Event List of Leg159
Download as tab-delimited text
Event label | Optional label | Method/Device | Abbreviation | Sensor URI | Date/Time | Latitude | Longitude | Elevation | Date/Time end | Latitude end | Longitude end | Elevation end | Comment |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
159-959 | Composite Core | COMPCORE | 1995-01-09T00:00:00 | 3.62760 | -2.73547 | -2090.8 | 1995-01-24T00:00:00 | 170 cores; 1585.8 m cored; 0 m drilled; 79.8% recovery | |||||
159-959A | Drilling/drill rig | DRILL | 1995-01-09T16:30:00 | 3.62770 | -2.73520 | -2091 | 1995-01-12T12:15:00 | 52 cores; 480.7 m cored; 0 m drilled; 94.9 % recovery | |||||
159-959B | Drilling/drill rig | DRILL | 1995-01-12T12:15:00 | 3.62750 | -2.73555 | -2090 | 1995-01-13T03:15:00 | 20 cores; 184.4 m cored; 0 m drilled; 104.4 % recovery | |||||
159-959C | Drilling/drill rig | DRILL | 1995-01-13T03:15:00 | 3.62770 | -2.73528 | -2091 | 1995-01-14T00:00:00 | 20 cores; 179.6 m cored; 0 m drilled; 104.3 % recovery | |||||
159-959D | Drilling/drill rig | DRILL | 1995-01-14T00:00:00 | 3.62750 | -2.73583 | -2091 | 1995-01-24T05:30:00 | 78 cores; 741.1 m cored; 0 m drilled; 57.9 % recovery | |||||
159-960 | Composite Core | COMPCORE | 1995-01-24T00:00:00 | 3.58352 | -2.73328 | -2039 | 1995-02-04T00:00:00 | 88 cores; 688.6 m cored; 0 m drilled; 45.4% recovery | |||||
159-960A | Drilling/drill rig | DRILL | 1995-01-24T06:30:00 | 3.58305 | -2.73360 | -2048 | 1995-01-31T17:00:00 | 61 core; 451.2 m cored; 0 m drilled; 32.1 % recovery | |||||
159-960B | Drilling/drill rig | DRILL | 1995-01-31T17:00:00 | 3.58360 | -2.73310 | -2034 | 1995-12-31T22:55:00 | 1 core; 7.1 m cored; 0 m drilled; 100.7 % recovery | |||||
159-960C | Drilling/drill rig | DRILL | 1995-01-31T22:55:00 | 3.58388 | -2.73316 | -2035 | 1995-02-04T02:30:00 | 26 cores; 230.3 m cored; 0 m drilled; 69.8 % recovery | |||||
159-961 | Composite Core | COMPCORE | 1995-02-04T00:00:00 | 3.44250 | -3.05903 | -3292 | 1995-02-12T00:00:00 | 54 cores; 443.5 m cored; 0 m drilled; 26.4% recovery | |||||
159-961A | Drilling/drill rig | DRILL | 1995-02-04T10:15:00 | 3.44250 | -3.05861 | -3292 | 1995-02-07T23:30:00 | 35 cores; 308.7 m cored; 0 m drilled; 19.6 % recovery | |||||
159-961B | Drilling/drill rig | DRILL | 1995-02-07T23:30:00 | 3.44250 | -3.05945 | -3292 | 1995-02-12T07:15:00 | 19 cores; 134.8 m cored; 0 m drilled; 42.1 % recovery | |||||
159-962 | Composite Core | COMPCORE | 1995-02-12T00:00:00 | 3.25118 | -3.18202 | -4636.8 | 1995-02-22T00:00:00 | 55 cores; 460.5 m cored; 0 m drilled; 39.7% recovery | |||||
159-962A | Drilling/drill rig | DRILL | 1995-02-12T11:30:00 | 3.25138 | -3.18195 | -4637 | 1995-02-12T23:55:00 | 1 core; 3.7 m cored; 0 m drilled; 100.3 % recovery | |||||
159-962B | Drilling/drill rig | DRILL | 1995-02-12T23:55:00 | 3.25111 | -3.18195 | -4637 | 1995-02-14T07:30:00 | 13 cores; 100 m cored; 0 m drilled; 85.6 % recovery | |||||
159-962C | Drilling/drill rig | DRILL | 1995-02-14T07:30:00 | 3.25083 | -3.18250 | -4628 | 1995-02-15T13:00:00 | 4 cores; 40.4 m cored; 0 m drilled; 1.4 % recovery | |||||
159-962D | Drilling/drill rig | DRILL | 1995-02-15T13:00:00 | 3.25138 | -3.18166 | -4645 | 1995-02-22T07:30:00 | 37 cores; 316.4 m cored; 0 m drilled; 29.3 % recovery |