Not logged in
PANGAEA.
Data Publisher for Earth & Environmental Science

Event List of Leg151

Download as tab-delimited text

Event labelOptional labelMethod/DeviceAbbreviationO2A Registry URIDate/TimeLatitudeLongitudeElevationDate/Time endLatitude endLongitude endElevation endComment
151-907Composite CoreCOMPCORE1993-08-05T00:00:0069.24980-12.69820-18121993-08-08T00:00:0026 cores; 224.1 m cored; 0 m drilled; 102.6% recovery. Longitude is in some reports 12°E, but has been corrected to negative (12°W) due to literature research and correlation of elevation with IBCAO database.
151-907ADrilling/drill rigDRILL1993-08-05T12:48:0069.24980-12.69820-18121993-08-08T03:53:0026 cores; 224.1 m cored; 0 m drilled; 102.6 % recovery. Longitude is in some reports 12°E, but has been corrected to negative (12°W) due to literature research and correlation of elevation with IBCAO database.
151-908Composite CoreCOMPCORE1993-08-12T00:00:0078.385301.36065-1284.51993-08-15T00:00:0047 cores; 428 m cored; 0 m drilled; 91.6% recovery
151-908ADrilling/drill rigDRILL1993-08-12T02:21:0078.385201.36060-12851993-08-15T03:41:0037 cores; 344.6 m cored; 0 m drilled; 91.1 % recovery
151-909Composite CoreCOMPCORE1993-08-15T00:00:0078.584603.07210-2529.71993-09-11T00:00:00130 cores; 1204.4 m cored; 0 m drilled; 69.7% recovery
151-908BDrilling/drill rigDRILL1993-08-15T03:41:0078.385401.36070-12841993-08-15T13:06:0010 cores; 83.4 m cored; 0 m drilled; 93.5 % recovery
151-909ADrilling/drill rigDRILL1993-08-15T17:30:0078.584403.07290-25301993-08-16T00:00:0011 core; 92.5 m cored; 0 m drilled; 102.5 % recovery
151-909BDrilling/drill rigDRILL1993-08-16T09:34:0078.584503.07300-25301993-08-17T02:13:0016 cores; 135.1 m cored; 0 m drilled; 103.9 % recovery
151-910Composite CoreCOMPCORE1993-08-17T00:00:0080.264706.59042-567.51993-08-30T00:00:0078 cores; 717.6 m cored; 0 m drilled; 60.8% recovery
151-910ADrilling/drill rigDRILL1993-08-17T15:30:0080.264706.59000-5671993-08-17T23:38:005 cores; 34 m cored; 0 m drilled; 71.4 % recovery
151-910BDrilling/drill rigDRILL1993-08-17T23:38:0080.264606.59080-5681993-08-18T03:32:002 cores; 15.6 m cored; 0 m drilled; 98.5 % recovery
151-910CDrilling/drill rigDRILL1993-08-18T03:32:0080.264906.59050-5671993-08-22T00:59:0053 cores; 507.4 m cored; 0 m drilled; 57.8 % recovery
151-911Composite CoreCOMPCORE1993-08-22T00:00:0080.474578.22730-912.31993-08-27T00:00:0083 cores; 745.8 m cored; 0 m drilled; 94.3% recovery
151-911ADrilling/drill rigDRILL1993-08-22T06:15:0080.477438.22730-9121993-08-26T21:34:0053 cores; 505.8 m cored; 0 m drilled; 91.8 % recovery
151-911BDrilling/drill rigDRILL1993-08-26T12:34:0080.474608.22730-9121993-08-26T19:30:0015 cores; 112.1 m cored; 0 m drilled; 100.7 % recovery
151-911CDrilling/drill rigDRILL1993-08-26T19:30:0080.474708.22730-9131993-08-27T07:47:0015 cores; 127.9 m cored; 0 m drilled; 98.6 % recovery
151-912Composite CoreCOMPCORE1993-08-27T00:00:0079.958935.45620-10491993-09-13T00:00:0033 cores; 301.5 m cored; 0 m drilled; 55.1% recovery
151-912ADrilling/drill rigDRILL1993-08-27T13:45:0079.959205.45600-10501993-08-28T09:37:0016 cores; 145.4 m cored; 0 m drilled; 81.4 % recovery
151-912BDrilling/drill rigDRILL1993-08-28T09:37:0079.958905.45660-10491993-08-28T20:17:005 cores; 40.5 m cored; 0 m drilled; 103.1 % recovery
151-910DDrilling/drill rigDRILL1993-08-28T23:10:0080.264606.59040-5681993-08-30T03:23:0018 cores; 160.6 m cored; 0 m drilled; 64.4 % recovery
151-909CDrilling/drill rigDRILL1993-08-31T12:01:0078.584903.07040-25291993-09-11T16:30:00103 cores; 976.8 m cored; 0 m drilled; 61.9 % recovery
151-913Composite CoreCOMPCORE1993-09-14T00:00:0075.48910-6.94695-33301993-09-20T00:00:0064 cores; 594.9 m cored; 0 m drilled; 39.8% recovery
151-913ADrilling/drill rigDRILL1993-09-14T12:24:0075.489006.94710-33301993-09-16T12:17:0013 cores; 103.6 m cored; 0 m drilled; 25.3 % recovery
151-913BDrilling/drill rigDRILL1993-09-16T12:17:0075.489206.94680-33301993-09-20T20:30:0051 core; 491.3 m cored; 0 m drilled; 42.8 % recovery
151-912CDrilling/drill rigDRILL1993-12-09T01:25:0079.958705.45600-10481993-09-13T01:20:0012 cores; 115.6 m cored; 0 m drilled; 5.1 % recovery