -2797.6 | 1995-11-08T00:45:00 | 1 core; 6.9 m cored; 0 m drilled; 100.6 % recovery | |||||
164-994D | Drilling/drill rig | DRILL | 1995-11-15T01:10:00 | 31.78570 | -75.54580 | -2799.1 | 1995-11-20T03:45:00 | 9 cores; 86.2 m cored; 0 m drilled; 80.5 % recovery | |||||
164-995 | Composite Core | COMPCORE | 1995-11-20T00:00:00 | 31.80355 | -75.52235 | -2777.7 | 1995-12-03T00:00:00 | 97 cores; 808.9 m cored; 0 m drilled; 66.8% recovery | |||||
164-995A | Drilling/drill rig | DRILL | 1995-11-20T07:49:00 | 31.80350 | -75.52240 | -2778.5 | 1995-11-26T13:08:00 | 83 cores; 704.5 m cored; 0 m drilled; 68 % recovery | |||||
164-995B | Drilling/drill rig | DRILL | 1995-11-26T13:08:00 | 31.80360 | -75.52230 | -2776.9 | 1995-12-03T11:50:00 | 14 cores; 104.4 m cored; 0 m drilled; 58.7 % recovery | |||||
164-996 | Composite Core | COMPCORE | 1995-12-03T00:00:00 | 32.49388 | -76.19090 | -2170.5 | 1995-12-06T00:00:00 | 27 cores; 183.5 m cored; 0 m drilled; 45.4% recovery | |||||
164-996A | Drilling/drill rig | DRILL | 1995-12-03T20:30:00 | 32.49390 | -76.19090 | -2169.6 | 1995-12-04T17:15:00 | 9 cores; 63 m cored; 0 m drilled; 27.4 % recovery | |||||
164-996C | Drilling/drill rig | DRILL | 1995-12-04T18:55:00 | 32.49390 | -76.19090 | -2170.7 | 1995-12-05T03:00:00 | 2 cores; 2.6 m cored; 0 m drilled; 100.4 % recovery | |||||
164-996D | Drilling/drill rig | DRILL | 1995-12-05T03:00:00 | 32.49390 | -76.19130 | -2169.6 | 1995-12-05T15:40:00 | 7 cores; 52.2 m cored; 0 m drilled; 29.8 % recovery | |||||
164-996E | Drilling/drill rig | DRILL | 1995-12-05T16:00:00 | 32.49380 | -76.19050 | -2170 | 1995-12-06T08:00:00 | 8 cores; 62.3 m cored; 0 m drilled; 71.4 % recovery | |||||
164-997 | Composite Core | COMPCORE | 1995-12-06T00:00:00 | 31.84320 | -75.46855 | -2770.1 | 1995-12-17T00:00:00 | 102 cores; 798.9 m cored; 0 m drilled; 73.3% recovery | |||||
164-997A | Drilling/drill rig | DRILL | 1995-12-06T12:35:00 | 31.84310 | -75.46860 | -2770.1 | 1995-12-10T00:10:00 | 55 cores; 434.3 m cored; 0 m drilled; 78.9 % recovery | |||||
164-997B | Drilling/drill rig | DRILL | 1995-12-10T00:30:00 | 31.84330 | -75.46850 | -2770.1 | 1995-12-17T07:25:00 | 47 cores; 364.6 m cored; 0 m drilled; 66.6 % recovery |