Event List of Leg160
Download as tab-delimited text
Event label | Optional label | Method/Device | Abbreviation | O2A Registry URI | Date/Time | Latitude | Longitude | Elevation | Date/Time end | Latitude end | Longitude end | Elevation end | Comment |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
160-963 | Composite Core | COMPCORE | 1995-03-14T00:00:00 | 37.03400 | 13.17982 | -469.8 | 1995-03-16T00:00:00 | 56 cores; 471.8 m cored; 0 m drilled; 100.8% recovery | |||||
160-963A | Drilling/drill rig | DRILL | 1995-03-14T21:50:00 | 37.03220 | 13.18160 | -471 | 1995-03-15T21:54:00 | 25 cores; 199.4 m cored; 0 m drilled; 101.8 % recovery | |||||
160-963B | Drilling/drill rig | DRILL | 1995-03-15T21:54:00 | 37.03330 | 13.18050 | -470 | 1995-03-16T12:31:00 | 24 cores; 207 m cored; 0 m drilled; 99.6 % recovery | |||||
160-963C | Drilling/drill rig | DRILL | 1995-03-16T12:31:00 | 37.03470 | 13.17910 | -469 | 1994-03-16T00:00:00 | 6 cores; 57 m cored; 0 m drilled; 101.6 % recovery | |||||
160-963D | Drilling/drill rig | DRILL | 1995-03-16T17:05:00 | 37.03580 | 13.17810 | -469 | 1995-03-16T22:00:00 | 1 core; 8.4 m cored; 0 m drilled; 99.9 % recovery | |||||
160-964 | Composite Core | COMPCORE | 1995-03-17T00:00:00 | 36.26053 | 17.75043 | -3659 | 1995-03-21T00:00:00 | 55 cores; 498.6 m cored; 0 m drilled; 102.8% recovery | |||||
160-964A | Drilling/drill rig | DRILL | 1995-03-17T20:14:00 | 36.26030 | 17.74970 | -3658 | 1995-03-18T21:30:00 | 11 core; 101.8 m cored; 0 m drilled; 104.2 % recovery | |||||
160-964B | Drilling/drill rig | DRILL | 1995-03-18T21:30:00 | 36.26030 | 17.75250 | -3658 | 1995-03-19T10:30:00 | 11 core; 102 m cored; 0 m drilled; 103.2 % recovery | |||||
160-964C | Drilling/drill rig | DRILL | 1995-03-19T10:30:00 | 36.26060 | 17.75010 | -3660 | 1995-03-20T02:00:00 | 12 cores; 105.1 m cored; 0 m drilled; 101.3 % recovery | |||||
160-964D | Drilling/drill rig | DRILL | 1995-03-20T02:00:00 | 36.26060 | 17.75000 | -3660 | 1995-03-20T16:45:00 | 12 cores; 108.6 m cored; 0 m drilled; 103.3 % recovery | |||||
160-964E | Drilling/drill rig | DRILL | 1995-03-20T16:45:00 | 36.26080 | 17.75000 | -3661 | 1995-03-21T00:45:00 | 6 cores; 53 m cored; 0 m drilled; 102.5 % recovery | |||||
160-964F | Drilling/drill rig | DRILL | 1995-03-21T00:45:00 | 36.26060 | 17.75030 | -3657 | 1995-03-21T12:24:00 | 3 cores; 28.1 m cored; 0 m drilled; 99.4 % recovery | |||||
160-965 | Composite Core | COMPCORE | 1995-03-24T00:00:00 | 33.91800 | 32.71310 | -1507 | 1995-03-27T00:00:00 | 27 cores; 250.4 m cored; 0 m drilled; 17.1% recovery | |||||
160-965A | Drilling/drill rig | DRILL | 1995-03-24T18:28:00 | 33.91800 | 32.71310 | -1507 | 1995-03-27T04:25:00 | 27 cores; 250.4 m cored; 0 m drilled; 17.1 % recovery | |||||
160-966 | Composite Core | COMPCORE | 1995-03-27T00:00:00 | 33.79658 | 32.70127 | -925.8 | 1995-04-01T00:00:00 | 98 cores; 821.8 m cored; 0 m drilled; 55% recovery | |||||
160-966A | Drilling/drill rig | DRILL | 1995-03-27T05:58:00 | 33.79670 | 32.70160 | -927 | 1995-03-27T21:46:00 | 13 cores; 106.8 m cored; 0 m drilled; 68.5 % recovery | |||||
160-966B | Drilling/drill rig | DRILL | 1995-03-27T21:46:00 | 33.79610 | 32.70140 | -927 | 1995-03-28T13:12:00 | 16 cores; 146 m cored; 0 m drilled; 66.1 % recovery | |||||
160-966C | Drilling/drill rig | DRILL | 1995-03-28T13:12:00 | 33.79640 | 32.70140 | -926 | 1995-03-29T03:20:00 | 17 cores; 127 m cored; 0 m drilled; 80 % recovery | |||||
160-966D | Drilling/drill rig | DRILL | 1995-03-29T03:20:00 | 33.79640 | 32.70080 | -926 | 1995-03-29T18:38:00 | 20 cores; 136.5 m cored; 0 m drilled; 77.6 % recovery | |||||
160-966E | Drilling/drill rig | DRILL | 1995-03-29T18:38:00 | 33.79640 | 32.70080 | -926 | 1995-03-29T23:45:00 | 1 core; 8.5 m cored; 0 m drilled; 99.8 % recovery | |||||
160-966F | Drilling/drill rig | DRILL | 1995-03-29T23:45:00 | 33.79750 | 32.70160 | -923 | 1995-04-01T09:55:00 | 31 core; 297 m cored; 0 m drilled; 22.2 % recovery | |||||
160-967 | Composite Core | COMPCORE | 1995-04-01T00:00:00 | 34.06960 | 32.72543 | -2553.2 | 1995-04-03T00:00:00 | 97 cores; 891.3 m cored; 0 m drilled; 54.7% recovery | |||||
160-967A | Drilling/drill rig | DRILL | 1995-04-01T23:50:00 | 34.06830 | 32.72530 | -2553 | 1995-04-02T11:40:00 | 16 cores; 141.3 m cored; 0 m drilled; 100.6 % recovery | |||||
160-967B | Drilling/drill rig | DRILL | 1995-04-02T11:40:00 | 34.06830 | 32.72530 | -2555 | 1995-04-03T00:40:00 | 14 cores; 121.5 m cored; 0 m drilled; 104.2 % recovery | |||||
160-967C | Drilling/drill rig | DRILL | 1995-04-03T00:40:00 | 34.07110 | 32.72560 | -2553 | 1995-04-03T11:50:00 | 13 cores; 114.4 m cored; 0 m drilled; 104.5 % recovery | |||||
160-967F | Drilling/drill rig | DRILL | 1995-04-03T11:50:00 | 34.07080 | 32.72550 | -2553 | 1995-04-03T13:50:00 | 1 core; 9.5 m cored; 0 m drilled; 103.9 % recovery | |||||
160-967D | Drilling/drill rig | DRILL | 1995-04-03T13:50:00 | 34.07080 | 32.72560 | -2552 | 1995-04-03T21:15:00 | 2 cores; 16.2 m cored; 0 m drilled; 104.3 % recovery | |||||
160-967E | Drilling/drill rig | DRILL | 1995-04-03T21:15:00 | 34.06830 | 32.72530 | -2553 | 1995-04-09T10:40:00 | 51 core; 488.4 m cored; 0 m drilled; 14.8 % recovery | |||||
160-968 | Composite Core | COMPCORE | 1995-04-09T00:00:00 | 34.33217 | 32.75193 | -1962.7 | 1995-04-13T00:00:00 | 38 cores; 333 m cored; 0 m drilled; 81.9% recovery | |||||
160-968A | Drilling/drill rig | DRILL | 1995-04-09T12:13:00 | 34.33170 | 32.75110 | -1961 | 1995-04-12T16:30:00 | 34 cores; 302.7 m cored; 0 m drilled; 79.8 % recovery | |||||
160-968B | Drilling/drill rig | DRILL | 1995-04-12T16:30:00 | 34.33200 | 32.75110 | -1963 | 1995-04-12T19:15:00 | 2 cores; 14.9 m cored; 0 m drilled; 103.7 % recovery | |||||
160-968C | Drilling/drill rig | DRILL | 1995-04-12T19:15:00 | 34.33280 | 32.75360 | -1964 | 1995-04-13T02:15:00 | 2 cores; 15.4 m cored; 0 m drilled; 102.3 % recovery | |||||
160-969 | Composite Core | COMPCORE | 1995-04-14T00:00:00 | 33.84013 | 24.88333 | -2198.3 | 1995-04-16T00:00:00 | 51 cores; 448.8 m cored; 0 m drilled; 102.4% recovery | |||||
160-969A | Drilling/drill rig | DRILL | 1995-04-14T13:00:00 | 33.84000 | 24.88450 | -2200 | 1995-04-15T05:15:00 | 13 cores; 108.3 m cored; 0 m drilled; 102.9 % recovery | |||||
160-969B | Drilling/drill rig | DRILL | 1995-04-15T05:15:00 | 33.84110 | 24.88310 | -2202 | 1995-04-15T15:40:00 | 11 core; 97.9 m cored; 0 m drilled; 102.3 % recovery | |||||
160-969C | Drilling/drill rig | DRILL | 1995-04-15T15:40:00 | 33.83860 | 24.88330 | -2196 | 1995-04-15T17:45:00 | 1 core; 9.5 m cored; 0 m drilled; 105.1 % recovery | |||||
160-969D | Drilling/drill rig | DRILL | 1995-04-15T17:45:00 | 33.83860 | 24.88330 | -2192 | 1995-04-16T05:55:00 | 13 cores; 116.2 m cored; 0 m drilled; 102 % recovery | |||||
160-969F | Drilling/drill rig | DRILL | 1995-04-16T15:20:00 | 33.84140 | 24.88270 | -2199 | 1995-04-16T23:06:00 | 2 cores; 19 m cored; 0 m drilled; 102.4 % recovery | |||||
160-969E | Drilling/drill rig | DRILL | 1995-04-16T17:55:00 | 33.84110 | 24.88310 | -2201 | 1995-04-16T15:20:00 | 11 core; 97.9 m cored; 0 m drilled; 102.4 % recovery | |||||
160-970 | Composite Core | COMPCORE | 1995-04-17T00:00:00 | 33.73580 | 24.79545 | -2036.2 | 1995-04-20T00:00:00 | 37 cores; 327.3 m cored; 0 m drilled; 49% recovery | |||||
160-970A | Drilling/drill rig | DRILL | 1995-04-17T06:30:00 | 33.73670 | 24.80200 | -2076 | 1995-04-19T09:00:00 | 22 cores; 201.4 m cored; 0 m drilled; 25.1 % recovery | |||||
160-970B | Drilling/drill rig | DRILL | 1995-04-19T09:00:00 | 33.73700 | 24.81170 | -2079 | 1995-04-19T19:20:00 | 5 cores; 47.5 m cored; 0 m drilled; 102.5 % recovery | |||||
160-970C | Drilling/drill rig | DRILL | 1995-04-19T19:20:00 | 33.73560 | 24.79110 | -2037 | 1995-04-20T03:50:00 | 5 cores; 35.6 m cored; 0 m drilled; 47.7 % recovery | |||||
160-971 | Composite Core | COMPCORE | 1995-04-20T00:00:00 | 33.71628 | 24.69708 | -2048.4 | 1995-04-24T00:00:00 | 44 cores; 400.6 m cored; 0 m drilled; 54.2% recovery | |||||
160-970D | Drilling/drill rig | DRILL | 1995-04-20T04:48:00 | 33.73390 | 24.77700 | -1953 | 1995-04-20T10:10:00 | 5 cores; 42.8 m cored; 0 m drilled; 103.2 % recovery | |||||
160-971A | Drilling/drill rig | DRILL | 1995-04-20T14:01:00 | 33.70330 | 24.71360 | -2038 | 1995-04-21T06:35:00 | 12 cores; 105.9 m cored; 0 m drilled; 55.5 % recovery | |||||
160-971B | Drilling/drill rig | DRILL | 1995-04-21T06:35:00 | 33.71360 | 24.70170 | -2152 | 1995-04-23T15:33:00 | 22 cores; 203.5 m cored; 0 m drilled; 31.5 % recovery | |||||
160-971C | Drilling/drill rig | DRILL | 1995-04-23T15:33:00 | 33.71360 | 24.70170 | -2152 | 1995-04-23T17:43:00 | 2 cores; 16.7 m cored; 0 m drilled; 103.3 % recovery | |||||
160-971D | Drilling/drill rig | DRILL | 1995-04-23T17:43:00 | 33.72390 | 24.68780 | -1945 | 1995-04-24T02:40:00 | 5 cores; 46 m cored; 0 m drilled; 103.3 % recovery | |||||
160-971E | Drilling/drill rig | DRILL | 1995-04-24T03:47:00 | 33.72700 | 24.68060 | -1955 | 1995-04-24T12:48:00 | 3 cores; 28.5 m cored; 0 m drilled; 103.6 % recovery | |||||
160-972 | Composite Core | COMPCORE | 1995-04-25T00:00:00 | 35.78000 | 18.72530 | -3931 | 1995-04-26T00:00:00 | 10 cores; 95.4 m cored; 0 m drilled; 98.1% recovery | |||||
160-972A | Drilling/drill rig | DRILL | 1995-04-25T17:02:00 | 35.78000 | 18.72530 | -3931 | 1995-04-26T16:02:00 | 10 cores; 95.4 m cored; 0 m drilled; 98.1 % recovery | |||||
160-972B | Drilling/drill rig | DRILL | 1995-04-26T00:00:00 | 35.79670 | 18.72540 | -3930.6 | 1995-04-26T00:00:00 | 0 cores; 0 m cored; 60.1 m drilled | |||||
160-973 | Composite Core | COMPCORE | 1995-04-27T00:00:00 | 35.78030 | 18.94818 | -3695.4 | 1995-05-01T00:00:00 | 30 cores; 261.5 m cored; 0 m drilled; 72.7% recovery | |||||
160-973B | Drilling/drill rig | DRILL | 1995-04-27T09:45:00 | 35.78030 | 18.94810 | -3699 | 1995-04-27T15:00:00 | 1 core; 9.5 m cored; 0 m drilled; 101.3 % recovery | |||||
160-973A | Drilling/drill rig | DRILL | 1995-04-27T15:00:00 | 35.78030 | 18.94830 | -3695 | 1995-04-29T11:30:00 | 17 cores; 148.5 m cored; 0 m drilled; 58.4 % recovery | |||||
160-973C | Drilling/drill rig | DRILL | 1995-04-29T11:30:00 | 35.78030 | 18.94810 | -3695 | 1995-04-29T20:15:00 | 1 core; 9.5 m cored; 0 m drilled; 102.4 % recovery | |||||
160-973D | Drilling/drill rig | DRILL | 1995-04-29T20:15:00 | 35.78030 | 18.94830 | -3694 | 1995-05-01T01:55:00 | 9 cores; 75 m cored; 0 m drilled; 85.5 % recovery | |||||
160-973E | Drilling/drill rig | DRILL | 1995-05-01T01:55:00 | 35.78030 | 18.94810 | -3694 | 1995-05-01T15:00:00 | 2 cores; 19 m cored; 0 m drilled; 104.3 % recovery |