Event List of Leg155
Download as tab-delimited text
Event label | Optional label | Method/Device | Abbreviation | Sensor URI | Date/Time | Latitude | Longitude | Elevation | Date/Time end | Latitude end | Longitude end | Elevation end | Comment |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
155-930 | Composite Core | COMPCORE | 1994-04-01T00:00:00 | 5.01540 | -47.59570 | -3144 | 1994-04-04T00:00:00 | 49 cores; 458.9 m cored; 0 m drilled; 87.6% recovery | |||||
155-930A | Drilling/drill rig | DRILL | 1994-04-01T15:15:00 | 5.01490 | -47.59570 | -3144 | 1994-04-02T00:00:00 | 1 core; 9.5 m cored; 0 m drilled; 105.8 % recovery | |||||
155-930B | Drilling/drill rig | DRILL | 1994-04-02T00:00:00 | 5.01490 | -47.59570 | -3144 | 1994-04-03T08:32:00 | 24 cores; 225.3 m cored; 0 m drilled; 90.2 % recovery | |||||
155-930C | Drilling/drill rig | DRILL | 1994-04-03T08:32:00 | 5.01510 | -47.59570 | -3144 | 1994-04-04T06:06:00 | 18 cores; 172.6 m cored; 0 m drilled; 78.5 % recovery | |||||
155-930D | Drilling/drill rig | DRILL | 1994-04-04T06:06:00 | 5.01670 | -47.59570 | -3144 | 1994-04-04T19:25:00 | 6 cores; 51.5 m cored; 0 m drilled; 103.4 % recovery | |||||
155-931 | Composite Core | COMPCORE | 1994-04-05T00:00:00 | 5.14197 | -46.63303 | -3474.7 | 1994-04-10T00:00:00 | 55 cores; 507.5 m cored; 0 m drilled; 76.3% recovery | |||||
155-931A | Drilling/drill rig | DRILL | 1994-04-05T12:03:00 | 5.14180 | -46.63300 | -3473 | 1994-04-05T23:10:00 | 6 cores; 53.6 m cored; 0 m drilled; 106.3 % recovery | |||||
155-931B | Drilling/drill rig | DRILL | 1994-04-05T23:10:00 | 5.14200 | -46.63300 | -3476 | 1994-04-10T02:35:00 | 45 cores; 421.3 m cored; 0 m drilled; 70.3 % recovery | |||||
155-931C | Drilling/drill rig | DRILL | 1994-04-10T02:35:00 | 5.14210 | -46.63310 | -3475 | 1994-04-10T14:25:00 | 4 cores; 32.6 m cored; 0 m drilled; 105.6 % recovery | |||||
155-932 | Composite Core | COMPCORE | 1994-04-11T00:00:00 | 5.21140 | -47.02950 | -3335 | 1994-04-12T00:00:00 | 24 cores; 220.8 m cored; 0 m drilled; 94.6% recovery | |||||
155-932A | Drilling/drill rig | DRILL | 1994-04-11T01:31:00 | 5.21130 | -47.02950 | -3334 | 1994-04-12T04:25:00 | 18 cores; 168.3 m cored; 0 m drilled; 91.9 % recovery | |||||
155-933 | Composite Core | COMPCORE | 1994-04-12T00:00:00 | 5.09660 | -46.81230 | -3366 | 1994-04-15T00:00:00 | 27 cores; 254.2 m cored; 0 m drilled; 69.8% recovery | |||||
155-932B | Drilling/drill rig | DRILL | 1994-04-12T04:25:00 | 5.21150 | -47.02950 | -3336 | 1994-04-12T16:40:00 | 6 cores; 52.5 m cored; 0 m drilled; 103 % recovery | |||||
155-933A | Drilling/drill rig | DRILL | 1994-04-12T19:04:00 | 5.09660 | -46.81230 | -3366 | 1994-04-15T13:10:00 | 27 cores; 254.2 m cored; 0 m drilled; 69.8 % recovery | |||||
155-934 | Composite Core | COMPCORE | 1994-04-15T00:00:00 | 5.48385 | -47.68095 | -3421.5 | 1994-04-17T00:00:00 | 24 cores; 217.6 m cored; 0 m drilled; 100% recovery | |||||
155-934A | Drilling/drill rig | DRILL | 1994-04-15T23:21:00 | 5.48410 | -47.68090 | -3422 | 1994-04-16T18:10:00 | 12 cores; 108.8 m cored; 0 m drilled; 102.6 % recovery | |||||
155-934B | Drilling/drill rig | DRILL | 1994-04-16T18:10:00 | 5.48360 | -47.68100 | -3421 | 1994-04-17T17:50:00 | 12 cores; 108.8 m cored; 0 m drilled; 97.4 % recovery | |||||
155-935 | Composite Core | COMPCORE | 1994-04-18T00:00:00 | 5.42680 | -47.56480 | -3486 | 1994-04-22T00:00:00 | 40 cores; 372 m cored; 0 m drilled; 72.2% recovery | |||||
155-935A | Drilling/drill rig | DRILL | 1994-04-18T03:45:00 | 5.42680 | -47.56480 | -3486 | 1994-04-22T08:55:00 | 40 cores; 372 m cored; 0 m drilled; 72.2 % recovery | |||||
155-936 | Composite Core | COMPCORE | 1994-04-22T00:00:00 | 5.63220 | -47.73560 | -3575 | 1994-04-27T00:00:00 | 46 cores; 433.8 m cored; 0 m drilled; 63.3% recovery | |||||
155-936A | Drilling/drill rig | DRILL | 1994-04-22T14:01:00 | 5.63220 | -47.73560 | -3575 | 1994-04-27T01:35:00 | 46 cores; 433.8 m cored; 0 m drilled; 63.3 % recovery | |||||
155-937 | Composite Core | COMPCORE | 1994-04-27T00:00:00 | 4.59595 | -47.20740 | -2758.2 | 1994-04-28T00:00:00 | 31 cores; 273.7 m cored; 0 m drilled; 94.2% recovery | |||||
155-937A | Drilling/drill rig | DRILL | 1994-04-27T11:07:00 | 4.59580 | -47.20740 | -2760 | 1994-04-27T16:45:00 | 1 core; 0.2 m cored; 0 m drilled; 105 % recovery | |||||
155-937B | Drilling/drill rig | DRILL | 1994-04-27T16:45:00 | 4.59580 | -47.20740 | -2760 | 1994-04-28T11:35:00 | 19 cores; 180.3 m cored; 0 m drilled; 88.6 % recovery | |||||
155-937C | Drilling/drill rig | DRILL | 1994-04-28T11:35:00 | 4.59600 | -47.20740 | -2756 | 1994-04-28T19:15:00 | 9 cores; 76.5 m cored; 0 m drilled; 105.3 % recovery | |||||
155-937D | Drilling/drill rig | DRILL | 1994-04-28T19:15:00 | 4.59620 | -47.20740 | -2757 | 1994-04-28T20:45:00 | 2 cores; 16.7 m cored; 0 m drilled; 103.4 % recovery | |||||
155-938 | Composite Core | COMPCORE | 1994-04-29T00:00:00 | 4.65840 | -47.31235 | -2765 | 1994-05-01T00:00:00 | 43 cores; 391.5 m cored; 0 m drilled; 82.2% recovery | |||||
155-938A | Drilling/drill rig | DRILL | 1994-04-29T03:30:00 | 4.65840 | -47.31230 | -2815 | 1994-04-30T18:10:00 | 34 cores; 310.2 m cored; 0 m drilled; 78.1 % recovery | |||||
155-938B | Drilling/drill rig | DRILL | 1994-04-30T18:10:00 | 4.65840 | -47.31240 | -2715 | 1994-05-01T06:50:00 | 9 cores; 81.3 m cored; 0 m drilled; 97.8 % recovery | |||||
155-939 | Composite Core | COMPCORE | 1994-05-01T00:00:00 | 4.72173 | -47.50043 | -2800.3 | 1994-05-02T00:00:00 | 26 cores; 238.2 m cored; 0 m drilled; 98.3% recovery | |||||
155-939A | Drilling/drill rig | DRILL | 1994-05-01T09:21:00 | 4.72180 | -47.50330 | -2795 | 1994-05-02T00:00:00 | 11 core; 102.7 m cored; 0 m drilled; 95 % recovery | |||||
155-939B | Drilling/drill rig | DRILL | 1994-05-02T00:00:00 | 4.72170 | -47.49900 | -2804 | 1994-05-02T12:25:00 | 11 core; 99.4 m cored; 0 m drilled; 100.1 % recovery | |||||
155-939C | Drilling/drill rig | DRILL | 1994-05-02T12:25:00 | 4.72170 | -47.49900 | -2802 | 1994-05-02T20:55:00 | 4 cores; 36.1 m cored; 0 m drilled; 102.4 % recovery | |||||
155-940 | Composite Core | COMPCORE | 1994-05-03T00:00:00 | 5.14320 | -47.52880 | -3203 | 1994-05-05T00:00:00 | 27 cores; 248.6 m cored; 0 m drilled; 84.1% recovery | |||||
155-940A | Drilling/drill rig | DRILL | 1994-05-03T01:14:00 | 5.14320 | -47.52880 | -3203 | 1994-05-05T19:55:00 | 27 cores; 248.6 m cored; 0 m drilled; 84.1 % recovery | |||||
155-941 | Composite Core | COMPCORE | 1994-05-06T00:00:00 | 5.37300 | -48.02880 | -3390.5 | 1994-05-08T00:00:00 | 31 cores; 262.8 m cored; 0 m drilled; 83.3% recovery | |||||
155-941A | Drilling/drill rig | DRILL | 1994-05-06T02:20:00 | 5.37300 | -48.02880 | -3392 | 1994-05-07T23:50:00 | 19 cores; 177.7 m cored; 0 m drilled; 69.1 % recovery | |||||
155-941B | Drilling/drill rig | DRILL | 1994-05-07T23:50:00 | 5.37300 | -48.02880 | -3389 | 1994-05-08T21:55:00 | 12 cores; 85.1 m cored; 0 m drilled; 113 % recovery | |||||
155-942 | Composite Core | COMPCORE | 1994-05-09T00:00:00 | 5.74250 | -49.09093 | -3354.3 | 1994-05-11T00:00:00 | 33 cores; 293.9 m cored; 0 m drilled; 86.3% recovery | |||||
155-942A | Drilling/drill rig | DRILL | 1994-05-09T07:25:00 | 5.74250 | -49.09080 | -3346 | 1994-05-10T12:50:00 | 20 cores; 177.6 m cored; 0 m drilled; 85.9 % recovery | |||||
155-942B | Drilling/drill rig | DRILL | 1994-05-10T12:50:00 | 5.74260 | -49.09100 | -3357 | 1994-05-10T19:25:00 | 8 cores; 74 m cored; 0 m drilled; 76.9 % recovery | |||||
155-942C | Drilling/drill rig | DRILL | 1994-05-10T19:25:00 | 5.74240 | -49.09100 | -3360 | 1994-05-11T07:23:00 | 5 cores; 42.3 m cored; 0 m drilled; 104.1 % recovery | |||||
155-943A | Drilling/drill rig | DRILL | 1994-05-11T17:56:00 | 5.94680 | -47.78050 | -3739 | 1994-05-12T18:35:00 | 12 cores; 106.3 m cored; 0 m drilled; 62.5 % recovery | |||||
155-944 | Composite Core | COMPCORE | 1994-05-12T00:00:00 | 5.93925 | -47.75725 | -3715.8 | 1994-05-17T00:00:00 | 53 cores; 486.2 m cored; 0 m drilled; 63.3% recovery | |||||
155-943 | Composite Core | COMPCORE | 1994-05-12T00:00:00 | 5.94680 | -47.78050 | -3739 | 1994-05-12T00:00:00 | 12 cores; 106.3 m cored; 0 m drilled; 62.5% recovery | |||||
155-944A | Drilling/drill rig | DRILL | 1994-05-12T22:00:00 | 5.93890 | -47.75780 | -3713 | 1994-05-16T08:24:00 | 41 core; 384.2 m cored; 0 m drilled; 54.1 % recovery | |||||
155-944B | Drilling/drill rig | DRILL | 1994-05-16T08:24:00 | 5.93760 | -47.76010 | -3708 | 1994-05-16T15:45:00 | 6 cores; 47.8 m cored; 0 m drilled; 97.9 % recovery | |||||
155-944C | Drilling/drill rig | DRILL | 1994-05-16T15:45:00 | 5.94020 | -47.75560 | -3722 | 1994-05-16T19:00:00 | 1 core; 9.6 m cored; 0 m drilled; 100 % recovery | |||||
155-944D | Drilling/drill rig | DRILL | 1994-05-16T19:00:00 | 5.93580 | -47.75550 | -3720 | 1994-05-17T08:23:00 | 5 cores; 44.6 m cored; 0 m drilled; 97.2 % recovery | |||||
155-945 | Composite Core | COMPCORE | 1994-05-17T00:00:00 | 6.95030 | -47.92880 | -4148 | 1994-05-18T00:00:00 | 8 cores; 75.5 m cored; 0 m drilled; 99% recovery | |||||
155-945A | Drilling/drill rig | DRILL | 1994-05-17T16:05:00 | 6.95030 | -47.92880 | -4148 | 1994-05-18T08:23:00 | 8 cores; 75.5 m cored; 0 m drilled; 99 % recovery | |||||
155-946 | Composite Core | COMPCORE | 1994-05-18T00:00:00 | 6.94960 | -47.91930 | -4100 | 1994-05-21T00:00:00 | 29 cores; 275 m cored; 0 m drilled; 62.6% recovery | |||||
155-946A | Drilling/drill rig | DRILL | 1994-05-18T10:24:00 | 6.94960 | -47.91930 | -4100 | 1994-05-21T02:42:00 | 29 cores; 275 m cored; 0 m drilled; 62.6 % recovery |