Event List of Leg13
Download as tab-delimited text
Event label | Optional label | Method/Device | Abbreviation | Sensor URI | Date/Time | Latitude | Longitude | Elevation | Date/Time end | Latitude end | Longitude end | Elevation end | Comment |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
13-120 | Drilling/drill rig | DRILL | 1970-08-14T00:00:00 | 36.68980 | -11.43230 | -1711 | 8 cores; 27.6 m cored; 0 m drilled; 19.6 % recovery | ||||||
13-120_Site | Composite Core | COMPCORE | 1970-08-14T00:00:00 | 36.68980 | -11.43230 | -1711 | 8 cores; 27.6 m cored; 0 m drilled; 19.6% recovery | ||||||
13-121 | Drilling/drill rig | DRILL | 1970-08-18T00:00:00 | 36.16080 | -4.37380 | -1163 | 24 cores; 190.7 m cored; 4 m drilled; 23.6 % recovery | ||||||
13-121_Site | Composite Core | COMPCORE | 1970-08-18T00:00:00 | 36.16080 | -4.37380 | -1163 | 24 cores; 190.7 m cored; 4 m drilled; 23.6% recovery | ||||||
13-122 | Drilling/drill rig | DRILL | 1970-08-23T00:00:00 | 40.44780 | 2.62430 | -2146 | 7 cores; 32.1 m cored; 0 m drilled; 19.9 % recovery | ||||||
13-122_Site | Composite Core | COMPCORE | 1970-08-23T00:00:00 | 40.44780 | 2.62430 | -2146 | 7 cores; 32.1 m cored; 0 m drilled; 19.9% recovery | ||||||
13-123_Site | Composite Core | COMPCORE | 1970-08-24T00:00:00 | 40.63050 | 2.83780 | -2290 | 7 cores; 62.2 m cored; 9.2 m drilled; 25.7% recovery | ||||||
13-123 | Drilling/drill rig | DRILL | 1970-08-24T00:00:00 | 40.63050 | 2.83780 | -2290 | 7 cores; 62.2 m cored; 9.2 m drilled; 25.7 % recovery | ||||||
13-124_Site | Composite Core | COMPCORE | 1970-08-26T00:00:00 | 38.87300 | 4.99480 | -2726 | 13 cores; 68.2 m cored; 4.2 m drilled; 57.2% recovery | ||||||
13-124 | Drilling/drill rig | DRILL | 1970-08-26T00:00:00 | 38.87300 | 4.99480 | -2726 | 13 cores; 68.2 m cored; 4.2 m drilled; 57.2 % recovery | ||||||
13-125 | Drilling/drill rig | DRILL | 1970-09-01T00:00:00 | 34.62480 | 20.42930 | -2782 | 8 cores; 71 m cored; 25.9 m drilled; 64.3 % recovery | ||||||
13-125A | Drilling/drill rig | DRILL | 1970-09-01T00:00:00 | 34.62480 | 20.42930 | -2782 | 9 cores; 72 m cored; 10 m drilled; 22.8 % recovery | ||||||
13-125_Site | Composite Core | COMPCORE | 1970-09-01T00:00:00 | 34.62480 | 20.42930 | -2782 | 17 cores; 143 m cored; 35.9 m drilled; 43.4% recovery | ||||||
13-126A | Drilling/drill rig | DRILL | 1970-09-04T00:00:00 | 35.16200 | 21.42720 | -3733 | 1 cores; 0.9 m cored; 0 m drilled; 66.7 % recovery | ||||||
13-126 | Drilling/drill rig | DRILL | 1970-09-04T00:00:00 | 35.16200 | 21.42720 | -3730 | 5 cores; 27.4 m cored; 3 m drilled; 65.3 % recovery | ||||||
13-126_Site | Composite Core | COMPCORE | 1970-09-04T00:00:00 | 35.16200 | 21.42720 | -3731.5 | 6 cores; 28.3 m cored; 3 m drilled; 65.4% recovery | ||||||
13-127_Site | Composite Core | COMPCORE | 1970-09-06T00:00:00 | 35.73170 | 22.49680 | -4643.3 | 25 cores; 176 m cored; 37 m drilled; 64.4% recovery | ||||||
13-127A | Drilling/drill rig | DRILL | 1970-09-06T00:00:00 | 35.73170 | 22.49680 | -4636 | 5 cores; 31 m cored; 0 m drilled; 71.9 % recovery | ||||||
13-127 | Drilling/drill rig | DRILL | 1970-09-06T00:00:00 | 35.73170 | 22.49680 | -4654 | 19 cores; 144 m cored; 37 m drilled; 63 % recovery | ||||||
13-127B | Drilling/drill rig | DRILL | 1970-09-06T00:00:00 | 35.73170 | 22.49680 | -4640 | 1 cores; 1 m cored; 0 m drilled; 40 % recovery | ||||||
13-128 | Drilling/drill rig | DRILL | 1970-09-10T00:00:00 | 35.70970 | 22.46830 | -4640 | 11 cores; 94.5 m cored; 101 m drilled; 73.7 % recovery | ||||||
13-128_Site | Composite Core | COMPCORE | 1970-09-10T00:00:00 | 35.70970 | 22.46830 | -4640 | 11 cores; 94.5 m cored; 101 m drilled; 73.7% recovery | ||||||
13-129_Site | Composite Core | COMPCORE | 1970-09-13T00:00:00 | 34.34930 | 27.08200 | -2974 | 10 cores; 36 m cored; 69 m drilled; 16.1% recovery | ||||||
13-129 | Drilling/drill rig | DRILL | 1970-09-13T00:00:00 | 34.34930 | 27.08200 | -3048 | 4 cores; 14 m cored; 60 m drilled; 20.7 % recovery | ||||||
13-129A | Drilling/drill rig | DRILL | 1970-09-13T00:00:00 | 34.34930 | 27.08200 | -2832 | 2 cores; 5 m cored; 9 m drilled; 32 % recovery | ||||||
13-129B | Drilling/drill rig | DRILL | 1970-09-13T00:00:00 | 34.34930 | 27.08200 | -3042 | 4 cores; 17 m cored; 0 m drilled; 7.6 % recovery | ||||||
13-130 | Drilling/drill rig | DRILL | 1970-09-16T00:00:00 | 33.60520 | 27.86650 | -2979 | 8 cores; 191 m cored; 0 m drilled; 11.9 % recovery | ||||||
13-130A | Drilling/drill rig | DRILL | 1970-09-16T00:00:00 | 33.60520 | 27.86650 | -2982 | 1 cores; 11 m cored; 0 m drilled; 13.6 % recovery | ||||||
13-130_Site | Composite Core | COMPCORE | 1970-09-16T00:00:00 | 33.60520 | 27.86650 | -2980.5 | 9 cores; 202 m cored; 0 m drilled; 12% recovery | ||||||
13-131 | Drilling/drill rig | DRILL | 1970-09-18T00:00:00 | 33.10650 | 28.51150 | -3035 | 1 cores; 9 m cored; 0 m drilled; 88.9 % recovery | ||||||
13-131_Site | Composite Core | COMPCORE | 1970-09-18T00:00:00 | 33.10650 | 28.51150 | -3036 | 6 cores; 54 m cored; 0 m drilled; 29.3% recovery | ||||||
13-131A | Drilling/drill rig | DRILL | 1970-09-18T00:00:00 | 33.10650 | 28.51150 | -3037 | 5 cores; 45 m cored; 0 m drilled; 17.3 % recovery | ||||||
13-132 | Drilling/drill rig | DRILL | 1970-09-24T00:00:00 | 40.26170 | 11.44120 | -2835 | 26 cores; 214 m cored; 9 m drilled; 77.2 % recovery | ||||||
13-132_Site | Composite Core | COMPCORE | 1970-09-24T00:00:00 | 40.26170 | 11.44120 | -2835 | 26 cores; 214 m cored; 9 m drilled; 77.2% recovery | ||||||
13-133 | Drilling/drill rig | DRILL | 1970-09-27T00:00:00 | 39.19980 | 7.33550 | -2563 | 7 cores; 59 m cored; 9 m drilled; 11 % recovery | ||||||
13-133_Site | Composite Core | COMPCORE | 1970-09-27T00:00:00 | 39.19980 | 7.33550 | -2563 | 7 cores; 59 m cored; 9 m drilled; 11% recovery | ||||||
13-134_Site | Composite Core | COMPCORE | 1970-09-28T00:00:00 | 39.19500 | 7.30420 | -2867 | 14 cores; 82 m cored; 37 m drilled; 31.7% recovery | ||||||
13-134E | Drilling/drill rig | DRILL | 1970-09-28T00:00:00 | 39.19500 | 7.30420 | -2869 | 2 cores; 12 m cored; 4 m drilled; 2.5 % recovery | ||||||
13-134C | Drilling/drill rig | DRILL | 1970-09-28T00:00:00 | 39.19500 | 7.30420 | -2869 | OPERATIONAL LIMIT REACHED | ||||||
13-134B | Drilling/drill rig | DRILL | 1970-09-28T00:00:00 | 39.19500 | 7.30420 | -2869 | 1 cores; 5 m cored; 0 m drilled; 4 % recovery | ||||||
13-134A | Drilling/drill rig | DRILL | 1970-09-28T00:00:00 | 39.19500 | 7.30420 | -2863 | 2 cores; 11 m cored; 0 m drilled; 17.3 % recovery | ||||||
13-134 | Drilling/drill rig | DRILL | 1970-09-28T00:00:00 | 39.19500 | 7.30420 | -2863 | 6 cores; 39 m cored; 33 m drilled; 57.2 % recovery | ||||||
13-134D | Drilling/drill rig | DRILL | 1970-09-28T00:00:00 | 39.19500 | 7.30420 | -2871 | 3 cores; 15 m cored; 0 m drilled; 8.7 % recovery |