Event List of Leg162
Download as tab-delimited text
Event label | Optional label | Method/Device | Abbreviation | O2A Registry URI | Date/Time | Latitude | Longitude | Elevation | Date/Time end | Latitude end | Longitude end | Elevation end | Comment |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
162-980 | Composite Core | COMPCORE | 1995-07-10T00:00:00 | 55.48493 | -14.70227 | -2180 | 1995-07-11T00:00:00 | 39 cores; 353.7 m cored; 0 m drilled; 103.7% recovery | |||||
162-980A | Drilling/drill rig | DRILL | 1995-07-10T08:46:00 | 55.48480 | -14.70220 | -2182 | 1995-07-11T01:40:00 | 12 cores; 113.9 m cored; 0 m drilled; 103.3 % recovery | |||||
162-980B | Drilling/drill rig | DRILL | 1995-07-11T01:40:00 | 55.48500 | -14.70230 | -2179 | 1995-07-11T13:00:00 | 13 cores; 118.2 m cored; 0 m drilled; 103.6 % recovery | |||||
162-980C | Drilling/drill rig | DRILL | 1995-07-11T13:00:00 | 55.48500 | -14.70230 | -2179 | 1995-07-11T22:00:00 | 14 cores; 121.6 m cored; 0 m drilled; 104.1 % recovery | |||||
162-981 | Composite Core | COMPCORE | 1995-07-12T00:00:00 | 55.47740 | -14.65080 | -2277.3 | 1995-07-15T00:00:00 | 88 cores; 822.1 m cored; 0 m drilled; 103.2% recovery | |||||
162-981A | Drilling/drill rig | DRILL | 1995-07-12T01:20:00 | 55.47720 | -14.65080 | -2184 | 1995-07-13T07:00:00 | 34 cores; 320 m cored; 0 m drilled; 102.3 % recovery | |||||
162-981B | Drilling/drill rig | DRILL | 1995-07-13T07:00:00 | 55.47750 | -14.65080 | -2184 | 1995-07-13T22:55:00 | 24 cores; 220.9 m cored; 0 m drilled; 102.9 % recovery | |||||
162-981C | Drilling/drill rig | DRILL | 1995-07-13T22:55:00 | 55.47750 | -14.65080 | -2464 | 1995-07-15T03:15:00 | 30 cores; 281.2 m cored; 0 m drilled; 104.5 % recovery | |||||
162-982 | Composite Core | COMPCORE | 1995-07-15T00:00:00 | 57.51267 | -15.85418 | -1134.2 | 1995-07-19T00:00:00 | 120 cores; 1123.9 m cored; 0 m drilled; 89.7% recovery | |||||
162-982A | Drilling/drill rig | DRILL | 1995-07-15T18:15:00 | 57.50000 | -15.86670 | -1135 | 1995-07-16T12:00:00 | 27 cores; 248.7 m cored; 0 m drilled; 101.8 % recovery | |||||
162-982B | Drilling/drill rig | DRILL | 1995-07-16T12:00:00 | 57.51670 | -15.85000 | -1134 | 1995-07-19T02:25:00 | 65 cores; 614.9 m cored; 0 m drilled; 79.4 % recovery | |||||
162-982C | Drilling/drill rig | DRILL | 1995-07-19T02:25:00 | 57.51700 | -15.85000 | -1134 | 1995-07-19T16:10:00 | 27 cores; 250.8 m cored; 0 m drilled; 102.3 % recovery | |||||
162-982D | Drilling/drill rig | DRILL | 1995-07-19T16:10:00 | 57.51700 | -15.85000 | -1134 | 1995-07-19T21:12:00 | 1 core; 9.5 m cored; 0 m drilled; 102.9 % recovery | |||||
162-983 | Composite Core | COMPCORE | 1995-07-21T00:00:00 | 60.40350 | -23.64067 | -1983.7 | 1995-07-24T00:00:00 | 82 cores; 766.5 m cored; 0 m drilled; 104.1% recovery | |||||
162-983A | Drilling/drill rig | DRILL | 1995-07-21T11:58:00 | 60.40330 | -23.64060 | -1983 | 1995-07-22T09:29:00 | 27 cores; 254.4 m cored; 0 m drilled; 103.9 % recovery | |||||
162-983B | Drilling/drill rig | DRILL | 1995-07-22T09:29:00 | 60.40360 | -23.64060 | -1983 | 1995-07-23T03:09:00 | 27 cores; 251.7 m cored; 0 m drilled; 104 % recovery | |||||
162-983C | Drilling/drill rig | DRILL | 1995-07-23T03:09:00 | 60.40360 | -23.64080 | -1985 | 1995-07-24T02:00:00 | 28 cores; 260.4 m cored; 0 m drilled; 104.4 % recovery | |||||
162-984 | Composite Core | COMPCORE | 1995-07-24T00:00:00 | 61.42532 | -24.08242 | -1648.5 | 1995-07-29T00:00:00 | 115 cores; 1083.1 m cored; 0 m drilled; 96.9% recovery | |||||
162-984A | Drilling/drill rig | DRILL | 1995-07-24T10:20:00 | 61.42510 | -24.08220 | -1649 | 1995-07-25T02:46:00 | 19 cores; 176.1 m cored; 0 m drilled; 102.3 % recovery | |||||
162-984B | Drilling/drill rig | DRILL | 1995-07-25T02:46:00 | 61.42530 | -24.08250 | -1648 | 1995-07-28T08:20:00 | 53 cores; 503.7 m cored; 0 m drilled; 91 % recovery | |||||
162-984C | Drilling/drill rig | DRILL | 1995-07-28T08:20:00 | 61.42530 | -24.08250 | -1649 | 1995-07-29T01:45:00 | 31 core; 290.4 m cored; 0 m drilled; 101.9 % recovery | |||||
162-984D | Drilling/drill rig | DRILL | 1995-07-29T01:45:00 | 61.42560 | -24.08250 | -1648 | 1995-07-29T17:42:00 | 12 cores; 112.9 m cored; 0 m drilled; 102.1 % recovery | |||||
162-907 | Composite Core | COMPCORE | 1995-07-31T00:00:00 | 69.24150 | -12.69830 | -1801.5 | 1995-08-02T00:00:00 | 46 cores; 426.8 m cored; 0 m drilled; 103% recovery | |||||
162-907B | Drilling/drill rig | DRILL | 1995-07-31T23:45:00 | 69.24970 | -12.69830 | -1802 | 1995-08-01T19:20:00 | 23 cores; 211.7 m cored; 0 m drilled; 103.7 % recovery | |||||
162-907C | Drilling/drill rig | DRILL | 1995-08-01T19:20:00 | 69.23330 | -12.69830 | -1801 | 1995-08-02T11:38:00 | 23 cores; 215.1 m cored; 0 m drilled; 102.4 % recovery | |||||
162-985 | Composite Core | COMPCORE | 1995-08-03T00:00:00 | 66.94155 | -6.45015 | -2833.5 | 1995-08-07T00:00:00 | 76 cores; 714.8 m cored; 0 m drilled; 95.5% recovery | |||||
162-985A | Drilling/drill rig | DRILL | 1995-08-03T13:58:00 | 66.94140 | -6.45030 | -2788 | 1995-08-07T04:15:00 | 62 cores; 587.9 m cored; 0 m drilled; 94.1 % recovery | |||||
162-985B | Drilling/drill rig | DRILL | 1995-08-07T04:15:00 | 66.94170 | -6.45000 | -2879 | 1995-08-07T19:15:00 | 14 cores; 126.9 m cored; 0 m drilled; 102 % recovery | |||||
162-986 | Composite Core | COMPCORE | 1995-08-10T00:00:00 | 77.34045 | 9.07772 | -2052.2 | 1995-08-20T00:00:00 | 130 cores; 1206.3 m cored; 0 m drilled; 55.4% recovery | |||||
162-986A | Drilling/drill rig | DRILL | 1995-08-10T12:08:00 | 77.34060 | -9.07778 | -2052 | 1995-08-11T12:30:00 | 24 cores; 206 m cored; 0 m drilled; 88 % recovery | |||||
162-986B | Drilling/drill rig | DRILL | 1995-08-11T12:30:00 | 77.34060 | -9.07778 | -2053 | 1995-08-11T14:25:00 | 2 cores; 15.5 m cored; 0 m drilled; 97.4 % recovery | |||||
162-986C | Drilling/drill rig | DRILL | 1995-08-11T14:25:00 | 77.34060 | -9.07778 | -2052 | 1995-08-14T15:05:00 | 44 cores; 408 m cored; 0 m drilled; 56.3 % recovery | |||||
162-986D | Drilling/drill rig | DRILL | 1995-08-14T15:05:00 | 77.34000 | -9.07750 | -2052 | 1995-08-20T20:45:00 | 60 cores; 576.8 m cored; 0 m drilled; 41.9 % recovery | |||||
162-987 | Composite Core | COMPCORE | 1995-08-23T00:00:00 | 70.49657 | -17.93673 | -1663.2 | 1995-09-01T00:00:00 | 132 cores; 1211.2 m cored; 0 m drilled; 71.8% recovery | |||||
162-987A | Drilling/drill rig | DRILL | 1995-08-23T09:20:00 | 70.49670 | -17.93750 | -1672 | 1995-08-24T08:17:00 | 22 cores; 199.3 m cored; 0 m drilled; 86.8 % recovery | |||||
162-987B | Drilling/drill rig | DRILL | 1995-08-24T08:17:00 | 70.49670 | -17.93700 | -1672 | 1995-08-24T18:50:00 | 11 core; 99.2 m cored; 0 m drilled; 74.8 % recovery | |||||
162-987C | Drilling/drill rig | DRILL | 1995-08-24T18:50:00 | 70.49640 | -17.93640 | -1671 | 1995-08-24T21:45:00 | 5 cores; 43.6 m cored; 0 m drilled; 103 % recovery | |||||
162-987D | Drilling/drill rig | DRILL | 1995-08-24T21:45:00 | 70.49670 | -17.93640 | -1673 | 1995-08-26T22:50:00 | 42 cores; 373 m cored; 0 m drilled; 72 % recovery | |||||
162-987E | Drilling/drill rig | DRILL | 1995-08-26T22:50:00 | 70.49640 | -17.93640 | -1628 | 1995-09-01T12:15:00 | 52 cores; 496.1 m cored; 0 m drilled; 62.2 % recovery |