Event List of Leg122
Download as tab-delimited text
Event label | Optional label | Method/Device | Abbreviation | O2A Registry URI | Date/Time | Latitude | Longitude | Elevation | Date/Time end | Latitude end | Longitude end | Elevation end | Comment |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
122-759 | Composite Core | COMPCORE | 1988-07-08T00:00:00 | -16.95400 | 115.56035 | -2103 | 1988-07-11T00:00:00 | 39 cores; 308 m cored; 0 m drilled; 42.1% recovery | |||||
122-759A | Drilling/drill rig | DRILL | 1988-07-08T20:15:00 | -16.95400 | 115.56020 | -2103 | 1988-07-09T07:00:00 | 0 cores; 0 m cored; 0 m drilled | |||||
122-759B | Drilling/drill rig | DRILL | 1988-07-09T07:00:00 | -16.95400 | 115.56050 | -2103 | 1988-07-11T21:15:00 | 39 cores; 308 m cored; 0 m drilled; 42.1 % recovery | |||||
122-760 | Composite Core | COMPCORE | 1988-07-11T00:00:00 | -16.92200 | 115.54120 | -1981 | 1988-07-19T00:00:00 | 67 cores; 790.9 m cored; 0 m drilled; 40.4% recovery | |||||
122-760A | Drilling/drill rig | DRILL | 1988-07-11T23:15:00 | -16.92200 | 115.54130 | -1981 | 1988-07-14T13:00:00 | 38 cores; 284.9 m cored; 0 m drilled; 68.9 % recovery | |||||
122-760B | Drilling/drill rig | DRILL | 1988-07-14T13:00:00 | -16.92200 | 115.54110 | -1981 | 1988-07-19T00:45:00 | 29 cores; 506 m cored; 0 m drilled; 24.3 % recovery | |||||
122-761 | Composite Core | COMPCORE | 1988-07-19T00:00:00 | -16.73733 | 115.53500 | -2179 | 1988-07-25T00:00:00 | 67 cores; 732.9 m cored; 0 m drilled; 38.4% recovery | |||||
122-761A | Drilling/drill rig | DRILL | 1988-07-19T03:15:00 | -16.73800 | 115.53500 | -2179 | 1988-07-19T10:00:00 | 1 core; 9.5 m cored; 0 m drilled; 104.4 % recovery | |||||
122-761B | Drilling/drill rig | DRILL | 1988-07-19T10:00:00 | -16.73700 | 115.53500 | -2179 | 1988-07-21T09:00:00 | 33 cores; 286.7 m cored; 0 m drilled; 69.4 % recovery | |||||
122-761C | Drilling/drill rig | DRILL | 1988-07-21T09:00:00 | -16.73700 | 115.53500 | -2179 | 1988-07-25T02:00:00 | 33 cores; 436.7 m cored; 0 m drilled; 16.5 % recovery | |||||
122-762 | Composite Core | COMPCORE | 1988-07-26T00:00:00 | -19.88700 | 112.25410 | -1371 | 1988-08-05T00:00:00 | 111 cores; 1124.9 m cored; 0 m drilled; 64% recovery | |||||
122-762A | Drilling/drill rig | DRILL | 1988-07-26T02:15:00 | -19.88700 | 112.25430 | -1371 | 1988-07-26T11:00:00 | 1 core; 9.5 m cored; 0 m drilled; 105.7 % recovery | |||||
122-762B | Drilling/drill rig | DRILL | 1988-07-26T11:00:00 | -19.88700 | 112.25400 | -1371 | 1988-07-27T03:25:00 | 19 cores; 175.4 m cored; 0 m drilled; 99.7 % recovery | |||||
122-762C | Drilling/drill rig | DRILL | 1988-07-27T03:25:00 | -19.88700 | 112.25400 | -1371 | 1988-08-05T08:30:00 | 91 core; 940 m cored; 0 m drilled; 56.9 % recovery | |||||
122-763 | Composite Core | COMPCORE | 1988-08-05T00:00:00 | -20.58700 | 112.20850 | -1379 | 1988-08-17T00:00:00 | 121 cores; 1885 m cored; 0 m drilled; 48.3% recovery | |||||
122-763A | Drilling/drill rig | DRILL | 1988-08-05T15:05:00 | -20.58700 | 112.20830 | -1379 | 1988-08-06T19:30:00 | 21 core; 194.9 m cored; 0 m drilled; 103.6 % recovery | |||||
122-763B | Drilling/drill rig | DRILL | 1988-08-06T07:30:00 | -20.58700 | 112.20870 | -1379 | 1988-08-11T21:00:00 | 54 cores; 653.5 m cored; 0 m drilled; 57.6 % recovery | |||||
122-763C | Drilling/drill rig | DRILL | 1988-08-11T21:00:00 | -20.58700 | 112.20850 | -1379 | 1988-08-17T12:00:00 | 46 cores; 1036.6 m cored; 0 m drilled; 32.1 % recovery | |||||
122-764 | Composite Core | COMPCORE | 1988-08-18T00:00:00 | -16.56600 | 115.45720 | -2710 | 1988-08-22T00:00:00 | 39 cores; 363.5 m cored; 0 m drilled; 23.4% recovery | |||||
122-764A | Drilling/drill rig | DRILL | 1988-08-18T16:15:00 | -16.56600 | 115.45720 | -2710 | 1988-08-19T16:15:00 | 8 cores; 69 m cored; 0 m drilled; 58.8 % recovery | |||||
122-764B | Drilling/drill rig | DRILL | 1988-08-19T09:45:00 | -16.56600 | 115.45720 | -2710 | 1988-08-22T19:45:00 | 31 core; 294.5 m cored; 0 m drilled; 15.1 % recovery |