Event List of Leg119
Download as tab-delimited text
Event label | Optional label | Method/Device | Abbreviation | Sensor URI | Date/Time | Latitude | Longitude | Elevation | Date/Time end | Latitude end | Longitude end | Elevation end | Comment |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
119-736 | Composite Core | COMPCORE | 1987-12-26T00:00:00 | -49.40300 | 71.66150 | -639.7 | 1987-12-29T00:00:00 | 50 cores; 441.8 m cored; 0 m drilled; 57.1% recovery | |||||
119-736A | Drilling/drill rig | DRILL | 1987-12-26T02:30:00 | -49.40300 | 71.66150 | -640 | 1987-12-28T04:30:00 | 30 cores; 250.3 m cored; 0 m drilled; 58.7 % recovery | |||||
119-736B | Drilling/drill rig | DRILL | 1987-12-28T04:30:00 | -49.40300 | 71.66150 | -639 | 1987-12-28T19:00:00 | 3 cores; 27.4 m cored; 0 m drilled; 101.5 % recovery | |||||
119-736C | Drilling/drill rig | DRILL | 1987-12-28T19:00:00 | -49.40300 | 71.66150 | -640 | 1987-12-29T16:30:00 | 17 cores; 164.1 m cored; 0 m drilled; 47.1 % recovery | |||||
119-737 | Composite Core | COMPCORE | 1987-12-30T00:00:00 | -50.22800 | 73.03240 | -575 | 1988-01-04T00:00:00 | 79 cores; 754.5 m cored; 0 m drilled; 63.6% recovery | |||||
119-737A | Drilling/drill rig | DRILL | 1987-12-30T04:30:00 | -50.22800 | 73.03240 | -575 | 1987-12-31T17:15:00 | 29 cores; 273.2 m cored; 0 m drilled; 66.5 % recovery | |||||
119-737B | Drilling/drill rig | DRILL | 1987-12-31T17:15:00 | -50.22800 | 73.03240 | -575 | 1988-01-04T09:30:00 | 50 cores; 481.3 m cored; 0 m drilled; 62 % recovery | |||||
119-738 | Composite Core | COMPCORE | 1988-01-10T00:00:00 | -62.70900 | 82.78780 | -2263 | 1988-01-17T00:00:00 | 60 cores; 554.3 m cored; 0 m drilled; 57.7% recovery | |||||
119-738A | Drilling/drill rig | DRILL | 1988-01-10T02:45:00 | -62.70900 | 82.78780 | -2263 | 1988-01-10T16:30:00 | 1 core; 2.8 m cored; 0 m drilled; 98.6 % recovery | |||||
119-738B | Drilling/drill rig | DRILL | 1988-01-10T16:30:00 | -62.70900 | 82.78780 | -2263 | 1988-01-11T18:45:00 | 24 cores; 214.3 m cored; 0 m drilled; 79.7 % recovery | |||||
119-738C | Drilling/drill rig | DRILL | 1988-01-11T18:45:00 | -62.70900 | 82.78780 | -2263 | 1988-01-17T05:00:00 | 35 cores; 337.2 m cored; 0 m drilled; 43.3 % recovery | |||||
119-739 | Composite Core | COMPCORE | 1988-01-18T00:00:00 | -67.28500 | 75.08180 | -423 | 1988-01-23T00:00:00 | 67 cores; 499.6 m cored; 0 m drilled; 35.3% recovery | |||||
119-739A | Drilling/drill rig | DRILL | 1988-01-18T14:30:00 | -67.28500 | 75.08180 | -423 | 1988-01-18T19:30:00 | 2 cores; 5.6 m cored; 0 m drilled; 102.3 % recovery | |||||
119-739B | Drilling/drill rig | DRILL | 1988-01-18T19:30:00 | -67.28500 | 75.08180 | -423 | 1988-01-19T03:00:00 | 3 cores; 7.2 m cored; 0 m drilled; 26.7 % recovery | |||||
119-739C | Drilling/drill rig | DRILL | 1988-01-19T03:00:00 | -67.28500 | 75.08180 | -423 | 1988-01-23T05:30:00 | 62 cores; 486.8 m cored; 0 m drilled; 34.6 % recovery | |||||
119-740 | Composite Core | COMPCORE | 1988-01-23T00:00:00 | -68.76400 | 76.68190 | -821.5 | 1988-01-27T00:00:00 | 32 cores; 227.1 m cored; 0 m drilled; 32.5% recovery | |||||
119-740A | Drilling/drill rig | DRILL | 1988-01-23T18:30:00 | -68.76400 | 76.68190 | -818 | 1988-01-27T13:15:00 | 31 core; 225.5 m cored; 0 m drilled; 32 % recovery | |||||
119-741 | Composite Core | COMPCORE | 1988-01-27T00:00:00 | -68.38700 | 76.38250 | -562 | 1988-01-27T00:00:00 | 14 cores; 128.1 m cored; 0 m drilled; 26.2% recovery | |||||
119-740B | Drilling/drill rig | DRILL | 1988-01-27T13:15:00 | -68.76400 | 76.68190 | -825 | 1988-01-27T18:00:00 | 1 core; 1.6 m cored; 0 m drilled; 100 % recovery | |||||
119-741A | Drilling/drill rig | DRILL | 1988-01-27T23:00:00 | -68.38700 | 76.38250 | -562 | 1988-01-27T12:00:00 | 14 cores; 128.1 m cored; 0 m drilled; 26.2 % recovery | |||||
119-742 | Composite Core | COMPCORE | 1988-01-28T00:00:00 | -67.55300 | 75.40900 | -426 | 1988-02-02T00:00:00 | 34 cores; 316 m cored; 0 m drilled; 53.4% recovery | |||||
119-742A | Drilling/drill rig | DRILL | 1988-01-28T02:15:00 | -67.55300 | 75.40900 | -426 | 1988-02-02T07:30:00 | 34 cores; 316 m cored; 0 m drilled; 53.4 % recovery | |||||
119-743 | Composite Core | COMPCORE | 1988-02-02T00:00:00 | -66.91600 | 74.69050 | -999 | 1988-02-03T00:00:00 | 14 cores; 97.3 m cored; 0 m drilled; 22.4% recovery | |||||
119-743A | Drilling/drill rig | DRILL | 1988-02-02T17:00:00 | -66.91600 | 74.69050 | -999 | 1988-02-03T20:00:00 | 14 cores; 97.3 m cored; 0 m drilled; 22.4 % recovery | |||||
119-744 | Composite Core | COMPCORE | 1988-02-05T00:00:00 | -61.57900 | 80.59500 | -2318 | 1988-02-07T00:00:00 | 32 cores; 280.6 m cored; 0 m drilled; 89.6% recovery | |||||
119-744A | Drilling/drill rig | DRILL | 1988-02-05T19:00:00 | -61.57900 | 80.59500 | -2318 | 1988-02-06T19:15:00 | 20 cores; 176.1 m cored; 0 m drilled; 82.3 % recovery | |||||
119-744B | Drilling/drill rig | DRILL | 1988-02-06T19:15:00 | -61.57900 | 80.59500 | -2317 | 1988-02-07T06:30:00 | 9 cores; 78.5 m cored; 0 m drilled; 101.6 % recovery | |||||
119-744C | Drilling/drill rig | DRILL | 1988-02-07T06:30:00 | -61.57900 | 80.59500 | -2319 | 1988-02-07T14:30:00 | 3 cores; 26 m cored; 0 m drilled; 103 % recovery | |||||
119-745 | Composite Core | COMPCORE | 1988-02-08T00:00:00 | -59.59500 | 85.85420 | -4093 | 1988-02-10T00:00:00 | 25 cores; 225 m cored; 0 m drilled; 102.5% recovery | |||||
119-745A | Drilling/drill rig | DRILL | 1988-02-08T17:15:00 | -59.59500 | 85.85420 | -4093 | 1988-02-09T03:30:00 | 1 core; 10 m cored; 0 m drilled; 98.6 % recovery | |||||
119-745B | Drilling/drill rig | DRILL | 1988-02-09T15:30:00 | -59.59500 | 85.85420 | -4093 | 1988-02-10T17:15:00 | 24 cores; 215 m cored; 0 m drilled; 102.7 % recovery | |||||
119-746 | Composite Core | COMPCORE | 1988-02-10T00:00:00 | -59.56900 | 85.86820 | -4070 | 1988-02-12T00:00:00 | 14 cores; 125.5 m cored; 0 m drilled; 75.3% recovery | |||||
119-746A | Drilling/drill rig | DRILL | 1988-02-10T20:27:00 | -59.56900 | 85.86820 | -4070 | 1988-02-12T18:00:00 | 14 cores; 125.5 m cored; 0 m drilled; 75.3 % recovery |