Event List of Leg121
Download as tab-delimited text
Event label | Optional label | Method/Device | Abbreviation | O2A Registry URI | Date/Time | Latitude | Longitude | Elevation | Date/Time end | Latitude end | Longitude end | Elevation end | Comment |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
121-752 | Composite Core | COMPCORE | 1988-05-10T00:00:00 | -30.89100 | 93.57775 | -1097 | 1988-05-22T00:00:00 | 51 cores; 475.6 m cored; 0 m drilled; 69.3% recovery | |||||
121-752A | Drilling/drill rig | DRILL | 1988-05-10T03:15:00 | -30.89100 | 93.57800 | -1097 | 1988-05-12T13:55:00 | 34 cores; 317.6 m cored; 0 m drilled; 68.4 % recovery | |||||
121-753 | Composite Core | COMPCORE | 1988-05-12T00:00:00 | -30.83900 | 93.58990 | -1187 | 1988-05-13T00:00:00 | 12 cores; 111 m cored; 0 m drilled; 55% recovery | |||||
121-753A | Drilling/drill rig | DRILL | 1988-05-12T16:30:00 | -30.83900 | 93.58990 | -1187 | 1988-05-13T06:15:00 | 7 cores; 62.8 m cored; 0 m drilled; 97.2 % recovery | |||||
121-754 | Composite Core | COMPCORE | 1988-05-13T00:00:00 | -30.94100 | 93.56650 | -1075.5 | 1988-05-18T00:00:00 | 47 cores; 402 m cored; 0 m drilled; 54.8% recovery | |||||
121-753B | Drilling/drill rig | DRILL | 1988-05-13T06:15:00 | -30.83900 | 93.58990 | -1187 | 1988-05-13T17:25:00 | 5 cores; 48.2 m cored; 0 m drilled; 0.1 % recovery | |||||
121-754A | Drilling/drill rig | DRILL | 1988-05-13T18:30:00 | -30.94100 | 93.56650 | -1075 | 1988-05-15T05:15:00 | 23 cores; 170 m cored; 0 m drilled; 75.5 % recovery | |||||
121-754B | Drilling/drill rig | DRILL | 1988-05-15T05:15:00 | -30.94100 | 93.56650 | -1076 | 1988-05-18T05:40:00 | 24 cores; 232 m cored; 0 m drilled; 39.6 % recovery | |||||
121-752B | Drilling/drill rig | DRILL | 1988-05-18T09:00:00 | -30.89100 | 93.57750 | -1097 | 1988-05-22T12:30:00 | 17 cores; 158 m cored; 0 m drilled; 71.1 % recovery | |||||
121-755 | Composite Core | COMPCORE | 1988-05-22T00:00:00 | -31.03000 | 93.54670 | -1069 | 1988-05-24T00:00:00 | 19 cores; 178.4 m cored; 0 m drilled; 45% recovery | |||||
121-755A | Drilling/drill rig | DRILL | 1988-05-22T15:00:00 | -31.03000 | 93.54670 | -1069 | 1988-05-24T07:30:00 | 19 cores; 178.4 m cored; 0 m drilled; 45 % recovery | |||||
121-756 | Composite Core | COMPCORE | 1988-05-25T00:00:00 | -27.35525 | 87.59730 | -1527.2 | 1988-05-29T00:00:00 | 34 cores; 291.8 m cored; 0 m drilled; 76.5% recovery | |||||
121-756A | Drilling/drill rig | DRILL | 1988-05-25T20:49:00 | -27.35600 | 87.59680 | -1529 | 1988-05-26T04:00:00 | 1 core; 9.7 m cored; 0 m drilled; 100.2 % recovery | |||||
121-756C | Drilling/drill rig | DRILL | 1988-05-26T00:00:00 | -27.35400 | 87.59820 | -1527 | 1988-05-27T18:45:00 | 11 core; 76.6 m cored; 0 m drilled; 80.7 % recovery | |||||
121-756B | Drilling/drill rig | DRILL | 1988-05-26T04:00:00 | -27.35600 | 87.59680 | -1529 | 1988-05-26T12:35:00 | 11 core; 104.3 m cored; 0 m drilled; 101.3 % recovery | |||||
121-756D | Drilling/drill rig | DRILL | 1988-05-27T18:45:00 | -27.35500 | 87.59740 | -1524 | 1988-05-29T10:30:00 | 11 core; 101.2 m cored; 0 m drilled; 45.5 % recovery | |||||
121-757 | Composite Core | COMPCORE | 1988-06-01T00:00:00 | -17.02367 | 88.18113 | -1659.7 | 1988-06-05T00:00:00 | 55 cores; 490.3 m cored; 0 m drilled; 71.2% recovery | |||||
121-757A | Drilling/drill rig | DRILL | 1988-06-01T02:10:00 | -17.02400 | 88.18160 | -1661 | 1988-06-01T11:00:00 | 1 core; 9.4 m cored; 0 m drilled; 100 % recovery | |||||
121-757B | Drilling/drill rig | DRILL | 1988-06-01T11:00:00 | -17.02400 | 88.18160 | -1663 | 1988-06-04T06:15:00 | 43 cores; 374.8 m cored; 0 m drilled; 72.6 % recovery | |||||
121-757C | Drilling/drill rig | DRILL | 1988-06-04T06:15:00 | -17.02300 | 88.18020 | -1655 | 1988-06-05T18:10:00 | 11 core; 106.1 m cored; 0 m drilled; 63.9 % recovery | |||||
121-758 | Composite Core | COMPCORE | 1988-06-15T00:00:00 | 5.38407 | 90.36117 | -2935 | 1988-06-15T00:00:00 | 84 cores; 782.2 m cored; 0 m drilled; 71.8% recovery | |||||
121-758B | Drilling/drill rig | DRILL | 1988-06-15T04:40:00 | 5.38400 | 90.36120 | -2937 | 1988-06-15T15:58:00 | 10 cores; 96 m cored; 0 m drilled; 102.8 % recovery | |||||
121-758C | Drilling/drill rig | DRILL | 1988-06-15T15:58:00 | 5.38400 | 90.36110 | -2933 | 1988-06-15T23:50:00 | 1 core; 9.4 m cored; 0 m drilled; 100 % recovery | |||||
121-758A | Drilling/drill rig | DRILL | 1988-06-15T23:50:00 | 5.38420 | 90.36120 | -2935 | 1988-06-24T13:30:00 | 73 cores; 676.8 m cored; 0 m drilled; 67.1 % recovery |