Event List of Leg152
Download as tab-delimited text
Event label | Optional label | Method/Device | Abbreviation | Sensor URI | Date/Time | Latitude | Longitude | Elevation | Date/Time end | Latitude end | Longitude end | Elevation end | Comment |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
152-914 | Composite Core | COMPCORE | 1993-09-30T00:00:00 | 63.46228 | -39.72468 | -536.7 | 1993-10-05T00:00:00 | 21 cores; 169.8 m cored; 224 m drilled; 17.5% recovery | |||||
152-914A | Drilling/drill rig | DRILL | 1993-09-30T09:00:00 | 63.46230 | -39.72480 | -533 | 1993-09-30T21:59:00 | 4 cores; 18.6 m cored; 0 m drilled; 63.9 % recovery | |||||
152-914B | Drilling/drill rig | DRILL | 1993-09-30T21:59:00 | 63.46230 | -39.72470 | -533 | 1993-10-03T14:45:00 | 17 cores; 151.2 m cored; 0 m drilled; 11.8 % recovery | |||||
152-914C | Drilling/drill rig | DRILL | 1993-10-03T18:45:00 | 63.46225 | -39.72456 | -544 | 1993-10-05T00:30:00 | 0 cores; 0 m cored; 224 m drilled | |||||
152-915 | Composite Core | COMPCORE | 1993-10-05T00:00:00 | 63.47140 | -39.78180 | -533 | 1993-10-07T00:00:00 | 26 cores; 209.4 m cored; 0 m drilled; 15.7% recovery | |||||
152-915A | Drilling/drill rig | DRILL | 1993-10-05T02:15:00 | 63.47140 | -39.78180 | -533 | 1993-10-07T14:15:00 | 26 cores; 209.4 m cored; 0 m drilled; 15.7 % recovery | |||||
152-916 | Composite Core | COMPCORE | 1993-10-07T00:00:00 | 63.48560 | -39.80670 | -512 | 1993-10-09T00:00:00 | 15 cores; 101.7 m cored; 0 m drilled; 16.6% recovery | |||||
152-916A | Drilling/drill rig | DRILL | 1993-10-07T17:29:00 | 63.48560 | -39.80670 | -512 | 1993-10-09T23:29:00 | 15 cores; 101.7 m cored; 0 m drilled; 16.6 % recovery | |||||
152-917 | Composite Core | COMPCORE | 1993-10-10T00:00:00 | 63.49170 | -39.82780 | -508 | 1993-10-26T00:00:00 | 110 cores; 874.9 m cored; 0 m drilled; 52% recovery | |||||
152-917A | Drilling/drill rig | DRILL | 1993-10-10T02:00:00 | 63.49170 | -39.82780 | -508 | 1993-10-26T00:59:00 | 110 cores; 874.9 m cored; 0 m drilled; 52 % recovery | |||||
152-918 | Composite Core | COMPCORE | 1993-10-26T00:00:00 | 63.09285 | -38.63890 | -1868.5 | 1993-11-12T00:00:00 | 156 cores; 1380.9 m cored; 0 m drilled; 39.8% recovery | |||||
152-918A | Drilling/drill rig | DRILL | 1993-10-26T11:29:00 | 63.92613 | -38.63890 | -1869 | 1993-10-28T07:15:00 | 38 cores; 332.7 m cored; 0 m drilled; 78.2 % recovery | |||||
152-918B | Drilling/drill rig | DRILL | 1993-10-28T07:15:00 | 63.09280 | -38.63900 | -1868 | 1993-10-28T12:00:00 | 3 cores; 25.8 m cored; 0 m drilled; 98.8 % recovery | |||||
152-918C | Drilling/drill rig | DRILL | 1993-10-28T15:00:00 | 63.09290 | -38.63880 | -1868 | 1993-10-28T21:30:00 | 2 cores; 9.6 m cored; 0 m drilled; 100.4 % recovery | |||||
152-918D | Drilling/drill rig | DRILL | 1993-10-28T21:30:00 | 63.09290 | -38.63890 | -1868 | 1993-11-12T16:50:00 | 113 cores; 1012.8 m cored; 0 m drilled; 25.1 % recovery | |||||
152-919 | Composite Core | COMPCORE | 1993-11-13T00:00:00 | 62.66995 | -37.46028 | -2090.4 | 1993-11-15T00:00:00 | 18 cores; 169.2 m cored; 0 m drilled; 101% recovery | |||||
152-919A | Drilling/drill rig | DRILL | 1993-11-13T09:14:00 | 62.67000 | -37.46020 | -2088 | 1993-11-14T05:45:00 | 10 cores; 93.5 m cored; 0 m drilled; 100.1 % recovery | |||||
152-919B | Drilling/drill rig | DRILL | 1993-11-14T05:45:00 | 62.67000 | -37.46030 | -2086 | 1993-11-14T18:40:00 | 8 cores; 75.7 m cored; 0 m drilled; 102.1 % recovery | |||||
152-919C | Drilling/drill rig | DRILL | 1993-11-15T01:44:00 | 62.66986 | -37.46036 | -2097.3 | 1993-11-15T04:15:00 | 0 cores; 0 m cored; 0 m drilled |