Event List of Leg120
Download as tab-delimited text
Event label | Optional label | Method/Device | Abbreviation | O2A Registry URI | Date/Time | Latitude | Longitude | Elevation | Date/Time end | Latitude end | Longitude end | Elevation end | Comment |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
120-747 | Composite Core | COMPCORE | 1988-03-06T00:00:00 | -54.81100 | 76.79400 | -1706.7 | 1988-03-12T00:00:00 | 49 cores; 450.8 m cored; 0 m drilled; 72.3% recovery | |||||
120-747A | Drilling/drill rig | DRILL | 1988-03-06T22:30:00 | -54.81100 | 76.79400 | -1706 | 1988-03-08T17:15:00 | 27 cores; 256 m cored; 0 m drilled; 88.8 % recovery | |||||
120-747B | Drilling/drill rig | DRILL | 1988-03-08T17:15:00 | -54.81100 | 76.79400 | -1708 | 1988-03-09T06:45:00 | 6 cores; 50.3 m cored; 0 m drilled; 97.2 % recovery | |||||
120-747C | Drilling/drill rig | DRILL | 1988-03-09T06:45:00 | -54.81100 | 76.79400 | -1706 | 1988-03-12T17:00:00 | 16 cores; 144.5 m cored; 0 m drilled; 34.3 % recovery | |||||
120-748 | Composite Core | COMPCORE | 1988-03-13T00:00:00 | -58.44100 | 78.99810 | -1300 | 1988-03-23T00:00:00 | 114 cores; 1004.1 m cored; 0 m drilled; 39.4% recovery | |||||
120-748A | Drilling/drill rig | DRILL | 1988-03-13T22:15:00 | -58.44100 | 78.99810 | -1298 | 1988-03-14T07:30:00 | 2 cores; 19 m cored; 0 m drilled; 101.3 % recovery | |||||
120-748B | Drilling/drill rig | DRILL | 1988-03-14T07:30:00 | -58.44100 | 78.99810 | -1301 | 1988-03-15T11:00:00 | 25 cores; 225.1 m cored; 0 m drilled; 84.5 % recovery | |||||
120-748C | Drilling/drill rig | DRILL | 1988-03-15T11:00:00 | -58.44100 | 78.99810 | -1301 | 1988-03-23T22:54:00 | 87 cores; 760 m cored; 0 m drilled; 24.5 % recovery | |||||
120-749 | Composite Core | COMPCORE | 1988-03-24T00:00:00 | -58.71700 | 76.40750 | -1080.7 | 1988-03-28T00:00:00 | 31 cores; 280.8 m cored; 0 m drilled; 37.3% recovery | |||||
120-749A | Drilling/drill rig | DRILL | 1988-03-24T11:00:00 | -58.71700 | 76.40750 | -1082 | 1988-03-24T16:30:00 | 1 core; 9.5 m cored; 0 m drilled; 105.7 % recovery | |||||
120-749B | Drilling/drill rig | DRILL | 1988-03-24T16:30:00 | -58.71700 | 76.40750 | -1080 | 1988-03-25T09:45:00 | 14 cores; 123.8 m cored; 0 m drilled; 52.2 % recovery | |||||
120-749C | Drilling/drill rig | DRILL | 1988-03-25T09:45:00 | -58.71700 | 76.40750 | -1080 | 1988-03-28T01:00:00 | 16 cores; 147.5 m cored; 0 m drilled; 20.3 % recovery | |||||
120-750 | Composite Core | COMPCORE | 1988-04-14T00:00:00 | -57.59200 | 81.23990 | -2041 | 1988-04-23T00:00:00 | 27 cores; 246.7 m cored; 0 m drilled; 37.8% recovery | |||||
120-750A | Drilling/drill rig | DRILL | 1988-04-14T06:15:00 | -57.59200 | 81.24030 | -2041 | 1988-04-18T14:00:00 | 21 core; 189.3 m cored; 0 m drilled; 36.3 % recovery | |||||
120-751 | Composite Core | COMPCORE | 1988-04-18T00:00:00 | -57.72600 | 79.81480 | -1644 | 1988-04-19T00:00:00 | 18 cores; 166.2 m cored; 0 m drilled; 98% recovery | |||||
120-751A | Drilling/drill rig | DRILL | 1988-04-18T20:00:00 | -57.72600 | 79.81480 | -1644 | 1988-04-19T23:30:00 | 18 cores; 166.2 m cored; 0 m drilled; 98 % recovery | |||||
120-750B | Drilling/drill rig | DRILL | 1988-04-20T05:00:00 | -57.59200 | 81.23950 | -2041 | 1988-04-23T04:00:00 | 6 cores; 57.4 m cored; 0 m drilled; 42.9 % recovery |