Event List of Leg161
Download as tab-delimited text
Event label | Optional label | Method/Device | Abbreviation | O2A Registry URI | Date/Time | Latitude | Longitude | Elevation | Date/Time end | Latitude end | Longitude end | Elevation end | Comment |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
161-974 | Composite Core | COMPCORE | 1995-05-07T00:00:00 | 40.35595 | 12.14208 | -3466 | 1995-05-11T00:00:00 | 63 cores; 580.7 m cored; 0 m drilled; 101.3% recovery | |||||
161-974A | Drilling/drill rig | DRILL | 1995-05-07T03:45:00 | 40.35610 | 12.14195 | -3470 | 1995-05-07T17:00:00 | 1 core; 9.5 m cored; 0 m drilled; 103.3 % recovery | |||||
161-974B | Drilling/drill rig | DRILL | 1995-05-07T17:00:00 | 40.35610 | 12.14195 | -3465 | 1995-05-08T23:45:00 | 22 cores; 203.7 m cored; 0 m drilled; 102.2 % recovery | |||||
161-974C | Drilling/drill rig | DRILL | 1995-05-08T23:45:00 | 40.35580 | 12.14221 | -3464 | 1995-05-10T21:00:00 | 22 cores; 204.5 m cored; 0 m drilled; 97.7 % recovery | |||||
161-974D | Drilling/drill rig | DRILL | 1995-05-10T21:00:00 | 40.35580 | 12.14221 | -3465 | 1995-05-11T19:30:00 | 18 cores; 163 m cored; 0 m drilled; 104.6 % recovery | |||||
161-975 | Composite Core | COMPCORE | 1995-05-14T00:00:00 | 38.89663 | 4.50988 | -2415.8 | 1995-08-19T00:00:00 | 85 cores; 790.2 m cored; 0 m drilled; 97.9% recovery | |||||
161-975A | Drilling/drill rig | DRILL | 1995-05-14T01:00:00 | 38.89670 | 4.50971 | -2417 | 1995-05-14T07:30:00 | 1 core; 9.5 m cored; 0 m drilled; 104.4 % recovery | |||||
161-975B | Drilling/drill rig | DRILL | 1995-05-14T07:30:00 | 38.89640 | 4.50993 | -2416 | 1995-05-16T01:45:00 | 34 cores; 317.1 m cored; 0 m drilled; 94.3 % recovery | |||||
161-975C | Drilling/drill rig | DRILL | 1995-05-16T01:45:00 | 38.89670 | 4.50993 | -2415 | 1995-05-18T10:15:00 | 34 cores; 313.7 m cored; 0 m drilled; 98.1 % recovery | |||||
161-975D | Drilling/drill rig | DRILL | 1995-05-18T10:15:00 | 38.89670 | 4.50993 | -2415 | 1995-05-19T03:30:00 | 16 cores; 149.9 m cored; 0 m drilled; 104.8 % recovery | |||||
161-976 | Composite Core | COMPCORE | 1995-05-21T00:00:00 | 36.20537 | -4.31267 | -1108 | 1995-06-08T00:00:00 | 179 cores; 1536.8 m cored; 0 m drilled; 63.6% recovery | |||||
161-976A | Drilling/drill rig | DRILL | 1995-05-21T01:00:00 | 36.20530 | -4.31333 | -1108 | 1995-05-21T09:00:00 | 1 core; 5.9 m cored; 0 m drilled; 100.3 % recovery | |||||
161-976B | Drilling/drill rig | DRILL | 1995-05-21T09:00:00 | 36.20530 | -4.31278 | -1108 | 1995-06-01T12:45:00 | 106 cores; 928.7 m cored; 0 m drilled; 57.7 % recovery | |||||
161-976C | Drilling/drill rig | DRILL | 1995-06-01T12:45:00 | 36.20530 | -4.31221 | -1108 | 1995-06-03T11:45:00 | 40 cores; 379.7 m cored; 0 m drilled; 89.6 % recovery | |||||
161-976D | Drilling/drill rig | DRILL | 1995-06-03T11:45:00 | 36.20560 | -4.31250 | -1108 | 1995-06-03T16:45:00 | 4 cores; 30 m cored; 0 m drilled; 102.6 % recovery | |||||
161-976E | Drilling/drill rig | DRILL | 1995-06-03T16:45:00 | 36.20530 | -4.31250 | -1108 | 1995-06-08T08:00:00 | 28 cores; 192.5 m cored; 0 m drilled; 33.7 % recovery | |||||
161-977 | Composite Core | COMPCORE | 1995-06-08T00:00:00 | 36.03170 | -1.95528 | -1984 | 1995-06-15T00:00:00 | 63 cores; 598.5 m cored; 0 m drilled; 91.1% recovery | |||||
161-977A | Drilling/drill rig | DRILL | 1995-06-08T23:15:00 | 36.03170 | -1.95528 | -1984 | 1995-06-15T14:30:00 | 63 cores; 598.5 m cored; 0 m drilled; 91.1 % recovery | |||||
161-978 | Composite Core | COMPCORE | 1995-06-15T00:00:00 | 36.23110 | -2.05695 | -1929 | 1995-06-21T00:00:00 | 53 cores; 504.2 m cored; 0 m drilled; 80.7% recovery | |||||
161-978A | Drilling/drill rig | DRILL | 1995-06-15T16:00:00 | 36.23110 | -2.05695 | -1929 | 1995-06-21T02:30:00 | 53 cores; 504.2 m cored; 0 m drilled; 80.7 % recovery | |||||
161-979 | Composite Core | COMPCORE | 1995-06-21T00:00:00 | 35.72390 | -3.20583 | -1074 | 1995-06-25T00:00:00 | 62 cores; 580.9 m cored; 0 m drilled; 100.4% recovery | |||||
161-979A | Drilling/drill rig | DRILL | 1995-06-21T07:45:00 | 35.72390 | -3.20583 | -1074 | 1995-06-25T07:15:00 | 62 cores; 580.9 m cored; 0 m drilled; 100.4 % recovery |