Event List of Leg108
Download as tab-delimited text
Event label | Optional label | Method/Device | Abbreviation | O2A Registry URI | Date/Time | Latitude | Longitude | Elevation | Date/Time end | Latitude end | Longitude end | Elevation end | Comment |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
108-657 | Composite Core | COMPCORE | 1986-02-27T00:00:00 | 21.33150 | -20.94880 | -4232 | 1986-03-03T00:00:00 | 38 cores; 344.3 m cored; 0 m drilled; 75.8% recovery | |||||
108-657A | Drilling/drill rig | DRILL | 1986-02-27T22:15:00 | 21.33150 | -20.94880 | -4232 | 1986-03-01T22:00:00 | 19 cores; 178.2 m cored; 0 m drilled; 71.6 % recovery | |||||
108-657B | Drilling/drill rig | DRILL | 1986-03-01T22:00:00 | 21.33150 | -20.94880 | -4232 | 1986-03-03T12:15:00 | 19 cores; 166.1 m cored; 0 m drilled; 80.4 % recovery | |||||
108-658 | Composite Core | COMPCORE | 1986-03-04T00:00:00 | 20.74920 | -18.58080 | -2274 | 1986-03-08T00:00:00 | 59 cores; 537.1 m cored; 0 m drilled; 100.8% recovery | |||||
108-658A | Drilling/drill rig | DRILL | 1986-03-04T15:15:00 | 20.74920 | -18.58080 | -2274 | 1986-03-07T01:15:00 | 33 cores; 300.4 m cored; 0 m drilled; 98.2 % recovery | |||||
108-658B | Drilling/drill rig | DRILL | 1986-03-07T02:15:00 | 20.74920 | -18.58080 | -2275 | 1986-03-08T00:45:00 | 18 cores; 163.8 m cored; 0 m drilled; 107.5 % recovery | |||||
108-658C | Drilling/drill rig | DRILL | 1986-03-08T00:45:00 | 20.74920 | -18.58080 | -2273 | 1986-03-08T16:00:00 | 8 cores; 72.9 m cored; 0 m drilled; 96.5 % recovery | |||||
108-659 | Composite Core | COMPCORE | 1986-03-09T00:00:00 | 18.07720 | -21.02620 | -3082.3 | 1986-03-12T00:00:00 | 59 cores; 551.9 m cored; 0 m drilled; 74.5% recovery | |||||
108-659A | Drilling/drill rig | DRILL | 1986-03-09T09:30:00 | 18.07720 | -21.02620 | -3082 | 1986-03-11T05:30:00 | 29 cores; 273.8 m cored; 0 m drilled; 63.9 % recovery | |||||
108-659B | Drilling/drill rig | DRILL | 1986-03-11T09:05:00 | 18.07720 | -21.02620 | -3084 | 1986-03-12T09:45:00 | 22 cores; 202.1 m cored; 0 m drilled; 81 % recovery | |||||
108-659C | Drilling/drill rig | DRILL | 1986-03-12T11:15:00 | 18.07720 | -21.02620 | -3081 | 1986-03-12T06:00:00 | 8 cores; 76 m cored; 0 m drilled; 95.4 % recovery | |||||
108-660 | Composite Core | COMPCORE | 1986-03-15T00:00:00 | 10.01350 | -19.24560 | -4343 | 1986-03-17T00:00:00 | 35 cores; 313.7 m cored; 0 m drilled; 97.5% recovery | |||||
108-660A | Drilling/drill rig | DRILL | 1986-03-15T00:30:00 | 10.01350 | -19.24560 | -4343 | 1986-03-16T10:30:00 | 19 cores; 164.9 m cored; 0 m drilled; 99.3 % recovery | |||||
108-660B | Drilling/drill rig | DRILL | 1986-03-16T10:30:00 | 10.01350 | -19.24560 | -4343 | 1986-03-17T12:15:00 | 16 cores; 148.8 m cored; 0 m drilled; 95.4 % recovery | |||||
108-661 | Composite Core | COMPCORE | 1986-03-17T00:00:00 | 9.44680 | -19.38610 | -4023.5 | 1986-03-21T00:00:00 | 41 cores; 377.8 m cored; 0 m drilled; 83.7% recovery | |||||
108-661A | Drilling/drill rig | DRILL | 1986-03-17T19:15:00 | 9.44680 | -19.38610 | -4023 | 1986-03-20T19:15:00 | 32 cores; 296.1 m cored; 0 m drilled; 79.3 % recovery | |||||
108-661B | Drilling/drill rig | DRILL | 1986-03-20T19:15:00 | 9.44680 | -19.38610 | -4024 | 1986-03-21T11:45:00 | 9 cores; 81.7 m cored; 0 m drilled; 99.7 % recovery | |||||
108-662 | Composite Core | COMPCORE | 1986-03-24T00:00:00 | -1.39020 | -11.73920 | -3824 | 1986-03-26T00:00:00 | 34 cores; 314 m cored; 0 m drilled; 101.5% recovery | |||||
108-662A | Drilling/drill rig | DRILL | 1986-03-24T03:00:00 | -1.39020 | -11.73920 | -3824 | 1986-03-25T07:45:00 | 22 cores; 200 m cored; 0 m drilled; 101.9 % recovery | |||||
108-662B | Drilling/drill rig | DRILL | 1986-03-25T07:45:00 | -1.39020 | -11.73920 | -3824 | 1986-03-26T12:15:00 | 12 cores; 114 m cored; 0 m drilled; 100.7 % recovery | |||||
108-663 | Composite Core | COMPCORE | 1986-03-26T00:00:00 | -1.19780 | -11.87850 | -3706 | 1986-03-28T00:00:00 | 32 cores; 299.2 m cored; 0 m drilled; 91.1% recovery | |||||
108-663A | Drilling/drill rig | DRILL | 1986-03-26T17:30:00 | -1.19780 | -11.87850 | -3706 | 1986-03-27T13:45:00 | 16 cores; 147.2 m cored; 0 m drilled; 80.9 % recovery | |||||
108-663B | Drilling/drill rig | DRILL | 1986-03-27T13:45:00 | -1.19780 | -11.87850 | -3706 | 1986-03-28T09:45:00 | 16 cores; 152 m cored; 0 m drilled; 101 % recovery | |||||
108-664 | Composite Core | COMPCORE | 1986-03-30T00:00:00 | 0.10730 | -23.22750 | -3807.2 | 1986-04-02T00:00:00 | 66 cores; 614.5 m cored; 0 m drilled; 100% recovery | |||||
108-664A | Drilling/drill rig | DRILL | 1986-03-30T16:05:00 | 0.10730 | -23.22750 | -3806 | 1986-03-30T23:30:00 | 1 core; 9.5 m cored; 0 m drilled; 101.5 % recovery | |||||
108-664B | Drilling/drill rig | DRILL | 1986-03-30T23:30:00 | 0.10730 | -23.22750 | -3806 | 1986-03-31T23:09:00 | 26 cores; 247 m cored; 0 m drilled; 99.2 % recovery | |||||
108-664C | Drilling/drill rig | DRILL | 1986-03-31T00:00:00 | 0.10730 | -23.22750 | -3810 | 1986-04-01T07:30:00 | 7 cores; 61.2 m cored; 0 m drilled; 93.4 % recovery | |||||
108-664D | Drilling/drill rig | DRILL | 1986-04-01T07:30:00 | 0.10730 | -23.22750 | -3807 | 1986-04-02T13:00:00 | 32 cores; 296.8 m cored; 0 m drilled; 102 % recovery | |||||
108-665 | Composite Core | COMPCORE | 1986-04-03T00:00:00 | 2.95120 | -19.66780 | -4746 | 1986-04-05T00:00:00 | 20 cores; 179.9 m cored; 0 m drilled; 95.9% recovery | |||||
108-665A | Drilling/drill rig | DRILL | 1986-04-03T21:00:00 | 2.95120 | -19.66780 | -4746 | 1986-04-04T19:00:00 | 11 core; 97.9 m cored; 0 m drilled; 102.1 % recovery | |||||
108-665B | Drilling/drill rig | DRILL | 1986-04-04T19:00:00 | 2.95120 | -19.66780 | -4746 | 1986-04-05T17:00:00 | 9 cores; 82 m cored; 0 m drilled; 88.4 % recovery | |||||
108-666 | Composite Core | COMPCORE | 1986-04-06T00:00:00 | 3.49730 | -20.16720 | -4519.3 | 1986-04-07T00:00:00 | 16 cores; 150.5 m cored; 0 m drilled; 100% recovery | |||||
108-666A | Drilling/drill rig | DRILL | 1986-04-06T08:35:00 | 3.49730 | -20.16720 | -4519.3 | 1986-04-07T21:15:00 | 16 cores; 150.5 m cored; 0 m drilled; 100 % recovery | |||||
108-667 | Composite Core | COMPCORE | 1986-04-08T00:00:00 | 4.56920 | -21.91130 | -3529.3 | 1986-04-13T00:00:00 | 56 cores; 520.9 m cored; 0 m drilled; 84% recovery | |||||
108-667A | Drilling/drill rig | DRILL | 1986-04-08T13:45:00 | 4.56920 | -21.91130 | -3529.3 | 1986-04-12T10:00:00 | 41 core; 381.3 m cored; 0 m drilled; 81.1 % recovery | |||||
108-667B | Drilling/drill rig | DRILL | 1986-04-12T10:00:00 | 4.56920 | -21.91130 | -3529.3 | 1986-04-13T08:00:00 | 15 cores; 139.6 m cored; 0 m drilled; 92.1 % recovery | |||||
108-668 | Composite Core | COMPCORE | 1986-04-13T00:00:00 | 4.76870 | -20.92700 | -2693.5 | 1986-04-15T00:00:00 | 5 cores; 40 m cored; 0 m drilled; 100% recovery | |||||
108-668A | Drilling/drill rig | DRILL | 1986-04-13T17:00:00 | 4.76870 | -20.92700 | -2693.5 | 1986-04-14T11:30:00 | 1 core; 8.8 m cored; 0 m drilled; 99.9 % recovery | |||||
108-668B | Drilling/drill rig | DRILL | 1986-04-14T11:30:00 | 4.76870 | -20.92700 | -2693.5 | 1986-04-15T04:45:00 | 4 cores; 31.2 m cored; 0 m drilled; 100 % recovery |