Event List of Leg11
Download as tab-delimited text
Event label | Optional label | Method/Device | Abbreviation | O2A Registry URI | Date/Time | Latitude | Longitude | Elevation | Date/Time end | Latitude end | Longitude end | Elevation end | Comment |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
11-98 | Drilling/drill rig | DRILL | 1970-04-09T00:00:00 | 25.38250 | -77.31130 | -2769 | 15 cores; 122 m cored; 0 m drilled; 59.2 % recovery | ||||||
11-98_Site | Composite Core | COMPCORE | 1970-04-09T00:00:00 | 25.38250 | -77.31130 | -2769 | 15 cores; 122 m cored; 0 m drilled; 59.2% recovery | ||||||
11-99A | Drilling/drill rig | DRILL | 1970-04-13T00:00:00 | 23.68570 | -73.84980 | -4914 | 10 cores; 53 m cored; 26 m drilled; 53.8 % recovery | ||||||
11-99_Site | Composite Core | COMPCORE | 1970-04-13T00:00:00 | 23.68570 | -73.84980 | -4914 | 10 cores; 53 m cored; 26 m drilled; 53.8% recovery | ||||||
11-99 | Drilling/drill rig | DRILL | 1970-04-13T00:00:00 | 23.68570 | -73.84980 | -4914 | MECHANICAL OR EQUIP FAILURE | ||||||
11-100 | Drilling/drill rig | DRILL | 1970-04-20T00:00:00 | 24.68780 | -73.79970 | -5325 | 13 cores; 93 m cored; 0 m drilled; 31.6 % recovery | ||||||
11-100_Site | Composite Core | COMPCORE | 1970-04-20T00:00:00 | 24.68780 | -73.79970 | -5325 | 13 cores; 93 m cored; 0 m drilled; 31.6% recovery | ||||||
11-101A | Drilling/drill rig | DRILL | 1970-04-24T00:00:00 | 25.19880 | -74.43850 | -4868 | 10 cores; 89 m cored; 0 m drilled; 26.4 % recovery | ||||||
11-101 | Drilling/drill rig | DRILL | 1970-04-24T00:00:00 | 25.19880 | -74.43850 | -4868 | 2 cores; 18 m cored; 0 m drilled; 87.8 % recovery | ||||||
11-101_Site | Composite Core | COMPCORE | 1970-04-24T00:00:00 | 25.19880 | -74.43850 | -4868 | 12 cores; 107 m cored; 0 m drilled; 36.7% recovery | ||||||
11-102 | Drilling/drill rig | DRILL | 1970-04-30T00:00:00 | 30.73220 | -74.45230 | -3426 | 19 cores; 109 m cored; 0 m drilled; 84.3 % recovery | ||||||
11-102_Site | Composite Core | COMPCORE | 1970-04-30T00:00:00 | 30.73220 | -74.45230 | -3426 | 19 cores; 109 m cored; 0 m drilled; 84.3% recovery | ||||||
11-103_Site | Composite Core | COMPCORE | 1970-05-05T00:00:00 | 30.45130 | -74.58320 | -3964 | 7 cores; 62 m cored; 0 m drilled; 63.2% recovery | ||||||
11-103 | Drilling/drill rig | DRILL | 1970-05-05T00:00:00 | 30.45130 | -74.58320 | -3964 | 7 cores; 62 m cored; 0 m drilled; 63.2 % recovery | ||||||
11-104_Site | Composite Core | COMPCORE | 1970-05-07T00:00:00 | 30.82750 | -74.32730 | -3811 | 9 cores; 74 m cored; 9 m drilled; 75.8% recovery | ||||||
11-104 | Drilling/drill rig | DRILL | 1970-05-07T00:00:00 | 30.82750 | -74.32730 | -3811 | 9 cores; 74 m cored; 9 m drilled; 75.8 % recovery | ||||||
11-105_Site | Composite Core | COMPCORE | 1970-05-13T00:00:00 | 34.89530 | -69.17330 | -5251 | 43 cores; 363 m cored; 0 m drilled; 54% recovery | ||||||
11-105 | Drilling/drill rig | DRILL | 1970-05-13T00:00:00 | 34.89530 | -69.17330 | -5251 | 43 cores; 363 m cored; 0 m drilled; 54 % recovery | ||||||
11-106A | Drilling/drill rig | DRILL | 1970-05-20T00:00:00 | 36.43350 | -69.46150 | -4500 | MECHANICAL OR EQUIP FAILURE | ||||||
11-106 | Drilling/drill rig | DRILL | 1970-05-20T00:00:00 | 36.43350 | -69.46150 | -4500 | 5 cores; 39 m cored; 9 m drilled; 55.1 % recovery | ||||||
11-106_Site | Composite Core | COMPCORE | 1970-05-20T00:00:00 | 36.42740 | -69.44585 | -4500 | 12 cores; 85.5 m cored; 9 m drilled; 64.2% recovery | ||||||
11-106B | Drilling/drill rig | DRILL | 1970-05-20T00:00:00 | 36.42130 | -69.43020 | -4500 | 7 cores; 46.5 m cored; 0 m drilled; 71.8 % recovery | ||||||
11-107_Site | Composite Core | COMPCORE | 1970-05-28T00:00:00 | 38.65980 | -72.47530 | -2571 | 1 cores; 3 m cored; 9 m drilled; 50% recovery | ||||||
11-107 | Drilling/drill rig | DRILL | 1970-05-28T00:00:00 | 38.65980 | -72.47530 | -2571 | 1 cores; 3 m cored; 9 m drilled; 50 % recovery | ||||||
11-108_Site | Composite Core | COMPCORE | 1970-05-29T00:00:00 | 38.80450 | -72.65350 | -1845 | 2 cores; 36 m cored; 134 m drilled; 20% recovery | ||||||
11-108 | Drilling/drill rig | DRILL | 1970-05-29T00:00:00 | 38.80450 | -72.65350 | -1845 | 2 cores; 36 m cored; 134 m drilled; 20 % recovery |