Event List of Leg145
Download as tab-delimited text
Event label | Optional label | Method/Device | Abbreviation | O2A Registry URI | Date/Time | Latitude | Longitude | Elevation | Date/Time end | Latitude end | Longitude end | Elevation end | Comment |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
145-886B | Drilling/drill rig | DRILL | 1992-04-09T18:15:00 | 44.68970 | -168.24000 | -5726 | 1992-09-05T06:15:00 | 9 cores; 68.9 m cored; 0 m drilled; 87.8 % recovery | |||||
145-881 | Composite Core | COMPCORE | 1992-07-29T00:00:00 | 47.10255 | 161.49162 | -5542 | 1992-08-04T00:00:00 | 64 cores; 597.3 m cored; 0 m drilled; 77.9% recovery | |||||
145-881A | Drilling/drill rig | DRILL | 1992-07-29T06:50:00 | 47.10230 | 161.49150 | -5542 | 1992-07-29T21:10:00 | 1 core; 9.5 m cored; 0 m drilled; 104.4 % recovery | |||||
145-881B | Drilling/drill rig | DRILL | 1992-07-29T21:10:00 | 47.10230 | 161.49150 | -5542 | 1992-07-30T00:00:00 | 18 cores; 167 m cored; 0 m drilled; 102 % recovery | |||||
145-881C | Drilling/drill rig | DRILL | 1992-07-30T18:15:00 | 47.10330 | 161.49150 | -5542 | 1992-08-03T05:45:00 | 39 cores; 363.8 m cored; 0 m drilled; 62.5 % recovery | |||||
145-881D | Drilling/drill rig | DRILL | 1992-08-03T05:45:00 | 47.10230 | 161.49200 | -5542 | 1992-08-04T08:45:00 | 6 cores; 57 m cored; 0 m drilled; 101.6 % recovery | |||||
145-882 | Composite Core | COMPCORE | 1992-08-05T00:00:00 | 50.36330 | 167.59980 | -3255 | 1992-08-08T00:00:00 | 71 cores; 668.7 m cored; 0 m drilled; 103.5% recovery | |||||
145-882A | Drilling/drill rig | DRILL | 1992-08-05T17:45:00 | 50.36330 | 167.60000 | -3255 | 1992-07-08T10:30:00 | 42 cores; 398.3 m cored; 0 m drilled; 103.2 % recovery | |||||
145-882B | Drilling/drill rig | DRILL | 1992-08-07T10:30:00 | 50.36330 | 167.59960 | -3255 | 1992-08-08T17:30:00 | 29 cores; 270.4 m cored; 0 m drilled; 103.9 % recovery | |||||
145-883 | Composite Core | COMPCORE | 1992-08-09T00:00:00 | 51.19850 | 167.76857 | -2398.3 | 1992-08-20T00:00:00 | 158 cores; 1506.1 m cored; 0 m drilled; 81.4% recovery | |||||
145-883A | Drilling/drill rig | DRILL | 1992-08-09T02:00:00 | 51.19830 | 167.76880 | -2407 | 1992-08-09T09:40:00 | 4 cores; 38 m cored; 0 m drilled; 101.3 % recovery | |||||
145-883B | Drilling/drill rig | DRILL | 1992-08-09T09:40:00 | 51.19850 | 167.76880 | -2395 | 1992-08-12T09:00:00 | 88 cores; 840.7 m cored; 0 m drilled; 82.7 % recovery | |||||
145-883C | Drilling/drill rig | DRILL | 1992-08-12T09:00:00 | 51.19870 | 167.76870 | -2397 | 1992-08-13T15:15:00 | 38 cores; 355 m cored; 0 m drilled; 97 % recovery | |||||
145-883D | Drilling/drill rig | DRILL | 1992-08-13T15:15:00 | 51.19850 | 167.76880 | -2397 | 1992-08-13T21:30:00 | 2 cores; 17 m cored; 0 m drilled; 101.8 % recovery | |||||
145-883E | Drilling/drill rig | DRILL | 1992-08-13T21:30:00 | 51.19860 | 167.76830 | -2397 | 1992-08-16T18:45:00 | 23 cores; 226 m cored; 0 m drilled; 51.6 % recovery | |||||
145-883F | Drilling/drill rig | DRILL | 1992-08-16T18:45:00 | 51.19840 | 167.76810 | -2397 | 1992-08-20T04:30:00 | 3 cores; 29.4 m cored; 0 m drilled; 46.2 % recovery | |||||
145-884 | Composite Core | COMPCORE | 1992-08-20T00:00:00 | 51.45052 | 168.33695 | -3836.6 | 1992-08-31T00:00:00 | 142 cores; 1323.2 m cored; 0 m drilled; 88.9% recovery | |||||
145-884A | Drilling/drill rig | DRILL | 1992-08-20T11:00:00 | 51.45040 | 168.33710 | -3838 | 1992-08-20T18:00:00 | 1 core; 9.7 m cored; 0 m drilled; 100.2 % recovery | |||||
145-884B | Drilling/drill rig | DRILL | 1992-08-20T18:00:00 | 51.45040 | 168.33710 | -3836 | 1992-08-24T11:00:00 | 91 core; 853.9 m cored; 0 m drilled; 92.7 % recovery | |||||
145-884C | Drilling/drill rig | DRILL | 1992-08-24T11:00:00 | 51.45060 | 168.33700 | -3836 | 1992-08-25T17:30:00 | 38 cores; 357.8 m cored; 0 m drilled; 82.3 % recovery | |||||
145-884D | Drilling/drill rig | DRILL | 1992-08-25T17:30:00 | 51.45060 | 168.33660 | -3837 | 1992-08-26T01:45:00 | 2 cores; 14.8 m cored; 0 m drilled; 94.1 % recovery | |||||
145-884E | Drilling/drill rig | DRILL | 1992-08-26T01:45:00 | 51.45060 | 168.33690 | -3836 | 1992-08-31T12:30:00 | 10 cores; 87 m cored; 0 m drilled; 76.8 % recovery | |||||
145-885 | Composite Core | COMPCORE | 1992-09-03T00:00:00 | 44.68830 | 168.27200 | -5720 | 1992-09-04T00:00:00 | 8 cores; 58.8 m cored; 0 m drilled; 91.4% recovery | |||||
145-885A | Drilling/drill rig | DRILL | 1992-09-03T07:30:00 | 44.68830 | 168.27200 | -5720 | 1992-09-04T10:00:00 | 8 cores; 58.8 m cored; 0 m drilled; 91.4 % recovery | |||||
145-886 | Composite Core | COMPCORE | 1992-09-04T00:00:00 | 44.68970 | -168.24000 | -5725.3 | 1992-09-05T00:00:00 | 18 cores; 151 m cored; 0 m drilled; 90.9% recovery | |||||
145-886A | Drilling/drill rig | DRILL | 1992-09-04T12:30:00 | 44.68970 | -168.24000 | -5725 | 1992-09-04T18:15:00 | 1 core; 9.7 m cored; 0 m drilled; 100 % recovery | |||||
145-886C | Drilling/drill rig | DRILL | 1992-09-05T06:15:00 | 44.68970 | -168.24000 | -5725 | 1992-09-05T00:30:00 | 8 cores; 72.4 m cored; 0 m drilled; 92.7 % recovery | |||||
145-887 | Composite Core | COMPCORE | 1992-09-09T00:00:00 | 54.36550 | -148.44600 | -3645.2 | 1992-09-16T00:00:00 | 79 cores; 715.5 m cored; 0 m drilled; 79.7% recovery | |||||
145-887A | Drilling/drill rig | DRILL | 1992-09-09T15:30:00 | 54.36540 | -148.44600 | -3643 | 1992-09-11T06:15:00 | 31 core; 286 m cored; 0 m drilled; 83.9 % recovery | |||||
145-887B | Drilling/drill rig | DRILL | 1992-09-11T06:15:00 | 54.36540 | -148.44600 | -3648 | 1992-09-12T05:15:00 | 5 cores; 40 m cored; 0 m drilled; 103.4 % recovery | |||||
145-887C | Drilling/drill rig | DRILL | 1992-09-12T05:15:00 | 54.36560 | -148.44600 | -3645 | 1992-09-13T17:00:00 | 30 cores; 273.8 m cored; 0 m drilled; 98.4 % recovery | |||||
145-887D | Drilling/drill rig | DRILL | 1992-09-13T17:00:00 | 54.36560 | -148.44600 | -3645 | 1992-09-16T15:00:00 | 13 cores; 115.7 m cored; 0 m drilled; 17.2 % recovery |