Event List of Leg115
Download as tab-delimited text
Event label | Optional label | Method/Device | Abbreviation | Sensor URI | Date/Time | Latitude | Longitude | Elevation | Date/Time end | Latitude end | Longitude end | Elevation end | Comment |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
115-709C | Drilling/drill rig | DRILL | 1987-05-07T04:00:00 | -3.91500 | 60.55167 | -3039 | 1987-06-08T17:00:00 | 37 cores; 353.7 m cored; 0 m drilled; 93.3 % recovery | |||||
115-705 | Composite Core | COMPCORE | 1987-05-21T00:00:00 | -13.16700 | 61.38370 | -2318 | 1987-05-22T00:00:00 | 3 cores; 27.5 m cored; 0 m drilled; 69.7% recovery | |||||
115-705A | Drilling/drill rig | DRILL | 1987-05-21T21:00:00 | -13.16700 | 61.38370 | -2318 | 1987-05-22T18:30:00 | 3 cores; 27.5 m cored; 0 m drilled; 69.7 % recovery | |||||
115-706 | Composite Core | COMPCORE | 1987-05-22T00:00:00 | -13.11400 | 61.37100 | -2517.7 | 1987-05-26T00:00:00 | 21 cores; 168.6 m cored; 0 m drilled; 52.5% recovery | |||||
115-706A | Drilling/drill rig | DRILL | 1987-05-22T23:15:00 | -13.11400 | 61.37100 | -2517 | 1987-05-23T08:00:00 | 6 cores; 47.5 m cored; 0 m drilled; 82.7 % recovery | |||||
115-706B | Drilling/drill rig | DRILL | 1987-05-23T08:00:00 | -13.11400 | 61.37100 | -2518 | 1987-05-24T03:30:00 | 7 cores; 43.7 m cored; 0 m drilled; 67.4 % recovery | |||||
115-706C | Drilling/drill rig | DRILL | 1987-05-24T03:30:00 | -13.11400 | 61.37100 | -2518 | 1987-05-26T00:45:00 | 8 cores; 77.4 m cored; 0 m drilled; 25.5 % recovery | |||||
115-707 | Composite Core | COMPCORE | 1987-05-27T00:00:00 | -7.54530 | 59.01680 | -1552.3 | 1987-06-02T00:00:00 | 64 cores; 597.6 m cored; 0 m drilled; 58.2% recovery | |||||
115-707A | Drilling/drill rig | DRILL | 1987-05-27T14:10:00 | -7.54530 | 59.01680 | -1553 | 1987-05-28T18:30:00 | 24 cores; 213.3 m cored; 0 m drilled; 75.1 % recovery | |||||
115-707B | Drilling/drill rig | DRILL | 1987-05-28T18:30:00 | -7.54530 | 59.01680 | -1552 | 1987-05-29T10:30:00 | 13 cores; 124.9 m cored; 0 m drilled; 76.9 % recovery | |||||
115-707C | Drilling/drill rig | DRILL | 1987-05-29T10:30:00 | -7.54530 | 59.01680 | -1552 | 1987-06-02T03:30:00 | 27 cores; 259.4 m cored; 0 m drilled; 35.3 % recovery | |||||
115-708 | Composite Core | COMPCORE | 1987-06-02T00:00:00 | -5.45580 | 59.94380 | -4107 | 1987-06-04T00:00:00 | 25 cores; 236.2 m cored; 0 m drilled; 80.3% recovery | |||||
115-708A | Drilling/drill rig | DRILL | 1987-06-02T18:00:00 | -5.45580 | 59.94380 | -4107 | 1987-06-04T12:30:00 | 25 cores; 236.2 m cored; 0 m drilled; 80.3 % recovery | |||||
115-709 | Composite Core | COMPCORE | 1987-06-05T00:00:00 | -3.91500 | 60.55170 | -3045 | 1987-06-08T00:00:00 | 85 cores; 811.6 m cored; 0 m drilled; 92.3% recovery | |||||
115-709A | Drilling/drill rig | DRILL | 1987-06-05T01:30:00 | -3.91500 | 60.55170 | -3047 | 1987-06-06T06:30:00 | 21 core; 203.1 m cored; 0 m drilled; 91 % recovery | |||||
115-709B | Drilling/drill rig | DRILL | 1987-06-06T06:30:00 | -3.91500 | 60.55170 | -3049 | 1987-06-07T04:00:00 | 27 cores; 254.8 m cored; 0 m drilled; 92.1 % recovery | |||||
115-710 | Composite Core | COMPCORE | 1987-06-08T00:00:00 | -4.31170 | 60.98000 | -3822 | 1987-06-10T00:00:00 | 31 cores; 293.1 m cored; 0 m drilled; 87.8% recovery | |||||
115-710A | Drilling/drill rig | DRILL | 1987-06-08T20:45:00 | -4.31170 | 60.98000 | -3823 | 1987-06-10T00:00:00 | 22 cores; 209.7 m cored; 0 m drilled; 88.3 % recovery | |||||
115-710B | Drilling/drill rig | DRILL | 1987-06-10T00:00:00 | -4.31170 | 60.98000 | -3821 | 1987-06-10T15:00:00 | 9 cores; 83.4 m cored; 0 m drilled; 86.4 % recovery | |||||
115-711 | Composite Core | COMPCORE | 1987-06-11T00:00:00 | -2.74270 | 61.16300 | -4439.5 | 1987-06-13T00:00:00 | 37 cores; 347.9 m cored; 0 m drilled; 84.3% recovery | |||||
115-711A | Drilling/drill rig | DRILL | 1987-06-11T01:30:00 | -2.74270 | 61.16300 | -4439 | 1987-06-12T15:30:00 | 26 cores; 249.6 m cored; 0 m drilled; 81.7 % recovery | |||||
115-711B | Drilling/drill rig | DRILL | 1987-06-12T15:30:00 | -2.74270 | 61.16300 | -4440 | 1987-06-13T12:00:00 | 11 core; 98.3 m cored; 0 m drilled; 90.8 % recovery | |||||
115-712 | Composite Core | COMPCORE | 1987-06-16T00:00:00 | -4.21650 | 73.40630 | -2903 | 1987-06-16T00:00:00 | 12 cores; 115.3 m cored; 0 m drilled; 36% recovery | |||||
115-713 | Composite Core | COMPCORE | 1987-06-16T00:00:00 | -4.19300 | 73.39420 | -2920 | 1987-06-20T00:00:00 | 22 cores; 191.7 m cored; 0 m drilled; 60% recovery | |||||
115-712A | Drilling/drill rig | DRILL | 1987-06-16T01:15:00 | -4.21650 | 73.40630 | -2903 | 1987-06-16T20:15:00 | 12 cores; 115.3 m cored; 0 m drilled; 36 % recovery | |||||
115-713A | Drilling/drill rig | DRILL | 1987-06-16T23:30:00 | -4.19300 | 73.39420 | -2920 | 1987-06-20T09:15:00 | 22 cores; 191.7 m cored; 0 m drilled; 60 % recovery | |||||
115-714 | Composite Core | COMPCORE | 1987-06-23T00:00:00 | 5.06000 | 73.78670 | -2041 | 1987-06-24T00:00:00 | 38 cores; 355.6 m cored; 0 m drilled; 87.1% recovery | |||||
115-714A | Drilling/drill rig | DRILL | 1987-06-23T03:55:00 | 5.06000 | 73.78670 | -2041 | 1987-06-24T04:15:00 | 25 cores; 233 m cored; 0 m drilled; 83.5 % recovery | |||||
115-715 | Composite Core | COMPCORE | 1987-06-24T00:00:00 | 5.08150 | 73.83130 | -2273 | 1987-06-28T00:00:00 | 31 cores; 287.8 m cored; 0 m drilled; 47.8% recovery | |||||
115-714B | Drilling/drill rig | DRILL | 1987-06-24T04:15:00 | 5.06000 | 73.78670 | -2041 | 1987-06-24T14:30:00 | 13 cores; 122.6 m cored; 0 m drilled; 93.7 % recovery | |||||
115-715A | Drilling/drill rig | DRILL | 1987-06-24T16:00:00 | 5.08150 | 73.83130 | -2273 | 1987-06-28T07:45:00 | 31 core; 287.8 m cored; 0 m drilled; 47.8 % recovery | |||||
115-716 | Composite Core | COMPCORE | 1987-06-28T00:00:00 | 4.93330 | 73.28330 | -544 | 55 cores; 521.5 m cored; 0 m drilled; 101.6% recovery | ||||||
115-716A | Drilling/drill rig | DRILL | 1987-06-28T14:45:00 | 4.93330 | 73.28330 | -544 | 1987-06-29T12:30:00 | 27 cores; 257.1 m cored; 0 m drilled; 102.2 % recovery | |||||
115-716B | Drilling/drill rig | DRILL | 1987-06-29T00:00:00 | 4.93330 | 73.28330 | -544 | 28 cores; 264.4 m cored; 0 m drilled; 101.1 % recovery |