Event List of Exp317
Download as tab-delimited text
Event label | Optional label | Method/Device | Abbreviation | O2A Registry URI | Date/Time | Latitude | Longitude | Elevation | Date/Time end | Latitude end | Longitude end | Elevation end | Comment |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
317-U1351A | Drilling/drill rig | DRILL | 2009-11-18T09:30:00 | -44.88384 | 171.84006 | -122.3 | 2009-11-18T23:30:00 | 6 cores; 28 m cored; 98 % recovered; 0 m drilled; 28 m penetrated | |||||
317-U1351B | Drilling/drill rig | DRILL | 2009-11-18T23:30:00 | -44.88403 | 171.84010 | -121.7 | 2009-11-25T18:00:00 | 116 cores; 1030.6 m cored; 30 % recovered; 0 m drilled; 1030.6 m penetrated | |||||
317-U1351C | Drilling/drill rig | DRILL | 2009-11-25T18:00:00 | -44.88428 | 171.84009 | -121.7 | 2009-11-30T02:00:00 | NA cores; 0 m cored; NA % recovered; 967.3 m drilled; 967.3 m penetrated | |||||
317-U1352A | Drilling/drill rig | DRILL | 2009-11-30T05:00:00 | -44.93740 | 172.02269 | -343.8 | 2009-11-30T15:30:00 | 5 cores; 42.2 m cored; 104 % recovered; 0 m drilled; 42.2 m penetrated | |||||
317-U1352B | Drilling/drill rig | DRILL | 2009-11-30T15:30:00 | -44.93759 | 172.02271 | -343.6 | 2009-12-05T16:15:00 | 94 cores; 830.9 m cored; 74 % recovered; 0 m drilled; 830.9 m penetrated | |||||
317-U1352C | Drilling/drill rig | DRILL | 2009-12-05T16:15:00 | -44.93777 | 172.02271 | -343.5 | 2009-12-20T22:00:00 | 148 cores; 1296.4 m cored; 51 % recovered; 631.1 m drilled; 1927.5 m penetrated | |||||
317-U1352D | Drilling/drill rig | DRILL | 2009-12-20T22:00:00 | -44.93721 | 172.02268 | -344.2 | 2009-12-21T21:00:00 | 14 cores; 127 m cored; 103 % recovered; 0 m drilled; 127 m penetrated | |||||
317-U1353A | Drilling/drill rig | DRILL | 2009-12-21T23:15:00 | -44.76846 | 171.67394 | -84.2 | 2009-12-22T11:15:00 | 8 cores; 56 m cored; 101 % recovered; 0 m drilled; 56 m penetrated | |||||
317-U1353B | Drilling/drill rig | DRILL | 2009-12-22T11:15:00 | -44.76867 | 171.67401 | -84.7 | 2009-12-26T20:45:00 | 98 cores; 614.3 m cored; 34 % recovered; 0 m drilled; 614.3 m penetrated | |||||
317-U1353C | Drilling/drill rig | DRILL | 2009-12-26T20:45:00 | -44.76830 | 171.67396 | -84.7 | 2009-12-28T21:00:00 | NA cores; 0 m cored; NA % recovered; 529 m drilled; 529 m penetrated | |||||
317-U1354A | Drilling/drill rig | DRILL | 2009-12-28T23:45:00 | -44.84713 | 171.78682 | -109.8 | 2009-12-29T23:00:00 | 19 cores; 85.4 m cored; 101 % recovered; 0 m drilled; 85.4 m penetrated | |||||
317-U1354B | Drilling/drill rig | DRILL | 2009-12-29T23:00:00 | -44.84727 | 171.78678 | -113.4 | 2009-12-30T12:45:00 | 15 cores; 77.2 m cored; 100 % recovered; 0 m drilled; 77.2 m penetrated | |||||
317-U1354C | Drilling/drill rig | DRILL | 2009-12-30T12:45:00 | -44.84747 | 171.78680 | -113.4 | 2010-02-01T12:00:00 | 36 cores; 319.2 m cored; 42 % recovered; 65 m drilled; 384.2 m penetrated | |||||
317-U1352 | Composite Core | COMPCORE | -44.93700 | 172.02200 |