Event List of Leg103
Download as tab-delimited text
Event label | Optional label | Method/Device | Abbreviation | O2A Registry URI | Date/Time | Latitude | Longitude | Elevation | Date/Time end | Latitude end | Longitude end | Elevation end | Comment |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
103-637 | Composite Core | COMPCORE | 1985-04-28T00:00:00 | 42.08830 | -12.86330 | -5321 | 1985-05-04T00:00:00 | 30 cores; 285.6 m cored; 0 m drilled; 40.7% recovery | |||||
103-637A | Drilling/drill rig | DRILL | 1985-04-28T18:00:00 | 42.08830 | -12.86330 | -5321 | 1985-05-04T21:00:00 | 30 cores; 285.6 m cored; 0 m drilled; 40.7 % recovery | |||||
103-638 | Composite Core | COMPCORE | 1985-05-05T00:00:00 | 42.15330 | -12.19670 | -4673 | 1985-06-03T00:00:00 | 60 cores; 610.9 m cored; 0 m drilled; 41% recovery | |||||
103-638A | Drilling/drill rig | DRILL | 1985-05-05T06:15:00 | 42.15330 | -12.19670 | -4673 | 1985-05-06T00:15:00 | 1 core; 44.6 m cored; 0 m drilled; 0 % recovery | |||||
103-638B | Drilling/drill rig | DRILL | 1985-05-06T00:15:00 | 42.15330 | -12.19670 | -4673 | 1985-05-12T23:15:00 | 45 cores; 431.1 m cored; 0 m drilled; 49.4 % recovery | |||||
103-639 | Composite Core | COMPCORE | 1985-05-23T00:00:00 | 42.14330 | -12.25333 | -4763.2 | 1985-06-08T00:00:00 | 34 cores; 303.4 m cored; 0 m drilled; 26.6% recovery | |||||
103-639A | Drilling/drill rig | DRILL | 1985-05-23T09:45:00 | 42.14330 | -12.24830 | -4735 | 1985-05-25T23:45:00 | 10 cores; 89.8 m cored; 0 m drilled; 39.8 % recovery | |||||
103-639B | Drilling/drill rig | DRILL | 1985-05-25T23:45:00 | 42.14330 | -12.25000 | -4758 | 1985-05-27T05:45:00 | 4 cores; 26.2 m cored; 0 m drilled; 48.4 % recovery | |||||
103-639C | Drilling/drill rig | DRILL | 1985-05-27T05:45:00 | 42.14330 | -12.25170 | -4792 | 1985-05-27T19:45:00 | 2 cores; 22.4 m cored; 0 m drilled; 21.6 % recovery | |||||
103-639D | Drilling/drill rig | DRILL | 1985-05-27T19:45:00 | 42.14330 | -12.25500 | -4753 | 1985-06-01T07:00:00 | 12 cores; 113.5 m cored; 0 m drilled; 21.6 % recovery | |||||
103-638C | Drilling/drill rig | DRILL | 1985-06-01T18:00:00 | 42.15330 | -12.19670 | -4673 | 1985-06-03T20:30:00 | 14 cores; 135.2 m cored; 0 m drilled; 27.9 % recovery | |||||
103-640 | Composite Core | COMPCORE | 1985-06-04T00:00:00 | 42.01670 | -12.46330 | -5201 | 1985-06-06T00:00:00 | 9 cores; 86.8 m cored; 0 m drilled; 18.1% recovery | |||||
103-640A | Drilling/drill rig | DRILL | 1985-06-04T01:00:00 | 42.01670 | -12.46330 | -5201 | 1985-06-06T02:00:00 | 9 cores; 86.8 m cored; 0 m drilled; 18.1 % recovery | |||||
103-639E | Drilling/drill rig | DRILL | 1985-06-06T06:45:00 | 42.14330 | -12.25670 | -4770 | 1985-06-07T13:45:00 | 4 cores; 38.5 m cored; 0 m drilled; 5.1 % recovery | |||||
103-639F | Drilling/drill rig | DRILL | 1985-06-07T13:45:00 | 42.14330 | -12.25830 | -4771 | 1985-06-08T02:15:00 | 2 cores; 13 m cored; 0 m drilled; 6.8 % recovery | |||||
103-641 | Composite Core | COMPCORE | 1985-06-08T00:00:00 | 42.15500 | -12.18170 | -4648.3 | 1985-06-15T00:00:00 | 23 cores; 217.8 m cored; 35 m drilled; 70.2% recovery | |||||
103-641A | Drilling/drill rig | DRILL | 1985-06-08T03:30:00 | 42.15500 | -12.18170 | -4646 | 1985-06-10T14:30:00 | 7 cores; 63.6 m cored; 0 m drilled; 63.5 % recovery | |||||
103-641B | Drilling/drill rig | DRILL | 1985-06-10T14:03:00 | 42.15500 | -12.18170 | -4649 | 1985-06-11T10:45:00 | 0 cores; 0 m cored; 35 m drilled | |||||
103-641C | Drilling/drill rig | DRILL | 1985-06-11T10:45:00 | 42.15500 | -12.18170 | -4650 | 1985-06-15T13:30:00 | 16 cores; 154.2 m cored; 0 m drilled; 72.9 % recovery |